Ontwerpbegroting t (1) | Mutaties via NvW, moties, amendementen en ISB (2) | Vastgestelde begroting t (3) = (1) + (2) | Mutaties 1e suppletoire begroting (4) | Stand 1e suppletoire begroting (5) = (3) + (4) | Mutatie 2026 | Mutatie 2027 | Mutatie 2028 | Mutatie 2029 | Mutatie 2030 | ||
---|---|---|---|---|---|---|---|---|---|---|---|
Art. | Verplichtingen | 25.634 | 0 | 25.634 | 1.837 | 27.471 | 1.600 | 400 | 400 | 400 | 23.732 |
Uitgaven | 25.634 | 0 | 25.634 | 1.837 | 27.471 | 1.600 | 400 | 400 | 400 | 23.732 | |
1.0 | Wetgeving en controle Eerste Kamer | 25.634 | 0 | 25.634 | 1.837 | 27.471 | 1.600 | 400 | 400 | 400 | 23.732 |
Institutionele inrichting | 19.828 | 0 | 19.828 | 1.737 | 21.565 | 1.600 | 400 | 400 | 400 | 18.204 | |
Apparaat Eerste Kamer | 19.828 | 0 | 19.828 | 1.737 | 21.565 | 1.600 | 400 | 400 | 400 | 18.204 | |
Personele uitgaven | 5.327 | 0 | 5.327 | 100 | 5.427 | 0 | 0 | 0 | 0 | 5.327 | |
Vergoedingen voorzitter/leden Eerste Kamer | 5.327 | 0 | 5.327 | 100 | 5.427 | 0 | 0 | 0 | 0 | 5.327 | |
Materiële uitgaven | 479 | 0 | 479 | 0 | 479 | 0 | 0 | 0 | 0 | 201 | |
Verenigde vergadering | 479 | 0 | 479 | 0 | 479 | 0 | 0 | 0 | 0 | 201 | |
Ontvangsten | 140 | 0 | 140 | 0 | 140 | 0 | 0 | 0 | 0 | 140 | |
Toelichting
Institutionele inrichting
Apparaat Eerste Kamer
In 2023 is de griffie het project voor een nieuw parlementair systeem gestart. Doel van het project is te komen tot een toekomstbestendig informatiesysteem dat het huidige parlementaire systeem moet vervangen. Het huidige systeem is aan het einde van zijn levensduur. In de jaren 2025 en 2026 is er € 1,6 mln. nodig voor de implementatie van het systeem. Vanaf 2027 is er € 0,4 mln. nodig voor onderhoud en doorontwikkeling.