12 Hoofdwegennet | Standontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Verplichtingen | 2.634.014 | 0 | 1.658.532 | 4.292.546 | 206.079 | 130.995 | – 39.309 | – 17.438 |
Uitgaven | 2.728.863 | 0 | – 154.033 | 2.574.830 | – 114.308 | – 71.599 | – 669.495 | – 148.024 |
Waarvan juridisch verplicht | 100% |
|
| 100% |
|
|
|
|
12.01 Verkeersmanagement | 22.072 | 0 | – 1.499 | 20.573 | – 313 | – 658 | – 531 | 180 |
12.01.01 Basispakket verkeersmanagement | 22.072 | 0 | – 1.499 | 20.573 | – 313 | – 658 | – 531 | 180 |
12.02 Beheer, onderhoud en vervanging | 413.384 | 0 | 140.491 | 553.875 | 136.224 | 218.946 | 109.831 | 31.085 |
12.02.01 Beheer en onderhoud | 339.249 | 0 | 124.729 | 463.978 | 128.817 | 142.470 | 92.771 | 27.802 |
12.02.02 Servicepakket B&O | 0 | 0 | 508 | 508 | ||||
12.02.04 Vervanging | 74.135 | 0 | 15.254 | 89.389 | 7.407 | 76.476 | 17.060 | 3.283 |
12.03 Aanleg | 1.451.135 | 0 | – 223.503 | 1.227.632 | – 245.662 | – 268.520 | – 932.007 | – 175.732 |
12.03.01 Realisatie | 1.042.578 | 0 | 149.233 | 1.191.811 | 368.961 | 427.701 | 651.556 | 616.688 |
12.03.02 Verkenningen en planuitwerkingen | 408.557 | 0 | – 372.736 | 35.821 | – 614.623 | – 696.221 | – 1.583.563 | – 792.420 |
12.04 GIV/PPS | 420.256 | 0 | – 82.652 | 337.604 | – 13.671 | – 27.382 | 149.400 | – 5.021 |
12.05 Verkenn.en planuitw.voor tracébesluit | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
12.05.01 Verkenningen | 0 | 0 | 0 | 0 | ||||
12.05.02 Planuitwerking voor tracébesluit | 0 | 0 | 0 | 0 | ||||
12.06 Netwerkgebonden kosten HWN | 422.016 | 0 | 13.130 | 435.146 | 9.114 | 6.015 | 3.812 | 1.464 |
12.06.01 Apparaatskosten RWS | 367.678 | 0 | 13.005 | 380.683 | 10.122 | 7.024 | 4.823 | 2.475 |
12.06.02 Overige netwerkgebonden kosten | 54.338 | 0 | 125 | 54.463 | – 1.008 | – 1.009 | – 1.011 | – 1.011 |
12.07 Investeringsruimte | 0 | 0 | 0 | 0 | ||||
12.09 Ontvangsten | 262.105 | 0 | – 134.654 | 127.451 | – 18.901 | 36.034 | – 350.682 | 29.386 |
Verplichtingen
Bij de projecten A4 Delft Schiedam, ZSM, Hoek Schoondijken, Assen Zuidbroek en Schiphol Amsterdam Almere zijn geraamde betalingsverplichtingen niet in 2012 aangegaan maar worden in 2013 vastgelegd, de verplichtingenbudgetten zijn derhalve doorgeschoven naar 2013.
12.03 Aanleg
Realisatieprogramma Hoofdwegennet (12.03.01) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | |
---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | |||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |||
Uitgaven | 1.043 | 0 | 149 | 1.192 | 368 | 428 | 652 | 616 |
|
|
Projecten Nationaal | ||||||||||
Dynamisch verkeersmanagement | 19 | – 9 | 10 | – 9 | 16 | 1 | ||||
Kleine projecten / Afronding projecten | 35 | – 15 | 20 | – 8 | 11 | 10 | 3 | |||
Programma 130 km | 13 | 20 | 33 | – 2 | 5 | |||||
Programma aansluitingen | 18 | – 14 | 4 | – 46 | 16 | 20 | 14 | 1 | ||
Quick Wins Wegen | 6 | – 5 | 1 | 24 | – 9 | |||||
ZSM 1+2 (spoedwet wegverbreding) | 161 | – 39 | 122 | – 9 | 25 | – 94 | 63 | – 19 | 2016 | |
Projecten Noordwest-Nederland | ||||||||||
A10 Amsterdam praktijkproef FES | 10 | – 6 | 4 | 11 | 1 | 2015 | ||||
A9 Alkmaar – Uitgeest | 0 | – 6 | 5 | |||||||
N9 Koedijk – De Stolpen | 10 | – 7 | 3 | – 7 | – 16 | |||||
N50 Ramspol – Ens | 12 | – 1 | 11 | – 1 | 1 | 1 | 2012 | |||
A1/A6/A9 Schiphol/Adam-Almere | 90 | 90 | 225 | 280 | 642 | 651 | 2916 | |||
A9 Badhoevedorp | 6 | 6 | – 5 | – 14 | – 9 | – 7 | 331 | |||
Projecten Utrecht | ||||||||||
A2 Holendrecht – Oudenrijn | 21 | 2 | 23 | 32 | 20 | 55 | ||||
A2 Oudenrijn – Everdingen | 13 | – 11 | 2 | 11 | 1 | |||||
A28 Utrecht – Amersfoort | 39 | 14 | 53 | 2 | 1 | 2 | ||||
Projecten Zuidvleugel | ||||||||||
A4 Burgerveen – Leiden | 77 | – 53 | 24 | 8 | 11 | 6 | – 1 | 5 | ||
A4 Delft – Schiedam | 140 | 5 | 145 | – 42 | – 48 | 1 | – 186 | – 266 | ||
A12 Zoetermeer – Zoetermeer centrum | 0 | |||||||||
A15 Maasvlakte-Vaanplein | 0 | 0 | ||||||||
Projecten Zuidwestelijke Delta | ||||||||||
N57/N59 EuroRAP (verkeersveiligheid) | 1 | – 8 | 3 | 3 | 10 | |||||
N57 Veersedam – Middelburg | 1 | 1 | ||||||||
N61 Hoek-Schoondijke | – 1 | – 1 | – 6 | – 4 | 3 | 7 | 118 | |||
Projecten Brabant | ||||||||||
A4 Dinteloord – Bergen op Zoom | 65 | – 11 | 54 | 13 | 7 | 5 | 4 | |||
N2 Meerenakkerweg (A2 zone) | 2 | 4 | 6 | 4 | 2014 | |||||
Projecten Limburg | ||||||||||
A2 Maasbracht – Geleen, 1e fase | 9 | – 3 | 6 | – 16 | 2 | 8 | 2 | |||
A2 Passage Maastricht | 87 | 53 | 140 | – 9 | – 6 | – 16 | 54 | |||
A2/A76 Maatregelenpakket Limburg | 52 | – 52 | 0 | 46 | 6 | – 13 | 14 | |||
A74 Venlo | 3 | – 1 | 2 | – 22 | 1 | 6 | – 13 | |||
Projecten Oost-Nederland | ||||||||||
A2 Everdingen – Deil en Zaltbommel-Empel | 0 | – 1 | 1 | |||||||
A50 Ewijk – Valburg | 74 | – 45 | 29 | – 19 | 26 | 7 | ||||
N34 Omleiding Ommen | 2 | – 1 | 1 | 2 | ||||||
N35 Zwolle – Almelo (traverse Nijverdal) | 22 | 47 | 69 | 20 | 2 | 76 | ||||
N33 Assen (zuid)-Zuidbroek | 22 | 22 | 205 | |||||||
Projecten Noord-Nederland | ||||||||||
N31 Leeuwarden (De Haak) | 62 | 9 | 71 | 13 | – 7 | – 3 | 12 | |||
Overige maatregelen | ||||||||||
Meer kwaliteit leefomgeving | 2 | 2 | ||||||||
Meer veilig 2 | 29 | – 2 | 27 | |||||||
Verzorgingsplaatsen | 3 | 3 | – 15 | 5 | 10 | |||||
Afrondingen | 1 | 1 | 2 | 2 | – 1 | 2 | ||||
Realisatieuitgaven op IF 12.03.01 mbt planuitwerking | 56 | 151 | 207 | 189 | 93 | 53 | 52 |
-
a) Naast een aanpassing van het budget ten behoeve van prijsbijstelling, heeft de mutatie voornamelijk betrekking op het convenant Vathorst ten behoeve van met name de grondaankoop Corlaer en een tegenvaller op het project Viaduct Hanzelijn (N50 H'broek-Kampen). Dit laatste in het kader van de afronding van het project.
-
b) Uit het Servicepakket Meer veilig wordt ruim € 3 mln. ten behoeve van dit project overgeboekt. Voorts wordt bijna € 2 mln. aan prijsbijstelling toegevoegd.
-
c) Op basis van recente ramingen is op dit project een meevaller van € 9 mln. ontstaan, die conform begrotingsregels wordt aangewend om tegenvallers op te lossen.
-
d) Aan dit project wordt ca. € 10 mln. aan prijsbijstelling toegevoegd. Anderzijds wordt in totaal ca. € 29 mln. overgeboekt naar A12 Gouda – Woerden (NSL scherm), A28 Utrecht – Amersfoort (door een scopewijziging) en naar de BDU in de begroting van HXII (toezegging ten behoeve van maatregelen op de ring Zwolle tussen A28 en N35.
-
e) Bij dit project is een meevaller ontstaan als gevolg van recente ramingen.
-
f) Naast een toevoeging van ca. € 2 mln. aan prijsbijstelling en de verwerking van een desaldering van ca. € 3 mln. (bij de ontvangsten is de realisatie lager uitgekomen dan verwacht, het verschil wordt gedesaldeerd met de uitgavenplanning), wordt het budget bij dit project als gevolg van meerkosten, zoals gemeld in Kamerstukken II, 2011–2012, 29 296, nr. 17, met € 56 mln. bijgesteld.
-
g) De mutatie betreft een toevoeging uit hoofde van de prijsbijtelling alsmede een overboeking binnen dit artikel ten behoeve van een NSL scherm bij dit project.
-
h) De mutatie op het projectbudget van de A4 Delft – Schiedam van € 266 mln. wordt veroorzaakt door een aanbestedingsmeevaller van € 292,5 mln., een tegenvaller als gevolg van extra kosten Kethelplein, Hoogheemraadschap van € 10,3 mln. en door de toevoeging van de prijsbijstelling 2012 van € 16 mln. De aanbestedingsmeevaller wordt ingezet voor meerkosten bij de N35 Nijverdal (zie toelichting m) en bij de A2 Holendrecht – Oudenrijn (zie toelichting f). Daarnaast is een reservering getroffen voor potentiële tegenvallers (waaronder uitkomst lopend arbitragetraject 2e Coentunnel en uitvoeringsrisico’s A4 Delft-Schiedam) onder bestemd op het onderdeel verkenningen en planuitwerkingen onder «overige projecten in voorbereiding en gesignaleerde risico’s» en heeft er een toevoeging aan het Beheer en Onderhoudsbudget plaatsgevonden naar aanleiding van de motie De Jong/De Rouwe (zie onderdeel 5 van de algemene toelichting).
-
i) Deze projecten zijn in verband met een fasewijziging overgeboekt uit verkenningen en planuitwerking op 12.03.02.
-
j) In verband met een scopewijziging als gevolg van de tunnelproblematiek wordt, naast een toevoeging van ca. € 7 mln. aan prijsbijstelling, bijna € 48 mln. aan dit projectbudget toegevoegd.
-
k) Door met name minder opgetreden risico's, is een meevaller van bijna € 15 mln. ontstaan. Voorts is nog ca. € 1 mln. aan prijsbijstelling aan het budget toegevoegd.
-
l) Naast een toevoeging uit hoofde van prijsbijstelling, wordt bijna € 4 mln. toegevoegd ten behoeve van een NSL scherm.
-
m) Aan dit project wordt € 35 mln. toegevoegd om de begroting in overeenstemming te brengen met de raming en het gewenste kasritme. Dit naar aanleiding van het beschikbaar stellen van budget uit de € 100 mln. reservering tunnelproblematiek. Verder wordt als gevolg van meerkosten door onder meer toezeggingen richting de omgeving, tegenvallers bij de reguliere werkzaamheden voordat aanbesteding plaatsvond en spoorgerelateerde zaken, € 39 mln. aan het projectbudget toegevoegd. Verder wordt nog ca. € 1 mln. toegevoegd in het kader van de verdeling van prijsbijstelling.
-
n) Naast een overboeking uit 12.03.02 in verband met een fasewisseling, wordt een desaldering aangebracht van ca. € 19 mln. als bijdrage van de provincie Groningen inzake het Klaverblad en wordt ca. € 3 mln. aan indexatie 2012 aan dit project toegevoegd.
-
o) De prijsbijstelling ten behoeve van dit project bedraagt ca. € 3 mln. Daarnaast is een tegenvaller ontstaan van € 9 mln. doordat de aanbesteding is tegengevallen.
12.03.02 Verkenningen en planuitwerkingen
Projectenoverzicht behorende bij 12.03.02 Verkenningen en Planuitwerkingen Projectomschrijving | Stand projectbudget MIRT 2013 | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | ||
---|---|---|---|---|---|
Kasmutatie | Budgetwijziging | ||||
Realisatieuitgaven op IF12.03.01 mbt planuitwerkingsprojecten | – 764 | – 283 | 400 | – 364 | |
Projecten Nationaal | |||||
Beter Benutten | 528 | – 47 | – 59 | 469 | a) |
Geluidsaneringprogramma – weg | 255 | – 4 | 255 | b) | |
Lucht – weg (NSL hoofdwegennet) | 248 | – 1 | – 5 | 243 | c) |
EPK Planuitwerking Hoofdwegennet | 145 | – 26 | 89 | 234 | d) |
Projecten Noordwest-Nederland | |||||
A1/A6/A9 Schiphol/Adam-Almere, deeltraject 4/5 | 4.118 | – 3.079 | 1.039 | e) | |
A9 Badhoevedorp | 326 | – 326 | 0 | e) | |
A10 Zuidas | 629 | 10 | – 2 | 627 | f) |
A10 Zuidas (Knopen) | 320 | 6 | 326 | ||
N23 Alkmaar-Zwolle | 57 | – 21 | 36 | g) | |
Projecten Utrecht | |||||
A2/12/27 Ring Utrecht | 1.079 | 1 | – 125 | 954 | h) |
A2/12/27 Ring Utrecht/fase 2 | 145 | 3 | 148 | h) | |
A27/A1 Utrecht Noord-knpt Eemnes-aansluiting Bunschoten | 252 | 2 | 5 | 257 | |
A28/A1 Knooppunt Hoevelaken | 676 | 4 | 12 | 688 | |
Projecten Zuidwestelijke Delta | |||||
N57/N59 EuroRAP (verkeersveiligheid) | 10 | – 10 | 0 | e) | |
N61 Hoek-Schoondijke | 117 | – 117 | 0 | e) | |
Projecten Oost-Nederland | |||||
A1 Beekbergen-Apeldoorn Zuid | 35 | 35 | |||
A12 Ede-Grijsoord | 107 | 1 | 2 | 109 | |
A12/A15 Bereikb.heid regio Arnhem-Nijmegen (excl tolopgave) | 517 | 18 | 10 | 527 | |
N18 Varsseveld | 308 | – 58 | 4 | 312 | |
N35 Zwolle-Wijthmen | 46 | 1 | 47 | I) | |
Risicoreservering tegenvallende tolopbrengsten A12/A15 | 60 | 60 | |||
Projecten Noord-Nederland | |||||
A7 Zuidelijke Ringweg Groningen, fase 21 | 522 | 3 | 21 | 543 | j) |
N33 Assen (zuid)-Zuidbroek | 176 | – 176 | 0 | e) | |
Gebonden | |||||
Projecten Nationaal | |||||
Programma Beter Benutten | 50 | 50 | |||
Reservering meerkosten tunnelveiligheid | 100 | – 83 | 17 | k) | |
Reservering tolopgave DBFM-aanbestedingen NWO, A13/A16 en A12/A15 | 301 | 301 | |||
Reserveringen voor LCC (o.a. Zuidas-knopen, Ring Utrecht en NWO) | 208 | 15 | 223 | l) | |
Projecten Noordwest-Nederland | |||||
Stedelijke Bereikbaarheid Almere (VSBA) | 25 | 25 | |||
Projecten Zuidvleugel | |||||
A4 Haaglanden (passage en poorten&inprikkers) | 425 | 8 | 433 | ||
A4/A44 Holland Rijnlandroute | 535 | 11 | 546 | ||
A13/A16/A20 R'dam (excl. tolopgave van € 245 mln.) | 700 | 3 | 700 | ||
Projecten Brabant | |||||
A58 Tilburg – Eindhoven en Sint Annabosch-Galder | 425 | 9 | 434 | ||
Projecten Limburg | |||||
A2 Het Vonderen Kerensheide (v/h Maasbracht-Geleen)2 | 250 | 250 | |||
A27 Houten – Hooipolder | 695 | 1 | 14 | 709 | m) |
Projecten Oost-Nederland | |||||
N35 Wierden – Nijverdal | 40 | 40 | |||
N35 Wijthmen – Nijverdal | 5 | – 5 | 0 | n) | |
N50 Kampen – Kampen Zuid (N50 Hattemerbroek-Ramspol 2x2) | 8 | – 8 | 0 | o) | |
Bestemd | 2.086 | 15 | 165 | 2.251 | p) |
Projecten in voorbereiding: | |||||
Projecten Nationaal | |||||
Projecten Noordwest-Nederland | |||||
A7/A8/A10 Amsterdam Noord, corridor | |||||
Projecten Zuidvleugel | |||||
A20 Nieuwerkerk-Gouwe | |||||
Nieuwe Westelijke Oeververbinding (NWO) | |||||
Projecten Utrecht | |||||
Ring Utrecht: Rijksbijdrage aan de noordelijke randweg | |||||
Projecten Brabant | |||||
N65 | |||||
Projecten Oost-Nederland | |||||
A1 Zone (Apeldoorn-Deventer-Azelo) | |||||
– Overige projecten in voorbereiding | |||||
Gesignaleerde Risico's | |||||
Totaal programma planuitwerking en verkenning | 15.765 | – 3.241 | 12.524 | ||
Nog niet met maatregelen belegde Taakstelling Aanleg uhv BA | – 1.383 | 1.383 | 0 | q) | |
Begroting IF 12.03.02 | 14.381 | – 1.858 | 12.523 | ||
Art. 12.02 nog niet met maatr.belegde taakst. BenO uhv BA | – 117 | 117 | 0 | r) |
-
a) De budgetwijziging van € 59 mln. wordt voor ca. € 11 mln. veroorzaakt door de toevoeging van de prijsbijstelling 2012. Daarnaast is in totaal € 81 mln. overgeboekt van het Infrastructuurfonds naar de BDU en het Provinciefonds. Verder is een desaldering aangebracht van ca. € 11 mln. in verband met hogere ontvangsten van het Stadsgewest Haaglanden (A13 Rijswijk – Ypenburg: verlengen opstelstrook) en omdat veel lagere overheden bijdragen aan de Beter Benutten projecten.
-
b) De kasreeks is in overeenstemming gebracht met de actuele planning met betrekking tot de uitgaven in 2013 en latere jaren.
-
c) Dit betreft enerzijds een toevoeging van de prijsbijstelling 2012 van ca. € 2 mln. en anderzijds een herschikking binnen het artikel van ca. € 8 mln. voor de realisatie van geluidsschermen.
-
d) Naast een toevoeging van ca. € 3 mln. in het kader van de prijsbijstelling 2012, wordt ca. € 87 mln. toegevoegd ten behoeve van externe kosten planuitwerkingen.
-
e) Deze projecten zijn in verband met een fasewijziging overgeboekt naar het realisatieprogramma op 12.03.01
-
f) Dit betreft uitgaven voor het project Zuidas die via de gemeente Amsterdam worden gerealiseerd. Het budget is via de BDU ter beschikking gesteld.
-
g) Als maatregel in het kader van de taakstelling op het Infrastructuurfonds is de dekking op artikel 12.03.02 voor de tweede kraal van het project N23 komen te vervallen. Zie ook de toelichting onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II.
-
h) Het budget voor de A27 Ring Utrecht is per saldo verlaagd met € 122 mln. als gevolg van een overheveling van budget naar de Ring Utrecht rijksbijdrage aan de NRU, de toevoeging van prijsbijstelling over 2012 en de verwerking van € 15 mln. voor aanvullende leefbaarheids- en inpassingsmaatregelen.
-
i) Het taakstellend budget is aangepast naar aanleiding van bestuurlijke afspraak dat regio extra garant staat voor € 0,5 mln.
-
j) Het taakstellend budget exclusief voorbereidingskosten is verhoogd met € 10 mln. Dit betreft een correctie van de verdeling van het budget bestemd voor voorbereiding (begroot op artikel 12.06) en voor de realisatie. Na indexatie naar prijspeil 2012 is het taakstellend budget € 596 mln. Hiervan is € 542 mln. gedekt op artikel 12 en € 54 mln. gedekt op artikel 14.
-
k) Uit de reservering meerkosten tunnelveiligheid is ca. 83 mln. overgeboekt naar 12.03.01; € 35 mln. voor de N35 Zwolle – Almelo (traverse Nijverdal) en ca. € 48 mln. voor de A2 Maastricht.
-
l) Ter dekking van de consequenties voor beheer en onderhoud van de aanleg van het project A1 zone is € 15 mln. toegevoegd aan Reserveringen voor LCC.
-
m) De aanpassing van het budget is voornamelijk als gevolg van de taakstelling Rutte I en II (zie ook de toelichting onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II).
-
n) Als maatregel in het kader op het Infrastructuurfonds is de dekking voor dit project komen te vervallen (zie ook de toelichting onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II. Voor verkeersveiligheidsmaatregelen op de N35 Wijthmen – Nijverdal is naar aanleiding van de motie van de leden Elias/Kuiken (Kamerstukken II, 2012–2013, 33 400 A, nr. 55) € 5 mln. gereserveerd binnen het programma Meer Veilig 3.
-
o) Als maatregel in het kader van de taakstelling op het Infrastructuurfonds is de dekking voor dit project komen te vervallen (zie ook de toelichting onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II).
-
p) Dit betreft diverse mutaties met betrekking tot projecten in voorbereiding, waaronder het vervallen van de dekking voor de projecten A6 Aquaduct Scharstenrijn, A67 Leenderheide – Geldrop (fase 2), A67 no-regret pakket in het kader van de taakstelling op het Infrastructuurfonds (zie ook de toelichting onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II).
-
q) Voor een toelichting op deze mutatie wordt verwezen naar het gestelde onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II.
12.04 GIV/PPS
Geintegreerde contractvormen (12.04) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | ||||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | ||||
Uitgaven | 421 | 0 | – 83 | 338 | – 14 | – 27 | 149 | 7 |
|
| |
Projecten Noordwest-Nederland | |||||||||||
Aflossing tunnels | 52 | 1 | 53 | 16 | |||||||
A10 Tweede Coentunnel | 238 | – 52 | 186 | 39 | 39 | ||||||
Projecten Utrecht | |||||||||||
A12 Lunetten-Veenendaal | 63 | – 12 | 51 | 12 | |||||||
Projecten Brabant | |||||||||||
A59 Rosmalen-Geffen, PPS | 8 | – 6 | 2 | 1 | 9 | a) | |||||
Projecten Noord-Nederland | |||||||||||
N31 Leeuwarden-Drachten | 6 | 6 | 1 | ||||||||
Projecten Zuidvleugel | |||||||||||
A15 Maasvlakte-Vaanplein | 54 | – 14 | 40 | – 53 | – 28 | 149 | 6 | 16 | |||
Afrondingsverschillen | 0 | 1 |
-
a) Door de uitvoering van dit project is schade ontstaan bij een bedrijf vanwege inkomstenderving. De mutatie in 2013 betreft de doorwerking van de in 2012 betaalde schadebetaling. Verder is prijsbijstelling van in totaal bijna € 2,5 mln. aan dit project toegevoegd.
Artikel 12 Hoofdwegennet | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 12.01 Verkeersmgmt. |
|
| 22.072 | 18.733 | 20.539 | 20.412 | 19.700 | 19.700 | 19.701 | 19.700 | 19.701 | 19.701 | 19.701 | 22.290 | 22.290 | 22.290 | 22.290 | 22.290 | |
Index 2012 | Intens./extens. | 8.332 | 1.351 | 442 | 441 | 441 | 440 | 440 | 441 | 440 | 487 | 487 | 487 | 487 | 487 | 487 | 487 | 487 | 1 |
Omzetting inhuur naar ambtelijk personeel | Intens./extens. | – 45.600 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | – 2.850 | 17 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 23.854 | 2.095 | 1.751 | 1.878 | 2.590 | 2.590 | 2.590 | 2.590 | 2.590 | 2.590 | 2.590 | 25 | ||||||
Mutaties voorjaarsnota 2013 |
|
| – 1.499 | – 313 | – 658 | – 531 | 180 | 180 | 181 | 180 | 227 | 227 | 227 | – 2.363 | – 2.363 | – 2.363 | – 2.363 | – 2.363 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.01 Verkeersmgmt. |
|
| 20.573 | 18.420 | 19.881 | 19.881 | 19.880 | 19.880 | 19.882 | 19.880 | 19.928 | 19.928 | 19.928 | 19.927 | 19.927 | 19.927 | 19.927 | 19.927 | |
Ontwerpbegroting 2013 artikelonderdeel 12.02 Beheer, onderh & verv. |
|
| 413.384 | 494.537 | 350.416 | 361.701 | 475.925 | 472.235 | 468.503 | 471.333 | 438.022 | 523.691 | 523.692 | 522.636 | 522.638 | 522.636 | 522.636 | 534.812 | |
Index 2012 | Intens./extens. | 135.141 | 15.686 | 8.883 | 5.881 | 7.628 | 9.814 | 9.748 | 9.685 | 9.739 | 7.362 | 7.360 | 7.360 | 7.199 | 7.199 | 7.199 | 7.199 | 7.199 | 1 |
Voordelig saldo 2012 | Intertemporeel | – 217.826 | – 217.826 | 2 | |||||||||||||||
Interne verschuivingen binnen Hoofdwegennet | Neutraal | 45.767 | 4.133 | – 25.283 | 33.626 | 7.008 | 9.033 | 5.750 | 5.750 | 5.750 | 5 | ||||||||
BenO/Vervanging | Intertemporeel | 0 | 341.898 | 147.833 | 172.921 | 85.814 | – 750 | – 11.830 | 507 | – 2.534 | – 41.061 | – 126.830 | – 126.830 | – 111.300 | – 80.000 | – 80.000 | – 80.000 | – 87.838 | 15 |
Omzetting inhuur naar ambtelijk personeel | Intens./extens. | 47.470 | – 3.400 | – 3.171 | – 161 | 2.019 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 4.349 | 17 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 85.811 | 7.962 | 6.679 | 7.362 | 8.639 | 8.844 | 9.225 | 9.275 | 9.275 | 9.275 | 9.275 | 24 | ||||||
Mutaties voorjaarsnota 2013 |
| 140.491 | 136.224 | 218.946 | 109.831 | 31.085 | 16.861 | 29.516 | 26.579 | – 20.075 | – 105.846 | – 105.846 | – 99.752 | – 68.452 | – 68.452 | – 68.452 | – 76.290 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.02 Beheer, onderh & verv. |
|
| 553.875 | 630.761 | 569.362 | 471.532 | 507.010 | 489.096 | 498.018 | 497.912 | 417.946 | 417.844 | 417.845 | 422.884 | 454.186 | 454.184 | 454.184 | 458.522 | |
Ontwerpbegroting 2013 artikelonderdeel 12.03 Aanleg |
|
| 1.451.135 | 1.595.469 | 895.245 | 1.858.548 | 1.405.260 | 1.223.702 | 1.861.594 | 2.239.198 | 1.193.710 | 1.239.224 | 822.631 | 675.887 | 205.970 | 148.541 | 146.211 | 123.543 | |
Index 2012 | Intens./extens. | 210.277 | – 45.282 | 35.904 | 30.244 | 30.562 | 28.556 | 28.906 | 28.524 | 23.004 | 20.913 | 14.714 | 9.046 | 2.758 | 607 | 607 | 607 | 607 | 1 |
Voordelig saldo 2012 | Intertemporeel | 250.749 | 250.749 | 2 | |||||||||||||||
Overboeking naar BDU | Intens./extens. | – 129.879 | – 129.879 | 3 | |||||||||||||||
Overboekingen tussen IF en HXII en andere ministeries | Intens./extens. | – 4.406 | – 4.406 | 4 | |||||||||||||||
Interne verschuivingen binnen Hoofdwegennet | Neutraal | – 121.951 | 45.287 | 46.234 | – 9.468 | – 137.845 | 4.771 | – 5.759 | – 4.619 | 1.312 | 6.788 | 10.153 | 63.321 | – 28.623 | 40.975 | 40.975 | – 167.700 | – 27.753 | 5 |
Ontvangstenverschuivingen Hoofdwegennet | Intertemporeel | 0 | – 257.911 | – 21.129 | 27.584 | – 350.682 | 29.386 | 89.868 | – 1.692 | 484.576 | 6 | ||||||||
Desaldering Hoofdwegennet | Desaldering | – 135.545 | 17.277 | 2.228 | 8.450 | – 198.500 | 35.000 | 8 | |||||||||||
Beter Benutten | Intens./extens. | – 300.000 | – 50.000 | – 125.000 | – 125.000 | 14 | |||||||||||||
BenO/Vervanging | Intertemporeel | 0 | – 341.898 | – 147.833 | – 172.921 | – 85.814 | 750 | 11.830 | – 507 | 2.534 | 41.061 | 126.830 | 126.830 | 111.300 | 80.000 | 80.000 | 80.000 | 87.838 | 15 |
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | 242.560 | – 22.453 | – 14.000 | – 174.009 | – 29.000 | – 1.000 | – 1.000 | – 898 | – 150 | – 25 | – 25 | 16 | |||||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 1.615.426 | – 138.613 | – 88.409 | – 89.219 | – 85.195 | – 126.974 | – 81.812 | – 72.876 | – 69.608 | 168.553 | 309.101 | 451.658 | 724.285 | 716.932 | 98.119 | – 100.515 | 24 | |
Mutaties voorjaarsnota 2013 |
|
| – 223.503 | – 245.662 | – 268.520 | – 932.007 | – 175.732 | – 3.129 | – 61.106 | 239.152 | – 996 | 355.225 | 508.273 | 537.093 | 845.867 | 838.514 | 11.026 | – 39.823 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.03 Aanleg |
|
| 1.227.632 | 1.349.807 | 626.725 | 926.541 | 1.229.528 | 1.220.573 | 1.800.488 | 2.478.350 | 1.192.714 | 1.594.449 | 1.330.904 | 1.212.980 | 1.051.837 | 987.055 | 157.237 | 83.720 | |
Ontwerpbegroting 2013 artikelonderdeel 12.04 GIV/PPS |
|
| 420.256 | 566.737 | 508.980 | 251.390 | 188.606 | 176.441 | 177.205 | 178.213 | 174.459 | 150.938 | 208.977 | 172.637 | 172.231 | 169.899 | 111.513 | 111.513 | |
Index 2012 | Intens./extens. | 50.700 | 13.988 | 3.259 | 2.762 | 2.790 | 2.800 | 2.816 | 2.812 | 2.269 | 2.427 | 2.427 | 2.427 | 2.427 | 2.427 | 2.427 | 1.321 | 1.321 | 1 |
Voordelig saldo 2012 | Intertemporeel | – 29.265 | – 29.265 | 2 | |||||||||||||||
Interne verschuivingen binnen Hoofdwegennet | Neutraal | 22.949 | – 67.375 | – 16.930 | – 30.144 | 146.610 | – 7.821 | 5.874 | 5.865 | 6.369 | 4.522 | 7.599 | – 39.901 | 58.492 | – 8.955 | – 8.955 | – 8.955 | – 23.346 | 5 |
Mutaties voorjaarsnota 2013 |
|
| – 82.652 | – 13.671 | – 27.382 | 149.400 | – 5.021 | 8.690 | 8.677 | 8.638 | 6.949 | 10.026 | – 37.474 | 60.919 | – 6.528 | – 6.528 | – 7.634 | – 22.025 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.04 GIV/PPS |
|
| 337.604 | 553.066 | 481.598 | 400.790 | 183.585 | 185.131 | 185.882 | 186.851 | 181.408 | 160.964 | 171.503 | 233.556 | 165.703 | 163.371 | 103.879 | 89.488 | |
Ontwerpbegroting 2013 artikelonderdeel 12.05 Verk.& Planuitw. voor tracebesl. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.05 Verk.& Planuitw. voor tracebesl. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 12.06 Netwerk HWN |
|
| 422.016 | 396.659 | 382.425 | 379.372 | 376.644 | 374.218 | 373.970 | 373.898 | 374.570 | 374.570 | 374.570 | 375.204 | 375.204 | 375.204 | 375.204 | 375.204 | |
Index 2012 | Intens./extens. | 53.585 | 6.965 | 3.178 | 3.089 | 3.066 | 3.048 | 3.033 | 3.031 | 3.031 | 3.143 | 3.143 | 3.143 | 3.143 | 3.143 | 3.143 | 3.143 | 3.143 | 1 |
Overboekingen tussen IF en HXII en andere ministeries | Intens./extens. | – 1.360 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | – 85 | 4 |
Omzetting inhuur naar ambtelijk personeel | Intens./extens. | – 1.870 | 6.250 | 6.021 | 3.011 | 831 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | – 1.499 | 17 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 6.347 | 85 | 493 | 718 | 926 | 1.361 | 1.350 | 1.389 | 25 | 24 | ||||||||
Mutaties voorjaarsnota 2013 |
|
| 13.130 | 9.114 | 6.015 | 3.812 | 1.464 | 1.449 | 1.447 | 1.447 | 1.644 | 2.052 | 2.277 | 2.485 | 2.920 | 2.909 | 2.948 | 1.584 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.06 Netwerk HWN |
|
| 435.146 | 405.773 | 388.440 | 383.184 | 378.108 | 375.667 | 375.417 | 375.345 | 376.214 | 376.622 | 376.847 | 377.689 | 378.124 | 378.113 | 378.152 | 376.788 | |
Ontwerpbegroting 2013 artikelonderdeel 12.07 Investeringsruimte |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 242.907 | – 15.819 | 4.021 | – 5.986 | 15.773 | 5.983 | 5.865 | 6.996 | 13.431 | 11.310 | 17.752 | 23.420 | 29.869 | 32.020 | 32.020 | 33.126 | 33.126 | 1 |
Interne verschuivingen binnen Hoofdwegennet | Neutraal | 51.099 | 15.819 | – 4.021 | 5.986 | – 15.773 | – 5.983 | – 5.865 | – 6.996 | – 13.431 | – 11.310 | – 17.752 | – 23.420 | – 29.869 | – 32.020 | – 32.020 | 176.655 | 51.099 | 5 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 1.589.583 | 636.427 | 953.156 | 24 | ||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 846.208 | 1.037.381 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.07 Investeringsruimte |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 846.208 | 1.037.381 | |
Totaal uitgaven stand eerste suppletoire wet 2013 HWN |
|
| 2.574.830 | 2.957.827 | 2.086.006 | 2.201.928 | 2.318.111 | 2.290.347 | 2.879.688 | 3.558.338 | 2.188.211 | 2.569.808 | 2.317.028 | 2.267.036 | 2.069.777 | 2.002.650 | 1.959.587 | 2.065.826 | |
Ontwerpbegroting 2013 artikelonderdeel 12.09 Ontvangsten HWN |
|
| 262.105 | 182.021 | 57.577 | 490.329 | 112.698 | 33.050 | 33.050 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 108.116 | 108.116 | 2 | |||||||||||||||
Interne verschuivingen binnen Hoofdwegennet | Neutraal | – 2.136 | – 2.136 | 5 | |||||||||||||||
Ontvangstenverschuivingen Hoofdwegennet | Intertemporeel | 0 | – 257.911 | – 21.129 | 27.584 | – 350.682 | 29.386 | 89.868 | – 1.692 | 484.576 | 6 | ||||||||
Desaldering Hoofdwegennet | Desaldering | – 135.545 | 17.277 | 2.228 | 8.450 | – 198.500 | 35.000 | 8 | |||||||||||
Mutaties voorjaarsnota 2013 |
|
| – 134.654 | – 18.901 | 36.034 | – 350.682 | 29.386 | 89.868 | – 1.692 | 286.076 | 0 | 35.000 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 12.09 Ontvangsten HWN |
|
| 127.451 | 163.120 | 93.611 | 139.647 | 142.084 | 122.918 | 31.358 | 286.076 | 0 | 35.000 | 0 | 0 | 0 | 0 | 0 | 0 |
13 Spoorwegen | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Verplichtingen | 1.562.567 | 0 | 1.917.308 | 3.479.875 | – 789.728 | – 439.616 | – 191.190 | 171.736 |
Uitgaven | 2.197.753 | 0 | 169.952 | 2.367.705 | 15.864 | – 23.867 | – 19.180 | – 17.477 |
Waarvan juridisch verplicht | 95% |
|
| 100% |
|
|
|
|
13.02 Beheer, onderhoud en vervanging | 1.324.516 | 0 | – 4.611 | 1.319.905 | 13.850 | – 11.348 | 24.486 | 20.717 |
13.02.01 Beheer, onderhoud en vervanging | 1.324.516 | 0 | – 4.611 | 1.319.905 | 13.850 | – 11.348 | 24.486 | 20.717 |
13.03 Aanleg | 706.311 | 0 | 152.876 | 859.187 | – 3.981 | – 46.463 | – 82.113 | – 116.641 |
13.03.01 Real.progr.personenvervoer | 595.685 | 0 | 101.243 | 696.928 | 677 | – 7.583 | 15.223 | 48.614 |
13.03.02 Real.progr.goederenvervoer | 51.061 | 0 | 13.931 | 64.992 | – 31.354 | – 7.617 | – 1.734 | 10.116 |
13.03.04 Verk. en planuitw.personenvervoer | 56.931 | 0 | 39.033 | 95.964 | 28.018 | – 25.651 | – 89.048 | – 164.386 |
13.03.05 Verk. en planuitw.goederenvervoer | 2.634 | 0 | – 1.331 | 1.303 | – 1.322 | – 5.612 | – 6.554 | – 10.985 |
13.04 Geintegreerde contractvormen/PPS | 148.776 | 0 | – 8.583 | 140.193 | – 2.452 | 15.497 | ||
13.07 Rente en aflossing | 18.150 | 0 | 30.247 | 48.397 | – 1.553 | – 1.553 | – 1.553 | – 1.553 |
13.08 Investeringsruimte | 0 | 0 | 23 | 23 | 10.000 | 20.000 | 40.000 | 80.000 |
13.09 Ontvangsten | 60.000 | 0 | 112.581 | 172.581 | 10.000 |
Verplichtingen
In 2013 is voor een groot aantal projecten de subsidiebeschikking verstrekt terwijl de verwachting was dat ze in 2012 tot een subsidiebeschikking zouden leiden. Het gaat voornamelijk om de projecten PHS (DSSU), projecten in het kader van punctualiteits- en capaciteitsknelpunten, aanvulling Rijswijk – Schiedam, de tweede tranche voor het programma ontsnippering en het uitvoeringsprogramma geluid emplacementen. De subsidieaanvragen zijn pas in december 2012/januari 2013 bij IenM ingediend waardoor de uiteindelijke subsidieverlening is verschoven naar begin 2013.
Daarnaast was het voor de programma’s Fietsparkeren en Toegankelijkheid de verwachting dat nog in 2012 een langjarige subsidiebeschikking zou worden verstrekt. Gelet op de toentertijd lopende taakstellings- en heroverwegingsdiscussie naar aanleiding van het Lenteakkoord, is voor beide projecten pas begin 2013 een 2-jarige subsidiebeschikking verleend.
Voor het programma Kleine functiewijzigingen geldt dat de besluitvorming langer heeft geduurd dan vooraf aangenomen doordat enerzijds de consultatie van de vervoerders nog niet had plaatsgevonden (een eis voor het afgeven van de subsidiebeschikking) en anderzijds de besluitvorming over de exacte inhoud van het goed te keuren programma langer duurde dan eerder aangenomen waardoor de verplichting is doorgeschoven naar 2013. Voor OV SAAL cluster A heeft de afstemming over tijd, scope en geld langer geduurd dan vooraf ingeschat waardoor de subsidiebeschikking niet meer in 2012 is verstrekt en is doorgeschoven naar 2013.
Verder bleek het niet nodig de geprognosticeerde ruimte voor Risico’s Spoorprogramma in 2012 aan te spreken. De reservering is doorgeschoven naar 2013.
Voor beheer, onderhoud en vervanging is de verplichtingenruimte 2013 verhoogd ten opzichte van de stand Miljoenennota 2013. Dit houdt verband met het corrigeren van de afboeking van de verplichtingenruimte naar aanleiding van de overheveling van de zogenoemde geoormerkte programma’s naar aanleg. Bij deze overheveling was voor het volledige kasbedrag 2013–2028 het verplichtingenbedrag in het jaar 2013 verlaagd.
13.03 Aanleg
Realisatieprogramma Personenvervoer (13.03.01) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | ||||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | ||||
Uitgaven | 595 | 0 | 101 | 696 | 1 | – 8 | 16 | 49 |
|
| |
Projecten nationaal | |||||||||||
Benutten | |||||||||||
ERTMS-pilot Asterdamdam-Utrecht en ERMTS exp.centr. en ERTMS expertisecentrum 1) | 19 | 19 | – 5 | a) | |||||||
Geluidsanering Spoorwegen | 1 | 2 | 3 | – 12 | – 37 | – 11 | 11 | ||||
UPGE | 4 | 4 | |||||||||
Programma Hoogfrequent Spoorvervoer | |||||||||||
PHS | 7 | 7 | – 1 | ||||||||
Vervanging Dieze brug Den Bosch | 1 | 1 | |||||||||
Stations en stationsaanpassingen | |||||||||||
Kleine stations | 7 | – 2 | 5 | – 2 | – 3 | – 3 | – 3 | 2 | |||
Overige projecten/programma's /lijndelen etc. | |||||||||||
AKI-plan en veiligheidsknelpunten | 15 | 4 | 19 | 2 | 4 | 2 | 9 | b) | |||
Fietsparkeren bij stations | 13 | – 4 | 9 | 4 | |||||||
Nazorg gereedgekomen lijnen/halten | 5 | 5 | |||||||||
Ontsnippering | 8 | 8 | – 4 | – 7 | 12 | 15 | 2 | ||||
Programma Kleine Functiewijzigingen | 37 | 5 | 42 | 33 | – 36 | – 17 | 52 | 11 | |||
Punctualiteits-/capaciteitsknelpunten | 47 | 30 | 77 | – 6 | – 6 | 12 | 6 | 60 | c) | ||
Reistijdverbetering | 4 | – 3 | 1 | 3 | |||||||
Toegankelijkheid stations | 34 | 10 | 44 | – 10 | – 8 | – 14 | – 3 | 9 | |||
Projecten Noordwest Nederland | |||||||||||
Amsterdam-Almere-Lelystad | |||||||||||
OV SAAL korte termijn | 50 | 10 | 60 | 35 | 69 | 54 | – 12 | 23 | |||
Stations en stationsaanpassingen | |||||||||||
Amsterdam CS, Cuypershal | 4 | 2 | 6 | – 1 | – 2 | 1 | 2 | 1 | |||
Amsterdam CS, Fietsenstalling | 4 | 4 | 1 | ||||||||
Overige projecten/lijndelen etc. | |||||||||||
Regionet (inclusief verkeersmaatregelen Schiphol) | 23 | – 3 | 20 | 8 | – 5 | 4 | d) | ||||
Projecten Utrecht | |||||||||||
Vleuten – Geldermalsen 4/6 sporen (incl. RSS) | 30 | 20 | 50 | – 1 | – 13 | – 9 | – 2 | 0 | e) | ||
Stations en stationsaanpassingen | |||||||||||
OV-terminal stationsgebied Utrecht (VINEX/NSP) | 55 | 6 | 61 | – 10 | 1 | 9 | 8 | ||||
Overige projecten/lijndelen etc. | |||||||||||
Spoorwegovergang Soestdijkseweg te Bilthoven | 2 | 3 | 5 | 1 | |||||||
Projecten Zuidvleugel | |||||||||||
Den Haag CS (t.b.v. NSP) | 28 | – 5 | 23 | – 2 | 2 | ||||||
Rotterdam Centraal (t.b.v. NSP) | 32 | 1 | 33 | 9 | 10 | f) | |||||
Den Haag CS perronsporen 11 en 12 | 1 | 1 | – 5 | – 4 | 7 | 1 | |||||
Overige projecten/lijndelen etc. | |||||||||||
Rijswijk – Schiedam incl. spoorcorridor Delft | 54 | 2 | 56 | 1 | 1 | 3 | – 13 | 8 | |||
Projecten Brabant | |||||||||||
Stations en stationsaanpassingen | |||||||||||
Breda Centraal (t.b.v. NSP) | 13 | – 3 | 10 | 2 | 2 | 4 | 1 | ||||
Projecten Oost Nederland | |||||||||||
Utrecht-Arnhem-Zevenaar | |||||||||||
Arnhem Centraal (t.b.v. NSP) | 11 | 6 | 17 | – 2 | 1 | 2 | 1 | ||||
Sporen in Arnhem | 2 | 15 | 17 | 17 | g) | ||||||
Traject Oost uitv. convenant DMB | 15 | – 5 | 10 | – 13 | 6 | 6 | h) | ||||
Overige projecten/lijndelen etc. | |||||||||||
Hanzelijn | 42 | 12 | 54 | 3 | – 8 | – 5 | – 16 | – 19 | i) | ||
Regionale lijnen Gelderland | 1 | 1 | 1 | 1 | 5 | 2 | 8 | j) | |||
Projecten Noord Nederland | |||||||||||
Partiële spooruitbreiding Groningen-Leeuwarden | 1 | 1 | |||||||||
Sporendriehoek Noord-Nederland | 14 | – 5 | 9 | – 26 | – 2 | 9 | |||||
Totaal ProRail projecten | |||||||||||
Overige (niet ProRail) projecten | |||||||||||
Afdekking risico's spoorprogramma's | 15 | – 5 | 10 | 10 | |||||||
Intensivering Spoor in steden (I) | 9 | 9 | 1 | 1 | |||||||
Spoorzone Ede | 0 | 1 | 1 | ||||||||
Afrondingsverschillen | 0 | – 3 | – 3 | 2 | 5 |
-
a) Voor de pilot ERTMS is in september 2012 een meerjarige verplichting aangegaan met een omvang van circa € 30 mln. De Tweede Kamer is geïnformeerd over dit project en de kosten daarvan (zie o.a. Kamerstukken II, 2011–2012, 32 707, nr. 16 d.d. 8 juni 2012, Kamerstukken II, 2012–2013, 33 400 A, nr. 8 en 9 d.d. 31 oktober 2012 en Kamerstukken II, 2012–2013, 32 707, nr. 27 d.d. 23 november 2012). Dit project wordt echter verantwoord op de begroting van HXII. In 2012 is door de NS € 5,7 mln. uitgegeven voor voorbereiding van inbouw van ERTMS in 10 sprinters, dit bedrag is binnen HXII gefinancierd. Hierdoor kan het beschikbare bedrag voor dat project op het fonds met € 5,7 mln. verlaagd worden. Daarnaast is een bedrag van € 0,4 mln. toegevoegd in verband met de prijsbijstelling 2012.
-
b) Op grond van toezeggingen aan de Kamer wordt de overwegproblematiek rond de vervanging van de gelijkvloerse spoorwegovergang Kerkwijkweg op de lijn Zevenaar – Winterswijk nabij Didam aangepakt (Kamerstukken II, 2010–2011, 29 894, nr. 235 en het MIRT overleg van 6 december 2010, Kamerstukken II, 2010–2011, 32 500 A, nr. 631). De totale realisatiekosten van een gelijkvloerse overweg bedragen € 17,4 mln. De provincie Gelderland, de Stadsregio Arnhem Nijmegen, de gemeente Montferland en IenM dragen bij in deze kosten. De toegezegde bijdrage van IenM ad € 6,2 mln. is toegevoegd aan het projectbudget Akiplan en veiligheidsknelpunten. Daarnaast is een bedrag van € 2,5 mln. toegevoegd in verband met de prijsbijstelling 2012 en BTW compensatie van 19% naar 21%.
-
c) In het Infrafonds 2013 is het voormalige, binnen het programma beheer, onderhoud en vervanging (BOV) geoormerkte programma punctualiteits- en capaciteitsknelpunten ondergebracht bij het aanlegprogramma personenvervoer. Binnen het BOV-programma was € 80,2 mln. gereserveerd voor capaciteitsuitbreiding op de Flevolijn in Almere. Een deel van deze middelen (€ 26,6 mln.) is daartoe inmiddels ook ingezet. De nog resterende middelen ad € 53,6 mln. waren nog niet overgeheveld naar het aanlegprogramma en worden nu bij Voorjaarsnota toegevoegd aan de middelen voor het programma punctualiteits- en capaciteitsknelpunten. Deze gelden blijven gereserveerd voor OV SAAL (voor eventuele infrastructurele oplossingen waarbij sprake is van (partiële) viersporigheid). Daarnaast is een bedrag van € 6 mln. toegevoegd in verband met de prijsbijstelling 2012.
-
d) Er is een bedrag van € 4 mln. toegevoegd in verband met de prijsbijstelling 2012 en BTW compensatie van 19% naar 21%.
-
e) Het projectbudget Vleuten – Geldermalsen bestaat uit meerdere deelprojecten. Met betrekking tot het deelproject Vleuten – Amsterdam Rijnkanaal bleek het, gelet op de voortgang van het project en de resterende risico’s, verantwoord het projectbudget onvoorzien te verlagen met € 7,3 mln. Op het deelproject Keervoorziening Woerden Molenvliet is een aanbestedingsmeevaller gerealiseerd waardoor het project met € 4,8 mln. verlaagd kon worden. Daarnaast zijn de deelbudgetten opgehoogd met totaal € 7,8 mln. door toevoeging van de prijsbijstelling 2012 en voor totaal € 3,8 mln. door compensatie van de BTW stijging van 19% naar 21%.
-
f) De toegevoegde indexering aan projectbudgetten op basis van IBOI kan afwijken van de werkelijk gehanteerde indexeringssystematiek in de aannemingscontracten. Hierdoor ontstane indexeringsverschillen worden in eerste instantie gedekt uit het projectbudget. Het resterende projectbudget van het onderhavig project is echter onvoldoende om deze verschillen te kunnen oplossen en is om die reden opgehoogd met € 7,3 mln. Daarnaast is een bedrag van € 2,6 mln. toegevoegd in verband met de prijsbijstelling 2012 en BTW compensatie van 19% naar 21%.
-
g) Dit project is, naast hogere uitgaven voor beveiliging, kabels en leidingen, aanvullende maatregelen tegen laag frequent geluid, ook geconfronteerd met het feit dat de toegevoegde indexering afwijkt van de werkelijk gehanteerde indexeringssystematiek in de aannemingscontracten. Het resterende projectbudget is onvoldoende om deze hogere uitgaven te kunnen inpassen en is om die reden opgehoogd met € 16,3 mln. (vrijgemaakt uit het saldo van de mee- en tegenvallers op de overige aanlegprojecten). Daarnaast is een bedrag van € 0,6 mln. toegevoegd in verband met de prijsbijstelling 2012.
-
h) Er is een bedrag van € 6 mln. toegevoegd in verband met de prijsbijstelling 2012 en BTW compensatie van 19% naar 21%.
-
i) Het project kende tijdens de uitvoering relatief weinig verstoringen en tegenvallers. Op basis van een inschatting van de resterende risico’s bleek het verantwoord het onvoorzien binnen het projectbudget te verlagen met € 24,2 mln. Daarnaast is een bedrag van € 5,2 mln. toegevoegd in verband met de prijsbijstelling 2012.
-
j) In verband met het afgeven van de realisatiebeschikking Wehl dubbelspoor is € 7,4 mln. overgeboekt van het planstudieprogramma naar het realisatieprogramma. Daarnaast is een bedrag van € 0,6 mln. toegevoegd in verband met de prijsbijstelling 2012 en BTW compensatie van 19% naar 21%.
Realisatieprogramma Goederenvervoer (13.03.02) | Standn ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | ||||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | ||||
Uitgaven | 51 | 0 | 14 | 65 | – 31 | – 8 | – 2 | 10 |
|
| |
Uitgaven mbt planuitwerking op IF 13.03.05 | – 3 | – 3 | |||||||||
Projecten nationaal | |||||||||||
PAGE risico reductie | 1 | 1 | – 2 | – 2 | 2 | ||||||
Optimalisering Goederencorridor Rotterdam-Genua | 15 | 9 | 24 | – 6 | – 14 | 14 | 4 | a) | |||
Projecten Oost Nederland | |||||||||||
Uitv.progr Goederenroute Elst-Deventer-Twente (NaNov) | 6 | – 1 | 5 | – 2 | – 5 | – 5 | – 6 | 1 | |||
Projecten Zuidwestelijke delta | |||||||||||
Geluidmaatregelen Zeeuwselijn | 1 | 1 | – 1 | 4 | 3 | 2 | 8 | b) | |||
Spooraansluiting 2e Maasvlakte achterlandverbinding | 30 | 6 | 36 | – 20 | 7 | – 2 | 4 | ||||
Overige projecten | |||||||||||
Nazorg gereedgekomen projecten | 1 | 1 | 1 | ||||||||
Afrondingsverschillen | 0 | 1 |
-
a) Het projectbudget is opgehoogd met € 4,1 mln. naar aanleiding van de prijsbijstelling 2012 en compensatie van de BTW stijging van 19% naar 21%.
-
b) Naar aanleiding van de uitspraak van de Raad van State in mei 2008 met betrekking tot de door ProRail gehanteerde rekenmethode is het maatregelenbesluit uit 2006 vernietigd en is een nieuw maatregelenpakket berekend. Uit het nieuwe saneringsprogramma blijkt dat er nog een aanzienlijk aantal extra schermen nodig is en dient een aantal woningen opnieuw op gevelisolatiemaatregelen onderzocht te worden. De extra kosten bedragen € 7,7 mln.
Projectenoverzicht behorende bij 13.03.04 Planuitwerkingsprogr. Personenvervoer Projectomschrijving | Stand projectbudget MIRT 2013 | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | ||
---|---|---|---|---|---|
Kasmutatie | Budgetwijziging | ||||
Verplicht | |||||
Planuitwerkingskosten op realisatieprogramma IF 13.03.01 | 2 | 2 | |||
Projecten Nationaal | |||||
Kleine projecten Personenvervoer | 5 | 1 | 5 | ||
Reservering opbouw compensatie NS | 144 | 144 | |||
Projecten Noordwest-Nederland | |||||
Amsterdam Zuidas station (NSP) | 231 | – 2 | 4 | 235 | |
Amsterdam Zuidas WTC/4-sporen | 119 | – 7 | 2 | 121 | |
Projecten Oost-Nederland | |||||
Quick scan decentraal spoor Gelderland | 27 | – 1 | 1 | 28 | |
Traject Oost (convenant DMB) | 8 | 8 | |||
Lenteakkoordimpuls voor 4 spoorlijnen in Oost Nederland | 25 | 25 | 25 | a) | |
Gebonden | |||||
Projecten Nationaal | |||||
Programma overwegen | 0 | 200 | 200 | e) | |
Grensoverschrijdend Spoorvervoer | 37 | 1 | 38 | ||
Quick scan decentraal spoor, fase 2 (NMCA) | 91 | 1 | 92 | ||
Grensoverschrijdend Spoorvervoer, fase 2 | 51 | – 8 | 43 | b) | |
Programma Hoogfrequent Spoor (PHS) | 1.866 | – 274 | – 271 | 1.595 | c) |
Reservering Business case NSP | 12 | 12 | |||
Projecten Noordwest-Nederland | |||||
OV Schiphol-Amsterdam-Almere-Lelystad | 771 | 3 | – 186 | 585 | d) |
Bestemd | 1.066 | 1.108 | 2.174 | e) | |
Projecten in voorbereding: | |||||
Projecten Nationaal | |||||
– Roadmap ERTMS | |||||
– Winterhard spoor | |||||
– Overige projecten in voorbereiding | |||||
Gesignaleerde risico's | |||||
Totaal planuitwerkingsprogramma | 4.430 | 5.307 | |||
Nog niet met maatregelen belegde Taakstelling Aanleg uhv BA | – 601 | 601 | 0 | e) | |
Begroting (IF 13.03.04) | 3.829 | 5.307 |
-
a) Naar aanleiding van de gemaakte afspraken in het Lenteakkoord is voor aanpassingen op de lijnen Valleilijn, (Amersfoort-Ede/Wageningen), Arnhem – Doetinchem, Zwolle – Wierden en Arnhem – Elst – Tiel € 25 mln. gereserveerd.
-
b) De post «Grensoverschrijdend Spoorvervoer fase 2» is met € 9 mln. verlaagd ten behoeve van reistijdverbetering op de verbinding Roosendaal – Antwerpen. Wanneer NMBS en NS een reistijd op deze verbinding realiseren die korter is dan 39 minuten, wordt een bedrag van € 0,75 mln. uitgekeerd per jaar over een periode van 12 jaar, zoals gemeld in de brief aan de Kamer van 3 december 2012 (Kamerstukken II, 2012–2013, 220 26, nr. 371). Dit bedrag wordt echter alleen uitgekeerd zodra en zolang de vervoerders een HSL-treindienst Breda – Antwerpen verzorgen. Daarnaast is een bedrag van € 1 mln. toegevoegd in verband met de prijsbijstelling 2012.
-
c) Om invulling te geven aan de prioriteiten genoemd in het Regeerakkoord en de bezuinigingen is het taakstellend budget voor PHS verlaagd met € 300 mln. als gevolg van de keuze om uit te gaan van extra 1 goederenpad in Oost Nederland in plaats van 2 extra goederenpaden, hetgeen mogelijk is gezien de lagere vervoerprognoses. Daarnaast is het planstudiebudget verlaagd met € 7,2 mln. in verband met een aanvullende realisatiebeschikking DSSU voor het opstellen van een uitvoeringsontwerp met als doel de risico’s voor de daadwerkelijke realisatie te reduceren. Naast deze mutaties is het projectbudget opgehoogd met € 33,8 mln. door toevoeging van de prijsbijstelling 2012.
-
d) Om invulling te geven aan de prioriteiten genoemd in het Regeerakkoord en de bezuinigingen is het taakstellend budget van het project OV SAAL MLT neerwaarts bijgesteld met € 200 mln. doordat is gekozen voor de uitvoering van een kosteneffectievere variant. Daarnaast is het projectbudget opgehoogd met € 13,6 mln. in verband met de toevoeging van de prijsbijstelling 2012.
-
e) In het Infrastructuurfonds 2013 was onder «Bestemd» € 1 066 mln. beschikbaar voor projecten in voorbereiding en moest nog € 601 mln. Taakstelling Regeerakkoord worden toebedeeld naar concrete projecten. Na verwerking van het Lenteakkoord, de verlenging van het MIRT naar 2028, het inpassen van de € 601 mln. en de effecten van de heroverweging is een ruimte beschikbaar van € 2,2 mlrd. voor projecten in voorbereiding. Deze ruimte is gereserveerd voor ERTMS, reservering rente en aflossing PHS, reservering akkoord treinverbinding Nederland -België en een reservering voor garantstellingen.
Projectenoverzicht behorende bij 13.03.05 Planuitwerkingsprogr. Goederenvervoer Projectomschrijving | Stand projectbudget MIRT 2013 | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | ||
---|---|---|---|---|---|
Kasmutatie | Budgetwijziging | ||||
Verplicht | |||||
Planuitwerking op realisatieprogramma IF 13.03.02 | 16 | 16 | |||
Gebonden | |||||
Projecten Nationaal | |||||
Aslastencluster III | 38 | – 26 | 12 | a) | |
Europese ERMTS verbindingen | 6 | – 2 | 6 | ||
Kleine project Goederenvervoer | 5 | 1 | 5 | ||
Bestemd | 232 | 232 | |||
Projecten in voorbereding: | |||||
– Overige projecten in voorbereiding | |||||
Gesignaleerde Risico's: |
-
a) Voor het Aslastenprogramma was tot aan de bezuinigingen € 38 mln. beschikbaar. Een deel van deze middelen is gereserveerd voor maatregelen ten behoeve van het aanpakken van de zogenaamde D4/V100 knelpunten voor het goederenvervoer in en rondom Assen. Voor de overige middelen waren geen maatregelen gepland en zijn deze middelen ingezet ten behoeve van de invulling van de bezuiniging.
Artikel 13 Spoorwegen | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 13.02 Beheer, onderh.& verv. | 1.324.516 | 1.236.385 | 1.236.800 | 1.111.748 | 1.210.582 | 1.221.869 | 1.130.098 | 1.284.238 | 1.167.164 | 1.166.485 | 1.166.549 | 1.185.095 | 1.120.779 | 1.175.779 | 1.175.779 | 1.175.779 | |||
Index 2012 | Intens./extens. | 341.539 | 45.349 | 17.297 | 17.099 | 14.758 | 17.814 | 21.039 | 22.533 | 21.514 | 20.517 | 20.517 | 20.517 | 20.517 | 20.517 | 20.517 | 20.517 | 20.517 | 1 |
Voordelig saldo 2012 | Intertemporeel | 16.726 | 16.726 | 2 | |||||||||||||||
Overboeking naar BDU | Intens./extens. | – 10.547 | – 10.547 | 3 | |||||||||||||||
Desaldering Spoorwegen | Desaldering | 102.815 | 92.815 | 10.000 | 9 | ||||||||||||||
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | – 30.000 | 15.000 | 15.000 | 16 | |||||||||||||
Interne verschuivingen binnen artikel 13 Spoorwegen | Neutraal | – 60.502 | – 118.954 | – 13.447 | – 28.447 | 1.553 | 1.553 | 83.553 | 1.553 | – 8.290 | 6.553 | – 9.447 | – 28.447 | 1.553 | 45.553 | 1.553 | 1.553 | 1.553 | 18 |
Apparaattaakstelling Rutte II | Neutraal | – 245.700 | – 6.825 | – 13.650 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | – 20.475 | 21 | |||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 189.531 | 2.530 | 14.727 | 21.427 | 27.656 | 40.651 | 40.301 | 41.490 | 749 | 24 | ||||||||
Mutaties voorjaarsnota 2013 | – 4.611 | 13.850 | – 11.348 | 24.486 | 20.717 | 84.117 | 3.611 | – 7.251 | 9.125 | 5.322 | – 6.978 | 29.251 | 86.246 | 41.896 | 43.085 | 2.344 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.02 Beheer, onderh.& verv. | 1.319.905 | 1.250.235 | 1.225.452 | 1.136.234 | 1.231.299 | 1.305.986 | 1.133.709 | 1.276.987 | 1.176.289 | 1.171.807 | 1.159.571 | 1.214.346 | 1.207.025 | 1.217.675 | 1.218.864 | 1.178.123 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.03 Aanleg | 706.311 | 986.382 | 1.181.055 | 1.172.551 | 1.181.262 | 1.103.173 | 820.467 | 566.848 | 417.524 | 172.254 | 277.088 | 283.293 | 138.877 | 116.739 | 114.339 | 127.934 | |||
Index 2012 | Intens./extens. | 169.791 | 1.999 | 5.000 | 2.672 | 2.923 | 18.747 | 12.902 | 36.781 | 37.207 | 8.973 | 15.552 | 12.809 | 2.981 | 1.819 | 9.426 | 1 | ||
Voordelig saldo 2012 | Intertemporeel | – 13.516 | – 13.516 | 2 | |||||||||||||||
Overboeking naar BDU | Intens./extens. | – 558 | – 302 | – 256 | 3 | ||||||||||||||
Desaldering Spoorwegen | Desaldering | 1.009 | 1.009 | 9 | |||||||||||||||
Aanvullende post Regionaal Spoor | Intens./extens. | 25.000 | 25.000 | 13 | |||||||||||||||
Interne verschuivingen binnen artikel 13 Spoorwegen | Neutraal | 915.627 | 138.709 | 33.978 | 36.649 | 20.748 | 6.528 | – 72.388 | – 13.815 | – 2.115 | 13.017 | 22.472 | 44.215 | 24.043 | – 18.795 | 27.024 | 27.024 | 628.333 | 18 |
Aanvullende post OV en Spoor | Intens./extens. | 750.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 23 | |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | – 209.906 | – 23 | – 92.703 | – 135.784 | – 155.784 | – 191.916 | – 136.330 | – 70.031 | – 64.491 | – 94.604 | 37.614 | 113.817 | 111.518 | 290.264 | 315.692 | 271.298 | – 408.441 | 24 |
Mutaties voorjaarsnota 2013 | 152.876 | – 3.981 | – 46.463 | – 82.113 | – 116.641 | – 145.816 | 2.935 | 20.601 | – 22.614 | 125.638 | 220.841 | 188.542 | 323.288 | 392.716 | 348.322 | 279.318 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.03 Aanleg | 859.187 | 982.401 | 1.134.592 | 1.090.438 | 1.064.621 | 957.357 | 823.402 | 587.449 | 394.910 | 297.892 | 497.929 | 471.835 | 462.165 | 509.455 | 462.661 | 407.252 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.04 GIV/PPS | 148.776 | 148.040 | 148.099 | 148.580 | 148.790 | 149.422 | 152.578 | 161.354 | 162.228 | 163.666 | 164.985 | 166.604 | 167.547 | 168.015 | 166.165 | 150.047 | |||
Voordelig saldo 2012 | Intertemporeel | 6.911 | 6.911 | 2 | |||||||||||||||
Interne verschuivingen binnen artikel 13 Spoorwegen | Neutraal | 0 | – 15.494 | – 2.452 | 15.497 | 2.449 | 18 | ||||||||||||
Mutaties voorjaarsnota 2013 | – 8.583 | – 2.452 | 15.497 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.449 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.04 GIV/PPS | 140.193 | 145.588 | 163.596 | 148.580 | 148.790 | 149.422 | 152.578 | 161.354 | 162.228 | 163.666 | 164.985 | 166.604 | 167.547 | 168.015 | 166.165 | 152.496 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.05 Verk.& Planuitw. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.05 Verk.& Planuitw. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.07 Rente & afl. | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | |||
Interne verschuivingen binnen artikel 13 Spoorwegen | Neutraal | 6.952 | 30.247 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | 18 |
Mutaties voorjaarsnota 2013 |
|
| 30.247 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 13.07 Rente & afl. |
|
| 48.397 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | |
Ontwerpbegroting 2013 artikelonderdeel 13.08 Investeringsruimte |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 248.893 | 34.508 | 16.526 | 22.146 | 20.748 | 6.528 | 9.612 | – 13.815 | – 11.958 | 18.017 | 11.472 | 14.215 | 24.043 | 25.205 | 27.024 | 27.024 | 17.598 | 1 |
Interne verschuivingen binnen artikel 13 Spoorwegen | Neutraal | – 862.077 | – 34.508 | – 16.526 | – 22.146 | – 20.748 | – 6.528 | – 9.612 | 13.815 | 11.958 | – 18.017 | – 11.472 | – 14.215 | – 24.043 | – 25.205 | – 27.024 | – 27.024 | – 630.782 | 18 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 1.789.360 | 23 | 10.000 | 20.000 | 40.000 | 80.000 | 62.000 | 25.000 | 25.241 | 52.655 | 50.500 | 52.000 | 126.552 | 98.528 | 69.035 | 141.127 | 936.699 | 24 |
Mutaties voorjaarsnota 2013 |
|
| 23 | 10.000 | 20.000 | 40.000 | 80.000 | 62.000 | 25.000 | 25.241 | 52.655 | 50.500 | 52.000 | 126.552 | 98.528 | 69.035 | 141.127 | 323.515 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 13.08 Investeringsruimte |
|
| 23 | 10.000 | 20.000 | 40.000 | 80.000 | 62.000 | 25.000 | 25.241 | 52.655 | 50.500 | 52.000 | 126.552 | 98.528 | 69.035 | 141.127 | 323.515 | |
Totaal uitgaven stand eerste suppletoire wet 2013 Spoorwegen |
|
| 2.367.705 | 2.404.821 | 2.560.237 | 2.431.849 | 2.541.307 | 2.491.362 | 2.151.286 | 2.067.628 | 1.802.679 | 1.700.462 | 1.891.082 | 1.995.934 | 1.951.862 | 1.980.777 | 2.005.414 | 2.077.982 | |
Ontwerpbegroting 2013 artikelonderdeel 13.09 Ontvangsten spoorw. |
|
| 60.000 | 59.999 | 237.999 | 181.999 | 194.208 | 195.315 | 199.492 | 203.541 | 207.468 | 209.601 | 211.665 | 211.988 | 175.300 | 175.300 | 175.300 | 175.300 | |
Voordelig saldo 2012 | Intertemporeel | 18.757 | 18.757 | 2 | |||||||||||||||
Desaldering Spoorwegen | Desaldering | 103.824 | 93.824 | 10.000 | 9 | ||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 112.581 | 10.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 13.09 Ontvangsten spoorw. |
|
| 172.581 | 69.999 | 237.999 | 181.999 | 194.208 | 195.315 | 199.492 | 203.541 | 207.468 | 209.601 | 211.665 | 211.988 | 175.300 | 175.300 | 175.300 | 175.300 |
14 Regionaal/lokale infra. | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Verplichtingen | 231.724 | 0 | 103.092 | 334.816 | 16.808 | 4.757 | – 4.980 | – 6.691 |
Uitgaven | 135.983 | 0 | – 4.485 | 131.498 | – 14.821 | – 25.032 | 106.526 | – 21.336 |
Waarvan juridisch verplicht | 94% | 96% | ||||||
14.01 Grote regionaal/lokale projecten | 60.771 | 0 | 539 | 61.310 | – 17.794 | – 26.055 | 102.501 | – 24.429 |
14.01.02 Planuitw.progr.reg./lok | 8.135 | 0 | 5.254 | 13.389 | – 1.538 | – 37.390 | 56.677 | – 74.031 |
14.01.03 Real.progr.reg./lok. | 52.636 | 0 | – 4.715 | 47.921 | – 16.256 | 11.335 | 45.824 | 49.602 |
14.02 Regionale Mob. Fondsen | 30.257 | 0 | – 3.654 | 26.603 | 242 | |||
14.03 RSP – ZZL: Pakket Bereikbaarheid | 44.955 | 0 | – 1.370 | 43.585 | 2.731 | 1.023 | 4.025 | 3.093 |
14.03.01 RSP – ZZL: RB projecten | 29.049 | 0 | – 2.395 | 26.654 | 2.430 | 722 | 2.606 | 1.807 |
14.03.02 RSP – ZZL: RB mob.fondsen | 0 | 0 | 253 | 253 | 1.118 | 985 | ||
14.03.03 RSP – ZZL: REP | 15.906 | 0 | 772 | 16.678 | 301 | 301 | 301 | 301 |
14.09 Ontvangsten | 0 | 0 | 600 | 600 |
Verplichtingen
De bijstelling van het verplichtingenbudget wordt veroorzaakt doordat de betalingsverplichtingen voor het project de Parallelstructuur A12 Gouwe knoop niet in 2012 zijn vastgelegd, omdat de provincie in dat jaar geen volledige aanvraag heeft ingediend. Het verplichtingenbudget wordt daardoor doorgeschoven naar 2013.
Hetzelfde geldt voor (een deel van) de verplichtingenbudgetten in 2012 ten behoeve van de rijksbijdrage aan de regionale mobiliteitsfondsen en de Regiospecifiek Pakket Zuiderzeelijn (Regionale Bereikbaarheidsprojecten) alsmede de RijnGouwelijn-oost. De laatst genoemde is door de nieuwe plannen van de provincie Zuid-Holland samen met de RijnGouwelijn-west onderdeel geworden van het Hoogwaardig Openbaar Vervoer Zuid-Holland noord. Voor dat totale netwerk is in 2012 geen aanvraag ingediend.
Projectenoverzicht behorende bij 14.01.02 Planuitwerkingsprogr. Reg./lokale infrastructuur Projectomschrijving | Stand projectbudget MIRT 2013 | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | ||
---|---|---|---|---|---|
Kasmutatie | Budgetwijziging | ||||
Verplicht | |||||
Projecten Zuidvleugel | |||||
Haaglanden/Den Haag, Rotterdamsebaan | 228 | 228 | |||
Parallelstructuur A12/A20, Gouweknoop | 109 | – 2 | 2 | 111 | |
Rijn-Gouwelijn West (onderdeel van HOV netwerk Zuid-Holland Noord) | 46 | 46 | |||
Projecten Brabant | |||||
Eindhoven Helmond, voltooiing verkeersruit (T-structuur) | 259 | 5 | 264 | ||
Projecten Utrecht | |||||
Utrecht, tram naar De Uithof | 110 | 110 | |||
Gebonden | |||||
Projecten Noordwest-Nederland | |||||
Ombouw Amstelveenlijn (reservering) | 75 | 75 | |||
Bestemd | 390 | – 352 | 38 | a) | |
Projecten in voorbereiding | 7 | ||||
Projecten Noordwest-Nederland | |||||
– HOV Amstelveen | |||||
– Overige projecten in voorbereiding | |||||
Gesignaleerde risico's: | |||||
Totaal programma planuitwerking en verkenning | 1.217 | – 2 | – 345 | 872 | |
Nog niet met maatregelen belegde Taakstelling Aanleg uhv BA | – 157 | 157 | 0 | a) | |
Begroting IF 14.01.02 | 1.060 | – 2 | – 188 | 872 |
-
a) Voor een toelichting op deze mutatie wordt verwezen naar het gestelde onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II.
Realisatieprogramma | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | |
---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | |||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |||
Uitgaven | 53 | 0 | – 5 | 48 | – 16 | 11 | 46 | 50 | ||
Projecten Noordwest-Nederland | ||||||||||
N201 | 10 | 10 | 10 | |||||||
Noord/Zuidlijn Noord-WTC | 29 | – 6 | 23 | – 43 | – 21 | 10 | 23 | 5 | ||
Projecten Zuidvleugel | ||||||||||
Startstation Erasmuslijn | 2 | 2 | ||||||||
Beneluxmetro (excl. Bodemsanering) | 0 | |||||||||
HOV netwerk Zuid-Holland Noord (voorheen | ||||||||||
Rijn-Gouwelijn Oost) | 10 | 10 | 10 | 20 | 20 | 27 | 3 | |||
Randstadrail (incl. voorbereidingskosten | ||||||||||
en aanlanding RR op Den Haag HSE | 0 | 6 | 12 | 16 | ||||||
Projecten Oost-Nederland | ||||||||||
Nijmegen 2e stadsbrug | 24 | – 20 | 4 | |||||||
Afrondingsverschillen | – 1 | – 1 | 1 |
Projectoverzicht Regiospecifiek Pakket Zuiderzeelijn (14.03) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | ||||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | ||||
Uitgaven | 45 | 0 | – 1 | 44 | 3 | 1 | 4 | 3 | |||
Projecten Noord-Nederland | |||||||||||
14.03.01 Concrete bereikbaarheidsprojecten | 29 | – 2 | 27 | 2 | 1 | 3 | 2 | – 32 | a) | ||
14.03.02 Regionaal Mobiliteitsfonds | 0 | 1 | 1 | 6 | |||||||
14.03.03 Ruimtelijk economisch programma | 16 | 1 | 17 | – 12 | b) | ||||||
Afrondingsverschillen | 0 | 1 |
|
-
a) Dit betreft het saldo van de indexatie 2012 en de budgetoverheveling naar het Gemeente- en Provinciefonds (incl. deel storting naar BTW-compensatiefonds) voor die concrete projecten waar de regio de opdrachtgever voor is.
-
b) Dit betreft een budgetoverheveling naar het Provinciefonds.
Artikel 14 Regionaal/lokale infra. | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 14.01 Grote reg./lok.proj. |
|
| 60.771 | 104.830 | 99.343 | 44.156 | 235.601 | 218.604 | 116.825 | 39.129 | 143.539 | 143.500 | 143.506 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 16.040 | 4.396 | 2.359 | 2.159 | 715 | 2.842 | 2.728 | 512 | 284 | 45 | 1 | |||||||
Voordelig saldo 2012 | Intertemporeel | 135.265 | 135.265 | 2 | |||||||||||||||
Overboeking naar BDU | Intens./extens. | – 9.722 | – 9.722 | 3 | |||||||||||||||
Desaldering Regionaal, lokale infrastructuur | Desaldering | 600 | 600 | 10 | |||||||||||||||
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | – 130.000 | 130.000 | 16 | ||||||||||||||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 395.810 | – 20.153 | – 28.214 | – 28.214 | – 27.271 | – 18.113 | – 10.973 | – 9.564 | – 10.080 | 22.299 | 41.611 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | 24 | |
Mutaties voorjaarsnota 2013 |
| 539 | – 17.794 | – 26.055 | 102.501 | – 24.429 | – 15.385 | – 10.461 | – 9.280 | – 10.035 | 22.299 | 41.611 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.01 Grote reg./lok.proj. |
|
| 61.310 | 87.036 | 73.288 | 146.657 | 211.172 | 203.219 | 106.364 | 29.849 | 133.504 | 165.799 | 185.117 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | |
Ontwerpbegroting 2013 artikelonderdeel 14.02 Reg.Mob.fonds. |
|
| 30.257 | 12.750 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 1.510 | 1.268 | 242 | 1 | ||||||||||||||
Voordelig saldo 2012 | Intertemporeel | – 4.922 | – 4.922 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
| – 3.654 | 242 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.02 Reg.Mob.fonds. |
|
| 26.603 | 12.992 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 14.03 RSP/ZZL |
|
| 44.955 | 144.149 | 54.009 | 212.450 | 163.286 | 136.631 | 116.631 | 39.693 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 19.334 | 2.912 | 2.731 | 1.023 | 4.025 | 3.093 | 2.588 | 2.210 | 752 | 1 | ||||||||
Voordelig saldo 2012 | Intertemporeel | – 4.282 | – 4.282 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
| – 1.370 | 2.731 | 1.023 | 4.025 | 3.093 | 2.588 | 2.210 | 752 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.03 RSP/ZZL |
|
| 43.585 | 146.880 | 55.032 | 216.475 | 166.379 | 139.219 | 118.841 | 40.445 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Totaal uitgaven stand eerste suppletoire wet 2013 Reg./Lok.infra. |
|
| 131.498 | 246.908 | 128.320 | 363.132 | 377.551 | 342.438 | 225.205 | 70.294 | 133.504 | 165.799 | 185.117 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | |
Ontwerpbegroting 2013 artikelonderdeel 14.09 Ontvangsten |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Desaldering Regionaal, lokale infrastructuur | Desaldering | 600 | 600 | 10 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
| 600 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.09 Ontvangsten Reg./lok.infra |
|
| 600 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
15 Hoofdvaarwegennet | Stand ontwerpbegroting | Mutaties via NvW en samendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Verplichtingen | 893.076 | 0 | 221.342 | 1.114.418 | – 47.744 | – 84.665 | – 38.644 | – 21.360 |
Uitgaven | 844.120 | 0 | 55.152 | 899.272 | 21.367 | – 9.950 | 8.581 | – 272 |
Waarvan juridisch verplicht | 98% | 100% | ||||||
15.01 Verkeersmanagement | 12.770 | 0 | 728 | 13.498 | 257 | 260 | 256 | 257 |
15.01.01 Basispakket verkeersmanagement | 12.770 | 0 | 728 | 13.498 | 257 | 260 | 256 | 257 |
15.02 Beheer, onderhoud en vervanging | 298.884 | 0 | 4.028 | 302.912 | 72.772 | 108.264 | 42.457 | 63.207 |
15.02.01 Beheer en onderhoud | 180.453 | 0 | – 22.482 | 157.971 | 29.942 | 61.531 | 110.809 | 31.002 |
15.02.02 Servicepakket B&O hoofdvaarwegen | 0 | 0 | 0 | 0 | ||||
15.02.04 Vervanging | 118.431 | 0 | 26.510 | 144.941 | 42.830 | 46.733 | – 68.352 | 32.205 |
15.03 Aanleg | 284.743 | 0 | 46.467 | 331.210 | – 53.656 | – 120.411 | – 36.055 | – 65.648 |
15.03.01 Realisatie | 267.323 | 0 | 51.716 | 319.039 | 6.423 | – 10.157 | 29.684 | – 5.488 |
15.03.02 Verkenningen en planuitwerkingen | 17.420 | 0 | – 5.249 | 12.171 | – 60.079 | – 110.254 | – 65.739 | – 60.160 |
15.05 Verk. en planuitw. voor tracébesluit | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
15.05.01 Verkenningen | 0 | 0 | 0 | 0 | ||||
15.05.02 Planuitw.programma voor tracébesluit | 0 | 0 | 0 | 0 | ||||
15.06 Netwerkgebonden kosten HVWN | 247.723 | 0 | 3.929 | 251.652 | 1.994 | 1.937 | 1.923 | 1.912 |
15.06.01 Apparaatskosten RWS | 235.672 | 0 | 3.087 | 238.759 | 1.393 | 1.337 | 1.323 | 1.312 |
15.06.02 Overige netwerkgebonden kosten | 12.051 | 0 | 842 | 12.893 | 601 | 600 | 600 | 600 |
15.07 Investeringsruimte | 0 | 0 | 0 | 0 | ||||
15.09 Ontvangsten | 30.036 | 0 | 9.174 | 39.210 | 9.958 | 2.232 | 7.530 | 14.510 |
Verplichtingen
De mutatie betreft onder andere de doorwerking van de saldi 2012 naar 2013 van de projecten Maasroute, onderdeel verruiming Julianakanaal in verband met de keuze van marktbenadering, de GVO-impuls Groot Onderhoud Damwanden Amsterdam-Rijnkanaal omdat de contractvoorbereiding meer tijd vergt alsmede de Zuid – Willemsvaart (gedeelte Maas – Veghel).
15.03 Aanleg
Realisatieprogramma Hoofdvaarwegen (15.03.01) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2016 | Gevolgen MIRT | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | ||||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | ||||
Uitgaven | 267 | 0 | 52 | 319 | 6 | – 10 | 30 | – 5 |
|
| |
Projecten Nationaal | |||||||||||
Dynamisch verkeersmanagement | 31 | 10 | 41 | – 5 | 4 | 1 | |||||
Quick Wins Binnenhavens | 10 | 4 | 14 | 3 | 4 | ||||||
Beter Benutten | 2 | 2 | 7 | 2 | 11 | a) | |||||
Projecten Noordwest-Nederland | |||||||||||
Amsterdam – Rijnkanaal, verwijderen keersluis Zeeburg | 4 | 1 | 5 | ||||||||
De Zaan (Wilhelminasluis) | 0 | ||||||||||
Verbeteren vaargeul IJsselmeer Amsterdam-Lemmer | 1 | – 1 | 0 | – 1 | b) | ||||||
Walradar Noordzeekanaal | 3 | 2 | 5 | 1 | |||||||
Projecten Utrecht | |||||||||||
Lekkanaal, verbreding kanaalzijde en uitbreiding ligplaatsen | 0 | – 2 | 3 | ||||||||
Projecten Zuidvleugel | |||||||||||
Verbreding Maasgeul | 0 | ||||||||||
Projecten Brabant | |||||||||||
Wilhelminakanaal Tilburg | 15 | – 8 | 7 | – 12 | – 4 | 9 | 16 | 1 | |||
Zuid-Willemsvaart; Maas-Veghel | 95 | 34 | 129 | 33 | – 5 | 6 | – 24 | 26 | |||
Zuid-Willemsvaart; renovatie middendeel klasse II | 0 | ||||||||||
Zuid-Willemsvaart; vervanging sluizen 4, 5 en 6 | 0 | – 16 | – 16 | c) | |||||||
Projecten Limburg | |||||||||||
Bouw 4e sluiskolk Ternaaien | 0 | ||||||||||
Maasroute, modernisering fase 2 | 70 | 3 | 73 | 1 | 1 | 1 | 1 | 7 | |||
Projecten Oost Nederland | |||||||||||
Vaarweg Meppel-Ramspol (keersluis Zwartsluis) Vaarweg Meppel-Ramspol (keersluis Zwartsluis) | 12 | – 1 | 11 | – 10 | – 8 | 11 | 1 | ||||
Projecten Noord-Nederland | |||||||||||
Vaarweg Lemmer – Delfzijl fase 1; verbetering tot klasse Va | 26 | – 4 | 22 | 10 | – 1 | 2 | |||||
Verruiming vaarweg Eemshaven – Noordzee | 0 | ||||||||||
Overige projecten | |||||||||||
Amendement ligplaatsen | 5 | 5 | |||||||||
Duurzame havens | 1 | 1 | 2 | ||||||||
Kleine projecten | 0 | ||||||||||
Ligplaatsvoorzieningen | 0 | ||||||||||
Walradarsystemen | 1 | 1 | 2 | – 6 | – 1 | – 3 | 3 | – 6 | d) | ||
Realisatieuitgaven op IF 15.03.01 mbt planuitwerkingsprojecten | 2 | 2 | |||||||||
Afronding | – 2 | 1 | – 1 | 3 | 2 |
-
a) Deze mutatie betreft de verwerking van een desaldering als gevolg van een bijdrage van de regio ten behoeve van benuttingsmaatregelen op de Zuid-Willemsvaart vanaf Veghel doorlopende naar het Wilhelminakanaal tot de aansluiting met het Beatrixkanaal bij Eindhoven
-
b) Dit project is afgerond en het nog resterende budget valt vrij.
-
c) Het project is in 2010 opgeleverd. Er rest nog een zeer geringe uitgave in 2013 en het uitgavenbudget in 2014 kan in z’n geheel worden afgeboekt. Omdat de nog open staande regiobijdrage ad € 13,5 mln. op het project komt te vervallen, wordt zowel het ontvangsten- als het uitgavenbudget verminderd (desaldering). Het project krijgt een vervolg in het project Beter Benutten zoals toegelicht onder a). Tevens is sprake van een meevaller van ca. € 2,7mln.
-
d) Enerzijds wordt ca. € 0,4 mln. aan prijsbijstelling aan dit project toegevoegd en anderzijds kan ca. € 6,2 mln. op het budget in mindering worden gebracht. Dit betreft een desaldering en heeft betrekking op de nog te realiseren ontvangst van het Belgische aandeel in de bouw van de Schelderadarketen-Noord. De bouwkosten hiervan zijn aanzienlijk goedkoper geworden omdat deze post op de wal word gebouwd in plaats van op zee.
Projectenoverzicht behorende bij 15.03.02 Verkenningen en planuitwerkingen Projectomschrijving | Stand projectbudget MIRT 2013 | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | ||
---|---|---|---|---|---|
Kasmutatie | Budgetwijziging | ||||
Verplicht | |||||
Realisatieuitgaven op IF 15.03.01 mbt planuitwerkingsprojecten | – 4 | – 2 | – 4 | ||
Projecten Noordwest-Nederland | |||||
Zeetoegang IJmond | 574 | 11 | 585 | ||
Projecten Utrecht | |||||
Lekkanaal/3e kolk Beatrixsluis | 213 | – 2 | 3 | 216 | |
Projecten Zuidwestelijke Delta | |||||
Grote zeesluis in het kanaal Gent-Terneuzen | 168 | 3 | 171 | ||
Max. bijdrage aan Vlaanderen kanaalaanpassingen t.b.v. Zeesluis | 150 | 3 | 153 | ||
Projecten Limburg | |||||
Maasroute, moderinisering fase 2, verbreding Julianakanaal | 31 | 1 | 32 | ||
Projecten Noord-Nederland | |||||
Vaarweg Lemmer-Delfzijl fase 2 | 99 | 3 | 102 | ||
Verdieping vaarweg Harlingen-Kornwerderzand (Boontjes) | 5 | – 1 | 5 | ||
Verruiming vaarweg Eemshaven-Noordzee | 42 | 2 | 42 | ||
Gebonden | |||||
Projecten Noordwest-Nederland | |||||
Capaciteitsuitbreiding ligplaatsen Amsterdam-Lemmer | 6 | 6 | |||
Lichteren buitenhaven IJmuiden | 63 | 2 | 65 | ||
Vaarweg IJsselmeer-Meppel | 35 | 1 | 36 | ||
Projecten Zuidvleugel | |||||
Capaciteitsuitbreiding ligplaatsen Beneden-Lek | 3 | 3 | |||
Capaciteitsuitbreiding overnachtingplaatsen Merwedes | 28 | 1 | 29 | ||
Verkeerssituatie splitsing Hollandsch Diep-Dordtsche Kil | 9 | 1 | 10 | ||
Projecten Oost-Nederland | |||||
Bovenloop IJssel (IJsselkop tot Zutphen) | 36 | 1 | 36 | ||
Capaciteitsuitbreiding ligplaatsen IJssel | 27 | 1 | 1 | 28 | |
Toekomstvisie Waal | 128 | 3 | 131 | ||
Verruiming Twentekanalen fase 2 en cap. uitbreiding sluis Eefde | 95 | – 3 | 2 | 97 | |
Overige projecten | |||||
Bijdrage aan agentschap tbv planuitwerkingen | 65 | 1 | 66 | ||
Bestemd | 596 | 0 | – 120 | 476 | a) |
Projecten in voorbereiding | |||||
Projecten Zuidwestelijke Delta | |||||
– Capaciteitsuitbreiding ligplaatsen Rijn-Scheldeverbinding | |||||
– Capaciteit Volkeraksluizen | |||||
– Kreekraksluizen | |||||
Projecten Oost-Nederland | |||||
– IJssel, fase 2 | |||||
– Gesignaleerde risico's | |||||
Projecten Noord-Nederland | |||||
– Capaciteitsuitbreiding ligplaatsen Lemmer-Delfzijl | |||||
Overige projecten | |||||
– Beheer, Onderhoud en Vervanging nieuwe aanleg (LCC) | |||||
Totaal programma planuitwerking en verkenning | 2.371 | – 4 | – 84 | 2.287 | |
Nog niet met maatregelen belegde Taakstelling aanleg uhv BA | – 112 | 112 | – 0 | a) | |
Begroting 15.03.02 | 2.259 | – 4 | 28 | 2.287 | |
Nog niet met maatregelen belegde Taakstelling BenO uhv BA | – 56 | 56 | 0 | a) |
-
a) Voor een toelichting op deze mutatie wordt verwezen naar het gestelde onder 2.1 Overzicht uitgaven- en ontvangsten mutaties ad 24 Taakstelling Rutte I en II.
Artikel 15 Hoofdvaarwegennet | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 15.01 Verkeersmgmt. |
|
| 12.770 | 13.336 | 11.803 | 12.652 | 12.651 | 12.651 | 12.651 | 12.651 | 12.651 | 12.651 | 12.651 | 12.672 | 12.672 | 12.672 | 12.672 | 12.672 | |
Index 2012 | Intens./extens. | 4.358 | 728 | 237 | 237 | 236 | 236 | 236 | 236 | 236 | 247 | 247 | 247 | 247 | 247 | 247 | 247 | 247 | 1 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 210 | 20 | 23 | 20 | 21 | 21 | 21 | 21 | 21 | 21 | 21 | 24 | ||||||
Mutaties voorjaarsnota 2013 |
|
| 728 | 257 | 260 | 256 | 257 | 257 | 257 | 257 | 268 | 268 | 268 | 247 | 247 | 247 | 247 | 247 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 15.01 Verkeersmgmt. |
|
| 13.498 | 13.593 | 12.063 | 12.908 | 12.908 | 12.908 | 12.908 | 12.908 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | |
Ontwerpbegroting 2013 artikelonderdeel 15.02 Beheer, onderh.& verv. |
|
| 298.884 | 284.762 | 260.627 | 275.898 | 190.100 | 217.125 | 173.580 | 215.854 | 218.056 | 253.356 | 277.795 | 271.826 | 271.826 | 274.326 | 277.011 | 266.085 | |
Index 2012 | Intens./extens. | 56.029 | 8.866 | 4.959 | 4.787 | 6.531 | 4.372 | 5.075 | 4.118 | 5.257 | 1.508 | 1.508 | 1.508 | 1.508 | 1.508 | 1.508 | 1.508 | 1.508 | 1 |
Voordelig saldo 2012 | Intertemporeel | 30.696 | 30.696 | 2 | |||||||||||||||
BenO/Vervanging | Intertemporeel | 0 | – 4.489 | 46.240 | 91.172 | 113.798 | 17.599 | – 16.764 | 27.503 | – 9.246 | 9.608 | – 25.692 | – 50.131 | – 39.192 | – 39.192 | – 41.692 | – 44.377 | – 35.146 | 15 |
Interne verschuivingen binnen artikel 15 Hoofdvaarwegennet | Neutraal | – 126 | – 31.045 | 16.270 | 6.457 | – 48.982 | 1.448 | 4.438 | 3.156 | 4.183 | 4.528 | 9.243 | 9.000 | 29.000 | – 1.905 | – 5.917 | 19 | ||
Interne verschuivingen binnen artikel 15 Hoofdvaarwegennet | Neutraal | 0 | – 35.000 | 35.000 | 20 | ||||||||||||||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 51.641 | 5.303 | 5.848 | 6.110 | 4.788 | 5.217 | 4.495 | 4.970 | 4.970 | 4.970 | 4.970 | 24 | ||||||
Mutaties voorjaarsnota 2013 |
|
| 4.028 | 72.772 | 108.264 | 42.457 | 63.207 | – 2.034 | 39.272 | 5.164 | 20.614 | – 9.971 | – 34.653 | – 8.684 | – 37.684 | – 40.184 | – 44.774 | – 39.555 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 15.02 Beheer, onderh.& verv. |
|
| 302.912 | 357.534 | 368.891 | 318.355 | 253.307 | 215.091 | 212.852 | 221.018 | 238.670 | 243.385 | 243.142 | 263.142 | 234.142 | 234.142 | 232.237 | 226.530 | |
Ontwerpbegroting 2013 artikelonderdeel 15.03 Aanleg |
|
| 284.743 | 339.668 | 289.951 | 218.654 | 242.753 | 197.684 | 224.570 | 61.754 | 229.774 | 159.343 | 126.548 | 85.074 | 198.074 | 238.074 | 253.568 | 10.142 | |
Index 2012 | Intens./extens. | 55.203 | 13.634 | 6.995 | 6.303 | 3.257 | 3.311 | 2.373 | 2.187 | 680 | 2.326 | 1.088 | 1.198 | 588 | 3.510 | 3.510 | 4.144 | 99 | 1 |
Voordelig saldo 2012 | Intertemporeel | 51.031 | 51.031 | 2 | |||||||||||||||
Ontvangstenverschuivingen Hoofdvaarwegennet | Neutraal | 0 | – 23.437 | 1.337 | 146 | 7.444 | 14.510 | 7 | |||||||||||
Desaldering Hoofdvaarwegennet | Desaldering | 11.636 | 843 | 8.621 | 2.086 | 86 | 11 | ||||||||||||
BenO/Vervanging | Intertemporeel | 0 | 4.489 | – 46.240 | – 91.172 | – 113.798 | – 17.599 | 16.764 | – 27.503 | 9.246 | – 9.608 | 25.692 | 50.131 | 39.192 | 39.192 | 41.692 | 44.377 | 35.146 | 15 |
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | – 31.000 | 16.000 | 15.000 | 16 | |||||||||||||
Interne verschuivingen binnen artikel 15 Hoofdvaarwegennet | Neutraal | – 126.563 | 30.613 | – 16.458 | – 5.880 | 49.109 | – 907 | – 3.649 | – 1.213 | – 1.870 | – 3.333 | – 6.810 | – 6.677 | – 91.906 | – 39.007 | – 18.744 | – 19.800 | 9.969 | 19 |
Interne verschuivingen binnen artikel 15 Hoofdvaarwegennet | Neutraal | 0 | 35.000 | – 35.000 | 20 | ||||||||||||||
Overboeking binnen Infrastructuurfonds (van artikel 18) | Intens./extens. | 294 | 294 | 22 | |||||||||||||||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 115.717 | 0 | – 23.911 | – 31.894 | – 32.153 | – 29.963 | – 21.945 | – 14.637 | – 13.813 | – 14.032 | 17.072 | 35.564 | 57.749 | 93.618 | 92.651 | 10.349 | – 8.938 | 24 |
Afrondingsverschil | Technisch | – 1 | – 1 | ||||||||||||||||
Mutaties voorjaarsnota 2013 |
| 46.467 | – 53.656 | – 120.411 | – 36.055 | – 65.648 | – 6.458 | – 41.166 | – 5.757 | – 24.647 | 37.042 | 80.216 | 5.623 | 97.313 | 119.109 | 39.070 | 36.276 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.03 Aanleg |
|
| 331.210 | 286.012 | 169.540 | 182.599 | 177.105 | 191.226 | 183.404 | 55.997 | 205.127 | 196.385 | 206.764 | 90.697 | 295.387 | 357.183 | 292.638 | 46.418 | |
Ontwerpbegroting 2013 artikelonderdeel 15.05 Verk.& Planuitw. voor tracebesl. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 15.05 Verk.& Planuitw. voor tracebesl. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 15.06 Netwerk HVWN |
|
| 247.723 | 234.036 | 224.847 | 222.822 | 220.998 | 219.440 | 219.284 | 219.240 | 221.402 | 221.402 | 221.402 | 221.777 | 221.777 | 221.777 | 221.777 | 221.777 | |
Index 2012 | Intens./extens. | 28.075 | 3.624 | 1.689 | 1.632 | 1.618 | 1.607 | 1.596 | 1.595 | 1.594 | 1.640 | 1.640 | 1.640 | 1.640 | 1.640 | 1.640 | 1.640 | 1.640 | 1 |
Overboekingen tussen IF en HXII en andere ministeries | Intens./extens. | – 736 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | – 46 | 4 |
Omzetting inhuur naar ambtelijk personeel | Intens./extens. | 5.616 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 351 | 17 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 3.758 | 50 | 292 | 425 | 548 | 806 | 799 | 823 | 15 | 24 | ||||||||
Mutaties voorjaarsnota 2013 |
|
| 3.929 | 1.994 | 1.937 | 1.923 | 1.912 | 1.901 | 1.900 | 1.899 | 1.995 | 2.237 | 2.370 | 2.493 | 2.751 | 2.744 | 2.768 | 1.960 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 15.06 Netwerk HVWN |
|
| 251.652 | 236.030 | 226.784 | 224.745 | 222.910 | 221.341 | 221.184 | 221.139 | 223.397 | 223.639 | 223.772 | 224.270 | 224.528 | 224.521 | 224.545 | 223.737 | |
Ontwerpbegroting 2013 artikelonderdeel 15.07 Investeringsruimte HVWN |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 17.375 | – 432 | – 188 | 577 | 127 | 541 | 789 | 1.943 | 2.313 | 1.195 | 2.433 | 2.323 | 2.933 | 11 | 11 | – 623 | 3.422 | 1 |
Interne verschuivingen binnen artikel 15 Hoofdvaarwegennet | Neutraal | 126.689 | 432 | 188 | – 577 | – 127 | – 541 | – 789 | – 1.943 | – 2.313 | – 1.195 | – 2.433 | – 2.323 | 62.906 | 39.007 | 18.744 | 21.705 | – 4.052 | 19 |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 216.816 | 79.000 | 137.816 | 24 | ||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 65.839 | 39.018 | 18.755 | 100.082 | 137.186 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 15.07 Investeringsruimte HVWN |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 65.839 | 39.018 | 18.755 | 100.082 | 137.186 | |
Totaal uitgaven stand eerste suppletoire wet 2013 HVWN |
|
| 899.272 | 893.169 | 777.278 | 738.607 | 666.230 | 640.566 | 630.348 | 511.062 | 680.113 | 676.328 | 686.597 | 656.867 | 805.994 | 847.520 | 862.421 | 646.790 | |
Ontwerpbegroting 2013 artikelonderdeel 15.09 Ontvangsten HVWN |
|
| 30.036 | 22.155 | 4.444 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 31.768 | 31.768 | 2 | |||||||||||||||
Ontvangstenverschuivingen Hoofdvaarwegennet | Neutraal | 0 | – 23.437 | 1.337 | 146 | 7.444 | 14.510 | 7 | |||||||||||
Desaldering Hoofdvaarwegennet | Desaldering | 11.636 | 843 | 8.621 | 2.086 | 86 | 0 | 11 | |||||||||||
Mutaties voorjaarsnota 2013 |
|
| 9.174 | 9.958 | 2.232 | 7.530 | 14.510 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 15.09 Ontvangsten HVWN |
|
| 39.210 | 32.113 | 6.676 | 7.530 | 14.510 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
17 Megaprojecten Verkeer en Vervoer | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Verplichtingen | 35.060 | 0 | 5.079 | 40.139 | – 2.635 | 27.069 | 14.449 | 13.841 |
Uitgaven | 54.157 | 0 | – 3.722 | 50.435 | 466 | 12.217 | 12.079 | 12.060 |
Waarvan juridisch verplicht | 100% | 100% | ||||||
17.01 Westerscheldetunnel | 0 | 0 | 4.804 | 4.804 | ||||
17.02 Betuweroute | 4.699 | 0 | 4.846 | 9.545 | 114 | 114 | ||
17.03 Hoge snelheidslijn | 0 | 0 | 8.294 | 8.294 | 0 | 0 | 0 | 0 |
17.03.01 Realisatie HSL-zuid | 0 | 0 | 8.294 | 8.294 | ||||
17.04 Anders betalen voor mobiliteit | 0 | 0 | 0 | 0 | ||||
17.06 Project Mainportontwikkeling R'dam | 49.458 | 0 | – 21.666 | 27.792 | 352 | 12.103 | 12.079 | 12.060 |
17.09 Ontvangsten | 3.000 | 0 | – 1.901 | 1.099 |
|
|
|
|
Project Mainportontwikkeling Rotterdam (17.06) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | ||||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | ||||
Uitgaven | 50 | 0 | – 22 | 29 | 0 | 12 | 12 | 12 |
|
| |
Project Mainportontwikkeling Rotterdam | 10 | a) | |||||||||
Uitvoeringsorganisatie | 1 | 1 | 2 | ||||||||
750 ha | |||||||||||
Groene verbinding | |||||||||||
Bestaand Rotterdams Gebied (BRG) | |||||||||||
Landaanwinning | |||||||||||
Voorfinanciering FES monitoringsprogramma | |||||||||||
Voorfinanciering FES natuurcompensatie | 5 | 1 | 6 | ||||||||
Landaanwinning | |||||||||||
BTW Buitencontour | |||||||||||
Onvoorzien | 44 | – 23 | 21 | 12 | 12 | 12 | |||||
Afrondingsverschillen | – 1 |
-
a) Naast een toevoeging van ca. € 11 mln. aan prijsbijstelling wordt een desaldering aangebracht van ca. € 1 mln. (zie ook de toelichting onder het algemeen deel van de memorie van toelichting onder ad 12).
Artikel 17 Megaprojecten Verkeer en Vervoer | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 17.01 W'scheldetunnel |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 4.804 | 4.804 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 4.804 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 17.01 W'scheldetunnel |
|
| 4.804 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 17.02 Betuweroute |
|
| 4.699 | 6.000 | 6.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 576 | 348 | 114 | 114 | 1 | |||||||||||||
Voordelig saldo 2012 | Intertemporeel | 4.498 | 4.498 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 4.846 | 114 | 114 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 17.02 Betuweroute |
|
| 9.545 | 6.114 | 6.114 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 17.03 HSL |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 8.294 | 8.294 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 8.294 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 17.03 HSL |
|
| 8.294 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 17.04 ABvM |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 17.04 ABvM |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 17.06 PMR |
|
| 49.458 | 17.407 | 5.139 | 3.953 | 3.019 | 2.573 | 1.936 | 1.846 | 11.518 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 10.815 | 9.864 | 352 | 103 | 79 | 60 | 51 | 39 | 37 | 230 | 1 | |||||||
Voordelig saldo 2012 | Intertemporeel | 5.863 | 5.863 | 2 | |||||||||||||||
Desaldering Megaprojecten Verkeer en Vervoer | Desaldering | – 1.193 | – 1.193 | 12 | |||||||||||||||
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | – 36.200 | 12.000 | 12.000 | 12.000 | 150 | 25 | 25 | 16 | |||||||||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 466 | 6 | 36 | 53 | 68 | 100 | 99 | 102 | 2 | 24 | ||||||||
Mutaties voorjaarsnota 2013 |
|
| – 21.666 | 352 | 12.103 | 12.079 | 12.060 | 51 | 39 | 37 | 386 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 17.06 PMR |
|
| 27.792 | 17.759 | 17.242 | 16.032 | 15.079 | 2.624 | 1.975 | 1.883 | 11.904 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |
Totaal uitgaven stand eerste suppletoire wet 2013 Mega VenV |
|
| 50.435 | 23.873 | 23.356 | 16.032 | 15.079 | 2.624 | 1.975 | 1.883 | 11.904 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |
Ontwerpbegroting 2013 artikelonderdeel 17.09 Ontvangsten Mega VenV |
|
| 3.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | – 708 | – 708 | 2 | |||||||||||||||
Desaldering Megaprojecten Verkeer en Vervoer | Desaldering | – 1.193 | – 1.193 | 12 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
| – 1.901 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.09 Ontvangsten Mega VenV |
|
| 1.099 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
18 Overige uitgaven en ontvangsten | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Verplichtingen | 270.419 | 0 | – 1.659 | 268.760 | 1.819 | 51.297 | 107.896 | 73.090 |
Uitgaven | 273.614 | 0 | 3.124 | 276.738 | 5.772 | 51.297 | 107.905 | 76.815 |
Waarvan juridisch verplicht | 100% | 100% | ||||||
18.01 Saldo van de afgesloten rekeningen | 0 | 0 | 0 | 0 | ||||
18.02 Beter Benutten | 0 | 0 | 0 | 0 | 50.000 | 125.000 | 125.000 | |
18.03 Intermodaal vervoer | 3.196 | 0 | – 882 | 2.314 | 3.965 | 57 | ||
18.04 Gebiedsgerichte aanpak (UPR) | 0 | 0 | 2.374 | 2.374 | ||||
18.05 Railinfrabeheer | 0 | 0 | 1 | 1 | ||||
18.06 Externe veiligheid | 0 | 0 | 1.013 | 1.013 | 2.526 | 2.000 | 2.009 | 2.000 |
18.07 Mobiliteitsonafhankelijke kennis en expert. | 42 | 0 | 222 | 264 | 0 | 0 | 0 | 0 |
18.07.01 Natl.basisinfo.voorziening en ov.uitgaven | 42 | 0 | 84 | 126 | ||||
18.07.02 Subsidies algemeen | 0 | 0 | 138 | 138 | ||||
18.08 Netwerkoverstijgende kosten | 270.376 | 0 | 396 | 270.772 | – 719 | – 760 | – 19.104 | – 38.492 |
18.08.01 Apparaatskosten RWS | 216.693 | 0 | – 1.473 | 215.220 | – 1.412 | – 1.452 | – 19.794 | – 39.473 |
18.08.02 Overige netwerkoverstijgende kosten | 53.683 | 0 | 1.869 | 55.552 | 693 | 692 | 690 | 981 |
18.11 Investeringsruimte | 0 | 0 | 0 | 0 | 0 | 0 | 0 | – 11.693 |
18.11.01 Programmaruimte | 0 | 0 | 0 | 0 | – 11.693 | |||
18.11.02 Beleidsruimte | 0 | 0 | 0 | 0 | ||||
18.12 Nader toe te wijzen BenO en Vervanging | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
18.12.01 Beheer en onderhoud | 0 | 0 | 0 | 0 | ||||
18.12.02 Vervanging | 0 | 0 | 0 | 0 | ||||
18.13 Tol gefinancierde uitgaven | 0 | 0 | 0 | 0 | ||||
18.09 Ontvangsten | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
18.09.01 Ontvangsten | 0 | 0 | 0 | 0 | ||||
18.09.02 Tolopgave | 0 | 0 | 0 | 0 | ||||
18.10 Saldo van de afgesloten rekeningen | 0 | 0 | 147.317 | 147.317 |
18.02 Beter Benutten
In het nieuwe regeerakkoord is afgesproken dat het programma Beter Benutten wordt voortgezet. In mijn brief aan de Voorzitter van de Tweede Kamer der Staten Generaal van 13 februari 2013 (Kamerstukken II, 2012–2013, 33 400 A, nr. 48) is vermeld dat Bereikbaarheidsknelpunten niet alleen met grootschalige infrastructuurprojecten worden aangepakt maar dat breed en creatief gezocht wordt naar mogelijke oplossingen. Gedacht wordt aan de slimme aanpak gericht op gedragsverandering in het kader van het programma Beter Benutten. In de jaren 2015 tot en met 2017 is hiervoor € 300 mln. beschikbaar.
Projectoverzicht Intermodaal Vervoer (18.03) | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 | Gevolgen MIRT | |
---|---|---|---|---|---|---|---|---|---|---|
Budget | Oplevering | |||||||||
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |||
Uitgaven | 3 | 0 | – 1 | 2 | 4 | 0 | 0 | 0 | ||
Multi- en modaalvervoer | ||||||||||
SOIT | ||||||||||
Container Transferium Alblasserdam | 1 | – 1 | 0 | 4 | ||||||
Ruimte voor planuitwerking | 2 | 2 |
Artikel 18 Overige uitgaven en ontvangsten | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 18.01 Saldo afgesl.rekg. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.01 Saldo afgesl.rekg. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.02 Beter Benutten |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Beter Benutten | Intens./extens. | 50.000 | 125.000 | 125.000 | 14 | ||||||||||||||
Mutaties voorjaarsnota 2013 |
| 300.000 | 0 | 0 | 50.000 | 125.000 | 125.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.02 Beter Benutten |
|
| 0 | 0 | 50.000 | 125.000 | 125.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.03 Intermod.verv. |
|
| 3.196 | 2.000 | 3.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Index 2012 | Intens./extens. | 147 | 52 | 38 | 57 | 1 | |||||||||||||
Voordelig saldo 2012 | Intertemporeel | 3.287 | 3.287 | 2 | |||||||||||||||
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | – 3.927 | 3.927 | 16 | ||||||||||||||
Overboeking binnen Infrastructuurfonds (naar artikel 15) | Intens./extens. | – 294 | – 294 | 22 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| – 882 | 3.965 | 57 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.03 Intermod.verv. |
|
| 2.314 | 5.965 | 3.057 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.04 Geb. aanpak |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 2.374 | 2.374 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 2.374 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.04 Geb. aanpak |
|
| 2.374 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.05 Railinfrabeh. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 1 | 1 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.05 Railinfrabeh. |
|
| 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.06 Ext.veiligheid |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 12.446 | 12.446 | 2 | |||||||||||||||
Verschuiving modaliteiten 2013 | Intertemporeel | 0 | – 11.433 | 2.526 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 16 | ||||||||
Mutaties voorjaarsnota 2013 |
|
| 1.013 | 2.526 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.06 Ext.veiligheid |
|
| 1.013 | 2.526 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.07 Mob.onafh. Kennis/Exp. |
|
| 42 | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 222 | 222 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 222 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.07 Mob.onafh. Kennis/Exp. |
|
| 264 | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.08 Netwerkoverst.kosten |
|
| 270.376 | 252.459 | 244.487 | 237.001 | 238.024 | 237.355 | 232.502 | 232.380 | 232.766 | 232.766 | 232.766 | 233.794 | 233.794 | 233.794 | 233.794 | 233.794 | |
Index 2012 | Intens./extens. | 39.130 | 5.044 | 2.318 | 2.277 | 2.222 | 2.225 | 2.220 | 2.189 | 2.187 | 2.306 | 2.306 | 2.306 | 2.306 | 2.306 | 2.306 | 2.306 | 2.306 | 1 |
Overboekingen tussen IF en HXII en andere ministeries | Intens./extens. | – 41.083 | – 4.297 | – 2.686 | – 2.686 | – 2.686 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | – 2.394 | 4 |
Omzetting inhuur naar ambtelijk personeel | Intens./extens. | – 5.616 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | – 351 | 17 |
Apparaattaakstelling Rutte II | Intens./extens. | – 640.361 | – 18.289 | – 37.972 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | – 53.100 | 21 | |||
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | 10.197 | 136 | 792 | 1.153 | 1.488 | 2.187 | 2.168 | 2.232 | 41 | 24 | ||||||||
Mutaties voorjaarsnota 2013 |
|
| 396 | – 719 | – 760 | – 19.104 | – 38.492 | – 53.625 | – 53.656 | – 53.658 | – 53.403 | – 52.747 | – 52.386 | – 52.051 | – 51.352 | – 51.371 | – 51.307 | – 53.498 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.08 Netwerkoverst.kosten |
|
| 270.772 | 251.740 | 243.727 | 217.897 | 199.532 | 183.730 | 178.846 | 178.722 | 179.363 | 180.019 | 180.380 | 181.743 | 182.442 | 182.423 | 182.487 | 180.296 | |
Ontwerpbegroting 2013 artikelonderdeel 18.11 Investeringsruimte |
|
| 0 | 0 | 0 | 0 | 15.418 | 33.376 | 150.161 | 173.203 | 144.987 | 579.234 | 842.725 | 1.087.730 | 1.598.826 | 1.585.044 | 1.631.799 | 1.893.035 | |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | – 9.634.621 | – 11.693 | – 25.311 | – 113.878 | – 131.353 | – 133.993 | – 579.234 | – 842.725 | – 1.087.730 | – 1.598.826 | – 1.585.044 | – 1.631.799 | – 1.893.035 | 24 | ||||
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | – 11.693 | – 25.311 | – 113.878 | – 131.353 | – 133.993 | – 579.234 | – 842.725 | – 1.087.730 | – 1.598.826 | – 1.585.044 | – 1.631.799 | – 1.893.035 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.11 Investeringruimte |
|
| 0 | 0 | 0 | 0 | 3.725 | 8.065 | 36.283 | 41.850 | 10.994 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Ontwerpbegroting 2013 artikelonderdeel 18.12 Nader toe te wijzen B&O&V |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | |
Index 2012 | Intens./extens. | 74.968 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 1 | ||||||||
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.12 Nader toe te wijzen B&O&V |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | |
Ontwerpbegroting 2013 artikelonderdeel 18.13 Tol gefinanc.uitgaven |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.13 Tol gefinanc.uitgaven |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |
Totaal uitgaven stand eerste suppletoire wet 2013 Overige uitg.en ontv. |
|
| 276.738 | 260.273 | 298.826 | 344.948 | 330.299 | 192.837 | 234.254 | 239.595 | 724.783 | 714.445 | 724.727 | 726.090 | 726.789 | 726.770 | 726.834 | 724.643 | |
Ontwerpbegroting 2013 artikelonderdeel 18.09 Ontvangsten |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |
Mutaties voorjaarsnota 2013 |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.09 Ontvangsten Overige uitg.en ontv. |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |
Ontwerpbegroting 2013 artikelonderdeel 18.10 Voordelig saldo |
|
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Voordelig saldo 2012 | Intertemporeel | 147.317 | 147.317 | 2 | |||||||||||||||
Mutaties voorjaarsnota 2013 |
|
| 147.317 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 18.10 Voordelig saldo |
|
| 147.317 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Totaal ontvangsten stand eerste suppletoire wet 2013 Ontvangsten Overige uitg.en ontv. |
|
| 147.317 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 |
19 Bijdragen andere begrotingen Rijk | Stand ontwerpbegroting | Mutaties via NvW en amendement | Mutaties 1e suppletoire begroting | Stand 1e suppletoire begroting | Mutatie 2014 | Mutatie 2015 | Mutatie 2016 | Mutatie 2017 |
---|---|---|---|---|---|---|---|---|
(1) | (2) | (3) | (4)=(1)t/m(3) | (5) | (6) | (7) | (8) | |
Ontvangsten | 5.879.349 | 0 | – 67.129 | 5.812.220 | – 86.717 | – 105.200 | – 111.858 | – 145.356 |
19.09 Ten laste van begroting IenM | 5.879.349 | 0 | – 67.129 | 5.812.220 | – 86.717 | – 105.200 | – 111.858 | – 145.356 |
Artikel 19 Bijdragen andere begrotingen Rijk | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 19.09 |
|
| 5.879.349 | 6.608.356 | 5.640.937 | 5.877.752 | 6.039.905 | 5.806.026 | 6.037.906 | 6.105.183 | 5.467.346 | 5.715.923 | 5.716.664 | 5.617.274 | 5.599.948 | 5.602.233 | 5.602.201 | 5.596.070 | |
Index 2012 | Intens./extens. | 1.784.725 | 109.049 | 116.356 | 97.617 | 117.499 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 112.017 | 1 |
Voordelig saldo 2012 | Intertemporeel | – 41.894 | – 41.894 | 2 | |||||||||||||||
Overboeking naar BDU | Intens./extens. | – 150.706 | – 150.450 | – 256 | 3 | ||||||||||||||
Overboekingen tussen IF en HXII en andere ministeries | Intens./extens. | – 47.585 | – 8.834 | – 2.817 | – 2.817 | – 2.817 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | – 2.525 | 4 |
Aanvullende post Regionaal Spoor | Intens./extens. | 25.000 | 25.000 | 13 | |||||||||||||||
Apparaattaakstelling Rutte II | Intens./extens. | – 886.061 | – 25.114 | – 51.622 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | – 73.575 | 21 | |||
Aanvullende post OV en Spoor | Intens./extens. | 750.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 50.000 | 23 | |
Taakstelling Rutte I en II (Investeringsbrief) | Neutraal | – 3.750.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | – 250.000 | 24 | |
Mutaties voorjaarsnota 2013 |
|
| – 67.129 | – 86.717 | – 105.200 | – 110.432 | – 142.130 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | |
Stand eerste suppletoire wet 2013 artikelonderdeel 19.09 |
|
| 5.812.220 | 6.521.639 | 5.535.737 | 5.767.320 | 5.897.775 | 5.641.943 | 5.873.823 | 5.941.100 | 5.303.263 | 5.551.840 | 5.552.581 | 5.453.191 | 5.435.865 | 5.438.150 | 5.438.118 | 5.431.987 | |
Totaal ontvangsten stand eerste suppletoire wet 2013 |
|
| 5.812.220 | 6.521.639 | 5.535.737 | 5.767.320 | 5.897.775 | 5.641.943 | 5.873.823 | 5.941.100 | 5.303.263 | 5.551.840 | 5.552.581 | 5.453.191 | 5.435.865 | 5.438.150 | 5.438.118 | 5.431.987 |