Artikel 12 Hoofdwegennet
12 Hoofdwegennet | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Verplichtingen | 2.634.014 | 4.292.546 | – 695.422 | – 1.743.488 | – 2.438.910 | 1.853.636 |
Uitgaven | 2.728.863 | 2.574.830 | – 80.568 | – 24.898 | – 105.466 | 2.469.364 |
Waarvan juridisch verplicht | 100% | |||||
12.01 Verkeersmanagement | 22.072 | 20.573 | 1.221 | 0 | 1.221 | 21.794 |
12.01.01 Basispakket verkeersmanagement | 22.072 | 20.573 | 1.221 | 0 | 1.221 | 21.794 |
12.02 Beheer, onderhoud en vervanging | 413.384 | 553.875 | – 9.091 | – 525 | – 9.616 | 544.259 |
12.02.01 Beheer en onderhoud | 339.249 | 463.978 | – 10.066 | 3.000 | – 7.066 | 456.912 |
12.02.02 Servicepakket B&O | 0 | 508 | – 508 | 0 | – 508 | 0 |
12.02.04 Vervanging | 74.135 | 89.389 | 1.483 | – 3.525 | – 2.042 | 87.347 |
12.03 Aanleg | 1.451.135 | 1.227.632 | – 81.678 | – 75.910 | – 157.588 | 1.070.044 |
12.03.01 Realisatie | 1.042.578 | 1.191.811 | – 76.684 | – 54.588 | – 131.272 | 1.060.539 |
12.03.02 Verkenningen en planuitwerkingen | 408.557 | 35.821 | – 4.994 | – 21.322 | – 26.316 | 9.505 |
12.04 GIV/PPS | 420.256 | 337.604 | 45.048 | 13.771 | 58.819 | 396.423 |
12.05 Verkenn.en planuitw.voor tracébesluit | 0 | 0 | 0 | 0 | 0 | 0 |
12.05.01 Verkenningen | 0 | 0 | 0 | 0 | 0 | 0 |
12.05.02 Planuitwerking voor tracébesluit | 0 | 0 | 0 | 0 | 0 | 0 |
12.06 Netwerkgebonden kosten HWN | 422.016 | 435.146 | 1.698 | 0 | 1.698 | 436.844 |
12.06.01 Apparaatskosten RWS | 367.678 | 380.683 | 893 | 0 | 893 | 381.576 |
12.06.02 Overige netwerkgebonden kosten | 54.338 | 54.463 | 805 | 0 | 805 | 55.268 |
12.07 Investeringsruimte | 0 | 0 | – 37.766 | 37.766 | 0 | 0 |
12.09 Ontvangsten | 262.105 | 127.451 | 100 | 45.597 | 45.697 | 173.148 |
Operationele doelstelling 12.02
Tussen de artikelonderdelen 12.03 en 12.02 vindt een overboeking plaats van € 3 mln. voor nalevingskosten SWUNG (Samen Werken in de Uitvoering van Nieuw Geluidbeleid). Deze gelden worden op de laatst genoemde operationele doelstelling verantwoord.
De betaalritmes van het programma Renovatie Stalen Bruggen zijn halverwege de doorlooptijd herijkt, waardoor enkele uitgaven naar voren zijn geschoven. Dit wordt versterkt doordat op de Waalbrug bij Ewijk meer uitgebreide renovatiemaatregelen worden uitgevoerd dan eerder voorzien.
Anderzijds zijn de budgetten in de begroting in lijn gebracht met de actuele planning, waardoor circa € 17,9 mln. via het voordelig saldo kan worden doorgeboekt naar de begroting van 2014. Het betreft hier met name uitgaven voor de Velsertunnel, de VIT (Vervangingsinvestering tunnels) Bestaande Tunnels en onderzoeken.
Operationele doelstelling 12.03
Realisatieprogramma | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
Hoofwegennet (12.03.01) | huidig | vorig | huidig | vorig | huidig | vorig | |
Projecten Nationaal | |||||||
Dynamisch verkeersmanagement | 4 | 10 | 159 | 160 | – | – | 1 |
Kleine projecten / Afronding projecten | 38 | 41 | 157 | 153 | nvt | nvt | |
Programma 130 km | 8 | 34 | 57 | 57 | 2 | ||
Programma aansluitingen | 1 | 4 | 99 | 99 | nvt | nvt | 3 |
Quick Wins Wegen | 1 | 1 | 36 | 36 | – | – | |
ZSM 1+2 (spoedwet wegverbreding) | 98 | 125 | 1.581 | 1.581 | 2016 | 2016 | 4 |
Projecten Noord-Holland, Utrecht en Flevoland | |||||||
A10 Amsterdam praktijkproef FES | 4 | 4 | 48 | 48 | 2015 | 2015 | |
A1/A6/A9 Schiphol-Amsterdam-Almere | 112 | 140 | 2.152 | 2.174 | 2024 | 2024 | 5 |
A9 Badhoevedorp | 13 | 44 | 332 | 336 | 2017 | 2017 | 6 |
A2 Holendrecht – Oudenrijn | 20 | 23 | 1.219 | 1.219 | 2012 | 2012 | 7 |
A28 Utrecht – Amersfoort | 47 | 54 | 224 | 224 | 2013 | 2013 | 8 |
Projecten Zuidvleugel | |||||||
A4 Burgerveen – Leiden | 44 | 23 | 586 | 586 | 2014 | 2014 | 9 |
A4 Delft – Schiedam | 140 | 140 | 661 | 661 | 2015 | 2015 | |
Projecten Zuidwestelijke Delta | |||||||
N57/N59 EuroRAP (verkeersveiligheid) | 0 | 0 | 10 | 10 | |||
N61 Hoek-Schoondijke | 20 | 30 | 118 | 118 | 2014 | 2014 | 10 |
Projecten Brabant | |||||||
A4 Dinteloord – Bergen op Zoom | 61 | 54 | 275 | 275 | 2015 | 2015 | 11 |
N2 Meerenakkerweg (A2 zone) | 2 | 7 | 11 | 11 | 2014 | 2014 | 12 |
Projecten Limburg | |||||||
A2 Maasbracht – Geleen, 1e fase | 3 | 6 | 170 | 170 | 2011/2013 | 2011/2013 | 13 |
A2 Passage Maastricht | 180 | 142 | 675 | 675 | 2016 | 2016 | 14 |
A2/A76 Maatregelenpakket Limburg | 0 | 0 | 110 | 110 | 2010/2015 | 2010/2015 | |
A67 Aanpak toerit Someren | 0 | 0 | 6 | 6 | |||
Projecten Oost-Nederland | |||||||
A50 Ewijk – Valburg | 47 | 29 | 276 | 276 | 2015 | 2015 | 15 |
N35 Combiplan Nijverdal | 52 | 70 | 316 | 307 | 2014 | 2014 | 16 |
Projecten Noord-Nederland | |||||||
N31 Leeuwarden (De Haak) | 72 | 72 | 193 | 193 | 2014 | 2014 | |
N33 Assen – Zuidbroek | 0 | 0 | 0 | 0 | |||
Overige maatregelen | |||||||
Meer kwaliteit leefomgeving | 2 | 2 | 107 | 107 | |||
Meer veilig 2 | 27 | 27 | 27 | 27 | |||
Meer veilig 3 | 40 | 40 | |||||
Verzorgingsplaatsen | 4 | 4 | 25 | 25 | |||
Afrondingen | |||||||
Totaal uitvoeringsprogramma | 1.000 | 1.088 | 9.670 | 9.684 | |||
Realisatieuitgaven op IF 12.03.01 mbt planuitwerking | 61 | 77 | 17 | ||||
Programma Realisatie (IF 12.03.01) | 1.061 | 1.165 | 9.670 | 9.684 | |||
Budget Realisatie (IF 12.03.01) | 1.061 | 1.115 | 9.670 | 9.684 | |||
Overprogrammering (–) | 0 | – 50 |
-
1. Doordat de ontvangsten van de regio (provincie Gelderland) niet meer worden gerealiseerd, wordt een desaldering van € 1,2 mln. met de ontvangsten aangebracht.
Het programma Dynamisch verkeersmanagement bestaat verder uit 22 Maatregelpakketten. Een actualisatie van deze pakketten resulteert in een budgettair overschot in 2013, onder andere door meevallers (deze blijven vooralsnog binnen het programma).
-
2. De neerwaartse bijstelling van het budget betreft het programma AKOE (Aanpak Kritische Ontwerp Elementen). Voor dit project is een aantal deelprojecten «on hold» gezet, aangezien deze mogelijk niet meer noodzakelijk zijn. Daarnaast geldt voor een aantal maatregelen nog een voorbehoud op natuur, lucht en geluid, waardoor een deel van het programma overloopt naar later jaren.
-
3. De voorbereiding voor de uitvoering van het deelproject (A4 Prins Clausplein) is moeizaam verlopen, waardoor RWS in goed onderling overleg met Stadsgewest Haaglanden (SGH) heeft afgesproken de realisatie niet door SGH uit te laten voeren. De risico's om het project te laten realiseren door een derde partij, die geen ervaring heeft met design en construct contracten en systeemgerichte contractbeheersing waren dusdanig groot dat RWS dit risico zelf beter kan beheersen dan SGH. Het gevolg hiervan is vertraging in de voorbereiding.
-
4. In 2013 is minder budget noodzakelijk. Dit komt voornamelijk omdat in 2013 minder risico's zijn opgetreden dan vooraf ingeschat.
-
5. Uit het budget ten behoeve van de uitvoering van dit project wordt circa € 22,1 mln. overgeboekt naar de DBFM operationele doelstelling 12.04 (GIV/PPS).
Daarnaast wordt een kasschuif van bijna € 6 mln. met 2014 aangebracht, zijnde het niet in 2013 benodigde deel onvoorzien budget op het deelproject A10 Oost.
-
6. De aanbesteding van dit project heeft plaatsgevonden, met tot gevolg dat de planning is geactualiseerd. Hierdoor kan via het voordelig saldo ca. € 28,9 mln. aan de begroting voor 2014 worden toegevoegd.
Verder wordt ten behoeve van de aankoop van panden in de gemeente Utrecht € 2,2 mln. naar het project A12/A27 Ring Utrecht overgeboekt.
-
7. Het kasritme is aangepast conform de actuele uitvoeringsplanning van de aannemer. Een bedrag van circa € 3,7 mln. kan daardoor naar 2014 worden doorgeboekt.
-
8. In 2013 was rekening gehouden met meer risico’s dan zich uiteindelijk hebben voorgedaan.
-
9. Als gevolg van een aanpassing conform de actuele uitvoeringsplanning van de aannemer, wordt circa € 21 mln. aan het budget van dit project toegevoegd.
-
10. De opdrachtnemer heeft een achterstand ten opzichte van de planning en er zijn drie tekortkomingen opgelegd. Deze dienen eerst opgelost te worden alvorens tot rechtmatige betaling kan worden overgegaan. Verwacht wordt dat betaling daarvoor pas in 2014 zal kunnen plaats vinden. Het daarmee gemoeide budget ad ca. € 10 mln. wordt daarom via het saldo doorgeboekt naar het budget voor 2014.
-
11. De verwerving van een aantal percelen is vlotter verlopen dan gepland. Hierdoor kunnen werkzaamheden die in 2014 gepland stonden al in 2013 starten. Het budget wordt daarom met circa € 7 mln. bijgesteld.
-
12. De in de begroting opgenomen kasreeks voor de uitvoering van dit project was een reeks vóór gunning. Deze gunning heeft inmiddels plaats gevonden, met als gevolg dat het kasritme aangepast moet worden op de planning van de aannemer. Voor 2013 betekent dit een verlaging van het budget met circa € 5 mln.
-
13. In 2013 zijn minder kosten gemaakt voor vastgoed en nadeelcompensatie. Nog niet duidelijk is of dit leidt tot een meevaller. Vooralsnog wordt € 3 mln. uit het budget voor dit project naar 2014 doorgeboekt.
-
14. Het budget wordt verhoogd vanwege:
-
– het manifesteren van een indexeringsverschil waarvoor het Rijk garant staat;
-
– de mogelijkheid om met een totaalaanpak het toekomstig indexeringsverschil af te kopen en de kans op vertraging te verkleinen en
-
– een scopewijziging die bij het TB (2010) is doorgevoerd, maar waarvoor nu budget beschikbaar is gesteld.
Naast deze verhoging van de geraamde uitgaven in 2013 met circa € 14 mln. wordt als gevolg van een versnelde uitvoering van het project bijna € 24 mln. aan het budget toegevoegd.
-
-
15. Door afronding van discussies met aannemer, leidt de uitvoering van dit project tot vervroegde uitgaven (€ 18 mln.) in 2013.
-
16. Door de regio (provincie Overijssel, gemeente Hellendoorn, Stichting Bodemsanering NS) wordt € 7 mln. bijgedragen aan de N35 Combiplan Nijverdal aan de afgesproken scope. Hiervoor wordt een desaldering (hogere ontvangsten/- uitgaven) aangebracht.
Verder is de planning van ProRail en de aannemer voor de uitvoering van dit project aangepast. De eerder in 2013 verwachte uitgaven zullen hierdoor in 2014 plaatsvinden (€ 27 mln.). Het project blijft overigens binnen de afgesproken mijlpalen.
Als laatste wordt bijna € 1 mln. uit Verkenningen en planuitwerkingen (12.03.02) overgeboekt als bijdrage in het re-engeneeringsonderzoek N35 combiplan.
-
17. De lagere realisatie uitgaven zijn voornamelijk te vinden op de onderstaande projecten:
-
– Beter Benutten: Door met name een bijstelling van de in de plannen van aanpak vastgestelde planningen door langere voorbereiding en de tijd die nodig is om de go/no go besluitvorming te doorlopen, schuift circa € 22 mln. door van 2013 naar 2014. De uiterlijke opleverdatum blijft overigens wel staan op ultimo 2014;
-
– A10 Zuidas: De afstemming en opdrachtverlening heeft meer tijd gekost dan oorspronkelijk was voorzien, waardoor een deel van de werkzaamheden voorbereiding/realisatie van 2013 naar 2014 doorschuiven (circa € 5 mln.);
-
– N18 Varsseveld-Enschede: Hier is sprake van een fasewisseling ten behoeve van anticiperende aankopen en wordt voor die activiteiten bijna € 10 mln. overgeboekt uit hoofdproduct 12.03.02.
-
Planuitwerkingsprogr. Hoofdwegennet (12.03.02) | Projectbudget | Openstelling | Toelichting | ||
---|---|---|---|---|---|
Projectomschrijving | huidig | vorig | huidig | vorig | |
Verplicht | |||||
Realisatieuitgaven op IF12.03.01 mbt planuitwerkingsprojecten | – 329 | – 328 | |||
Projecten Nationaal | |||||
Beter Benutten | 465 | 465 | nvt | nvt | |
Geluidsaneringprogramma – weg | 252 | 255 | nvt | nvt | |
Lucht – weg (NSL hoofdwegennet) | 235 | 235 | nvt | nvt | |
Externe Planuitwerkings Kosten Hoofdwegennet | 243 | 243 | nvt | nvt | |
Projecten Noord-Holland, Utrecht en Flevoland | |||||
A1/A6/A9 Schiphol – Amsterdam – Almere, deeltraject A9 | Deel 4: 2024–2026 | Deel 4: 2024–2026 | |||
Amstelveen (deel 4) en A6 Almere (deel 5) | 1.039 | 1.039 | Deel 5: 2020–2022 | Deel 5: 2020–2022 | |
A10 Zuidas | 640 | 640 | 2028 | 2028 | |
A10 Knooppunten De Nieuwe Meer en Amstel | 332 | 332 | 2028 | 2028 | |
N23 Alkmaar – Zwolle | 36 | 36 | 2015 | 2015 | |
A12/A27 Ring Utrecht | 1.120 | 1.120 | 2024–2026 | 2024–2026 | |
Rijksbijdrage aan de Noordelijke Randweg Utrecht | 163 | 163 | 2026–2028 | 2026–2028 | |
A27/A1 Utrecht.N. – knp. Eemnes – asl.Bunschoten | 261 | 261 | 2018 | 2018 | |
A28/A1 Knooppunt Hoevelaken | 699 | 699 | 2022–2024 | 2022–2024 | |
A27 Houten – Hooipolder | 721 | 721 | 2023–2025 | 2023–2025 | |
Stedelijke Bereikbaarheid Almere | 25 | 25 | nvt | nvt | |
Projecten Zuidvleugel | |||||
A13/A16 Rotterdam (excl. tolopbrengsten) | 710 | 710 | 2021 | 2021 | |
Projecten Oost-Nederland | |||||
A1 Apeldoorn Zuid – Beekbergen | 36 | 36 | 2016–2018 | 2016–2018 | |
A12 Ede – Grijsoord | 110 | 110 | 2016–2018 | 2016–2018 | |
A12/A15 Ressen – Oudbroeken (excl. tolopbrengsten) (ViA15) | 529 | 529 | 2019 | 2019 | |
N18 Varsseveld – Enschede | 316 | 316 | 2017 | 2017 | |
N35 Zwolle – Wijthmen | 48 | 48 | 2016–2018 | 2016–2018 | |
Projecten Noord-Nederland | |||||
A7 Zuidelijke Ringweg Groningen, fase 2 | 551 | 551 | 2019–2021 | 2019–2021 | |
Gebonden | |||||
Projecten Nationaal | |||||
Beter Benutten | 50 | 50 | nvt | nvt | |
Reservering meerkosten tunnelveiligheid | 0 | 0 | nvt | nvt | |
Reservering tolopgave DBFM-aanbestedingen NWO, A13/A16 en A12/A15 | 301 | 301 | nvt | nvt | |
Reservering tegenvallende tolopbrengsten A12/A15 | 60 | 60 | nvt | nvt | |
Reserveringen voor LCC | 223 | 223 | nvt | nvt | |
Projecten Zuidvleugel | |||||
A4 Haaglanden (passage en poorten & inprikkers) | 440 | 440 | |||
A4-A44 Rijnlandroute | 555 | 555 | |||
Projecten Brabant | |||||
A58 Eindhoven – Tilburg | 317 | 317 | |||
A58 Sint Annabosch – Galder | 116 | 116 | |||
N65 Vught – Haaren | 45 | 45 | |||
Projecten Limburg | |||||
A2 't Vonderen – Kerensheide | 254 | 254 | |||
Projecten Oost-Nederland | |||||
N35 Nijverdal – Wierden | 40 | 40 | |||
Bestemd | 2.617 | 2.641 | 1 | ||
Projecten in voorbereiding | |||||
Projecten Nationaal | |||||
Reservering consequenties areaaluitbreiding op beheer en onderhoud | |||||
Studiebudget Verkenningen | |||||
Projecten Noordwest-Nederland | |||||
A7/A8/A9/A10 Noordkant Amsterdam | |||||
Projecten Zuidvleugel | |||||
Blankenburgverbinding (NWO) | |||||
A20 Nieuwerkerk – Gouwe | |||||
Projecten Oost-Nederland | |||||
A1 Zone (Apeldoorn-Deventer-Azelo) | |||||
Overige projecten in voorbereiding | |||||
Gesignaleerde Risico's | |||||
Totaal programma planuitwerking en verkenning | 13.220 | 13.247 | |||
Begroting IF 12.03.02 | 13.220 | 13.247 |
-
1. Voor de aanpassing van het budget met € 24 mln. wordt verwezen naar de toelichting met betrekking tot Sluiskil onder operationele doelstelling 14.02.
Operationele doelstelling 12.04
Realisatieprogramma | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
Geintegreerde contractvormen (12.04) | huidig | vorig | huidig | vorig | huidig | vorig | |
Projecten Noord-Holland, Utrecht en Flevoland | |||||||
Aflossing tunnels | 53 | 53 | 1.225 | 1.225 | – | – | |
A10 Tweede Coentunnel | 200 | 200 | 2.196 | 2.196 | 2013–2014 | 2013–2014 | |
A1/A6/A9 Schiphol – Amterdam – Almere | 36 | 3 | 1.496 | 1.463 | 1 | ||
A12 Lunetten – Veenendaal | 65 | 65 | 627 | 627 | 2013 | 2013 | |
Projecten Zuidvleugel | |||||||
A15 Maasvlakte – Vaanplein | 24 | 41 | 2.031 | 2.031 | 2015 | 2015 | 2 |
Projecten Brabant | |||||||
A59 Rosmalen – Geffen, PPS | 0 | 2 | 288 | 288 | 2005 | 2005 | 3 |
Projecten Noord-Nederland | |||||||
N31 Leeuwarden – Drachten | 6 | 6 | 146 | 146 | 2007 | 2007 | |
N33 Assen – Zuidbroek | 12 | 12 | 315 | 315 | |||
Totaal | 396 | 382 | 8.324 | 8.291 |
-
1. Uit het realisatie-onderdeel (12.03.01) wordt het niet DBFM gedeelte van dit project van circa € 22 mln. overgeboekt.
Vervolgens wordt een versnelling ingezet in de uitvoering van het niet DBFM gedeelte van bijna € 11 mln. Het betreft hier voornamelijk het verleggen van kabels en leidingen, wat sneller loopt dan verwacht.
-
2. De aannemer is conform het DFBM contract een 100% beschikbaarheidscorrectie opgelegd, omdat niet alles is uitgevoerd wat was afgesproken. Hierdoor wordt circa € 3 mln. niet besteed. Verder is een vertraging ontstaan bij het verleggen van kabels en leidingen en is de opdracht voor het bedieningssysteem Tunnels nog niet verstrekt. Met het laatste is een bedrag gemoeid van circa € 14 mln. dat evenals de € 3 mln. van de beschikbaarheidscorrectie doorschuift naar 2014.
-
3. De uitgaven voor nadeelcompensatie vallen naar verwachting lager uit dan waarmee in de begroting rekening is gehouden.
Operationele doelstelling 12.07
Het opheffen van de minregel op de investeringsruimte door het niet uitkeren van de prijsbijstelling over 2013 kan worden aangebracht door een verschuiving met het jaar 2014 (ten laste van het voordelig saldo) aan te brengen.
Verplichtingen
De verplichtingenramingen zijn bijgesteld naar aanleiding van de projectenplanningen zoals gecommuniceerd in het MIRT Projectenboek 2014 en aangesloten bij de uitgavenramingen. In de realisatiefase worden verschuivingen in de projectramingen naar 2014 en later aangebracht voornamelijk door bijstellingen van de uitvoeringsplanningen. Dit doet zich voornamelijk voor op de projecten Groot Variabel Onderhoud (stalen kunstwerken), ZSM Spoedwet wegverbreding, de A4/9 Badhoevedorp, N61 Hoek-Schoondijke en de N31 Leeuwarden (De Haak)). Op de projecten A1/A6/A9 Schiphol-Amsterdam-Almere en N33 Assen-Zuidbroek wordt een verlaging aangebracht dat voornamelijk veroorzaakt wordt door de technische correctie bij de in 2012 afgesloten DBFM contracten. Verder is de gunning van het nieuwe DBFM project A12 Ede-Grijsoord nu gepland in 2014. De aanbesteding daarvoor is gestart in mei 2013. De gunning/contractclose is voor medio 2014 gepland.
Bij de projecten in planuitwerking en verkenning zijn bij MJN de verplichtingenramingen bijgesteld voor diverse projecten om aan te sluiten bij de actuele projectplanningen en uitgavenramingen. Dit betreft onder andere wijzigingen in het verplichtingenbudget voor 2013 en later bij de projecten A13/16 Rotterdam, A27/A1 Utrecht-Noord – knooppunt Eemnes – Aansluiting Bunschoten en N18 Varsseveld – Enschede.
Ontvangsten
De huidige verwachting is dat ten opzichte van de raming in de Miljoenennota dit jaar circa € 46 mln. meer zal worden gerealiseerd. Dit bedrag, wat een saldering is van hogere en lagere ontvangsten, doet zich met name voor op de volgende projecten:
-
– A12 Den Haag-Gouda: Het project is afgerond. De nog resterende geraamde € 2 mln. zal niet meer worden ontvangen;
-
– A12 Utrecht West: Het project is zo goed als afgerond. Hier zal circa € 1 mln. meer worden ontvangen;
-
– A12/A15 Ressen-Oudbroeken (ViA15): conform de gesloten bestuursovereenkomst wordt het ontvangstenritme in 2013 opgehoogd met € 20 mln.;
-
– A15 Maasvlakte Vaanplein: De prognose van de te ontvangen bijdragen voor het plaatsen van luchtschermen (€ 4,6 mln.) wordt verschoven naar 2016, omdat er onzekerheid is of de luchtschermen nog nodig zijn/geplaatst gaan worden;
-
– A2 Holendrecht: Op dit project zal voor € 157 mln. aan bedragen ontvangen worden. Het meerendeel van deze ontvangsten is reeds binnen gekomen. Hiervan wordt € 20 mln. ontvangen als gevolg van een bestuursakkoord met de provincie Utrecht. Die gelden waren tot op heden nog niet in de begroting verwerkt.
-
– A28 Utrecht-Amersfoort: Een niet geraamde ontvangst van circa € 0,5 mln. van de Gemeente Houten, onderdeel minder hinder (Geluidschermen);
-
– A4 Delft-Schiedam: Op verzoek van de regionale partijen wordt het merendeel van de ontvangsten in één keer gefactureerd. Hierdoor wordt dit jaar € 15 mln. meer ontvangen dan geraamd;
-
– A9 Badhoevedorp: De bijdrage van de stadsregio van ruim € 7 mln. is doorgeschoven naar 2016, in verband met een subsidieaanvraag. De stadsregio heeft aangegeven pas te betalen wanneer de voorziening beschikbaar is;
-
– Dynamisch Verkeersmanagement: De nog in de begroting geraamde ontvangst van € 1,2 mln. worden niet meer gerealiseerd;
-
– N35 Combiplan Nijverdal: Conform de scope van 17 december 2012 wordt de ontvangsten met € 7,7 mln. verhoogd:
-
– N35 Zwolle-Wijthmen: De start van het project is in verband met bezuinigingen vertraagd. Dit heeft gevolgen voor de voorbereidende uitvoeringswerkzaamheden en analoog daaraan de ontvangsten (– € 0,5 mln.);
-
– N50 Ramspol-Ens: Het project is opgeleverd. De nog in de begroting geraamde ontvangsten van € 2,1 mln. worden niet meer gerealiseerd;
-
– N61 Hoek-Schoondijke: Op basis van de verwachte grondverkopen door de Dienst Landelijk Gebied, wordt de raming in verband met tegenvallend grondverkopen met € 1,8 mln. neerwaarts bijgesteld.
Artikel 12 Hoofdwegennet | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 12.01 Verkeersmgmt. | 22.072 | 18.733 | 20.539 | 20.412 | 19.700 | 19.700 | 19.701 | 19.700 | 19.701 | 19.701 | 19.701 | 22.290 | 22.290 | 22.290 | 22.290 | 22.290 | |||
Mutaties voorjaarsnota 2013 | – 1.499 | – 313 | – 658 | – 531 | 180 | 180 | 181 | 180 | 227 | 227 | 227 | – 2.363 | – 2.363 | – 2.363 | – 2.363 | – 2.363 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.01 Verkeersmgmt. | 20.573 | 18.420 | 19.881 | 19.881 | 19.880 | 19.880 | 19.882 | 19.880 | 19.928 | 19.928 | 19.928 | 19.927 | 19.927 | 19.927 | 19.927 | 19.927 | |||
Indexering 2013 | Intens./extens. | 5.631 | 389 | 353 | 377 | 377 | 377 | 377 | 377 | 377 | 373 | 347 | 333 | 320 | 293 | 294 | 291 | 376 | 2 |
Overboeking binnen artikel 12 | neutraal | 1.664 | 832 | 416 | 416 | 3 | |||||||||||||
Mutaties Miljoenennota 2014 | 1.221 | 769 | 793 | 377 | 377 | 377 | 377 | 377 | 373 | 347 | 333 | 320 | 293 | 294 | 291 | 376 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.01 Verkeersmgmt. | 21.794 | 19.189 | 20.674 | 20.258 | 20.257 | 20.257 | 20.259 | 20.257 | 20.301 | 20.275 | 20.261 | 20.247 | 20.220 | 20.221 | 20.218 | 20.303 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.01 Verkeersmgmt. | 21.794 | 19.189 | 20.674 | 20.258 | 20.257 | 20.257 | 20.259 | 20.257 | 20.301 | 20.275 | 20.261 | 20.247 | 20.220 | 20.221 | 20.218 | 20.303 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.02 Beheer, onderh & verv. | 413.384 | 494.537 | 350.416 | 361.701 | 475.925 | 472.235 | 468.503 | 471.333 | 438.022 | 523.691 | 523.692 | 522.636 | 522.638 | 522.636 | 522.636 | 534.812 | |||
Mutaties voorjaarsnota 2013 | 140.491 | 136.224 | 218.946 | 109.831 | 31.085 | 16.861 | 29.516 | 26.579 | – 20.075 | – 105.846 | – 105.846 | – 99.752 | – 68.452 | – 68.452 | – 68.452 | – 76.290 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.02 Beheer, onderh & verv. | 553.875 | 630.761 | 569.362 | 471.532 | 507.010 | 489.096 | 498.019 | 497.912 | 417.947 | 417.845 | 417.846 | 422.884 | 454.186 | 454.184 | 454.184 | 458.522 | |||
Indexering 2013 | Intens./extens. | 119.793 | 8.563 | 10.454 | 9.004 | 7.485 | 8.014 | 7.723 | 7.862 | 7.862 | 6.344 | 6.258 | 6.211 | 6.390 | 6.818 | 6.820 | 6.812 | 7.173 | 2 |
Overboeking binnen artikel 12 | neutraal | 2.796 | – 508 | 2.723 | 581 | 3 | |||||||||||||
Netwerkoverstijgende kosten | Intens./extens. | – 105.607 | – 9.482 | – 8.796 | – 7.345 | – 16.065 | – 14.415 | – 6.011 | – 8.701 | – 8.707 | – 8.763 | – 8.661 | – 8.661 | 4 | |||||
DBFM N33 Assen-Zuidbroek | Intens./extens. | – 44.224 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | – 2.764 | 18 |
DBFM A1/A6 SAA | Intens./extens. | – 78.400 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | – 4.900 | 20 |
Mutaties Miljoenennota 2014 | – 9.091 | – 6.006 | – 3.282 | – 15.663 | – 14.065 | – 5.952 | – 8.503 | – 8.509 | – 10.083 | – 10.067 | – 10.114 | – 1.274 | – 846 | – 844 | – 852 | – 491 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.02 Beheer, onderh & verv. | 544.784 | 624.755 | 566.080 | 455.869 | 492.945 | 483.144 | 489.516 | 489.403 | 407.864 | 407.778 | 407.732 | 421.610 | 453.340 | 453.340 | 453.332 | 458.031 | |||
Saldo 2013 | Intertemporeel | – 3.525 | – 3.525 | a | |||||||||||||||
Overboeking binnen artikel 12 | neutraal | 3.000 | 3.000 | j | |||||||||||||||
Mutaties Najaarsnota 2013 | – 525 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.02 Beheer, onderh & verv. | 544.259 | 624.755 | 566.080 | 455.869 | 492.945 | 483.144 | 489.516 | 489.403 | 407.864 | 407.778 | 407.732 | 421.610 | 453.340 | 453.340 | 453.332 | 458.031 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.03 Aanleg | 1.451.135 | 1.595.469 | 895.245 | 1.858.548 | 1.405.260 | 1.223.702 | 1.861.594 | 2.239.198 | 1.193.710 | 1.239.224 | 822.631 | 675.887 | 205.970 | 148.541 | 146.211 | 123.543 | |||
Mutaties voorjaarsnota 2013 | – 223.503 | – 245.662 | – 268.520 | – 932.007 | – 175.732 | – 3.129 | – 61.106 | 239.152 | – 996 | 355.225 | 508.273 | 537.093 | 845.867 | 838.514 | 11.026 | – 39.823 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.03 Aanleg | 1.227.632 | 1.349.807 | 626.725 | 926.541 | 1.229.528 | 1.220.573 | 1.800.488 | 2.478.350 | 1.192.714 | 1.594.449 | 1.330.904 | 1.212.980 | 1.051.837 | 987.055 | 157.237 | 83.720 | |||
Desaldering | desaldering | 100 | 100 | 1 | |||||||||||||||
Indexering 2013 | Intens./extens. | 243.544 | 21.538 | 21.415 | 19.365 | 26.128 | 27.060 | 20.447 | 18.735 | 12.114 | 18.259 | 20.552 | 19.402 | 7.708 | 4.078 | 4.897 | 931 | 915 | 2 |
Overboeking binnen artikel 12 | neutraal | – 5.460 | – 824 | – 666 | – 3.389 | – 581 | 3 | ||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | 4.252 | 5.356 | 2.280 | 1.135 | – 63.500 | 63.500 | – 4.519 | 5 | ||||||||||
Overboeking HXII – IF artikel 12 | Intens./extens. | – 12.757 | – 3.328 | – 32 | – 232 | – 3.301 | – 5.512 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | 6 |
DBFM N33 Assen-Zuidbroek | Intens./extens. | – 186.960 | – 69.201 | – 117.759 | 18 | ||||||||||||||
MJPO | Intens./extens. | – 168.004 | – 9.904 | – 19.772 | – 19.766 | – 19.763 | – 19.761 | – 19.755 | – 19.756 | – 19.755 | – 19.772 | 19 | |||||||
DBFM A1/A6 SAA | Intens./extens. | – 802.027 | – 11.208 | – 50.947 | – 175.259 | – 441.204 | – 123.409 | – 6.130 | – 6.130 | 6.130 | 6.130 | 20 | |||||||
Kasritme regiobijdrage | Desaldering | 0 | – 29.281 | 209.281 | – 80.000 | – 100.000 | 21 | ||||||||||||
Overboeking binnen artikel 12 | neutraal | 391 | – 12.882 | 41.055 | – 3.604 | – 3.604 | – 3.604 | – 3.604 | – 3.604 | – 3.604 | – 3.604 | – 2.948 | 0 | 0 | 0 | 0 | 0 | 391 | 22 |
A4 Delft Schiedam en A10 2e Coentunnel | Intens./extens. | – 91.000 | – 11.229 | 7.475 | – 24.969 | 7.631 | – 2.183 | – 2.283 | – 2.283 | – 2.183 | – 40.139 | – 2.283 | 461 | – 1.063 | – 1.063 | – 1.063 | – 1.063 | – 14.763 | 23 |
Leenconstructie wegen-reg/lok. | Intens./extens. | 0 | – 5.686 | – 173.268 | – 32.753 | 24.581 | 63.858 | 49.203 | 52.828 | 21.237 | 24 | ||||||||
Areaalgroei (artikel 18) | Intens./extens. | 797.534 | 58.245 | 58.245 | 58.245 | 58.245 | 58.245 | 31.770 | 442.770 | 31.770 | 25 | ||||||||
Meevallers A2/ZSM | Intens./extens. | – 69.300 | – 22.000 | – 15.000 | – 32.300 | 26 | |||||||||||||
Mutaties Miljoenennota 2014 | – 81.678 | – 148.460 | 7.328 | – 447.231 | – 251.148 | – 85.472 | 1.000 | – 183.007 | 49.834 | 84.479 | 122.171 | 94.300 | 94.301 | 37.053 | 418.332 | – 1.491 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.03 Aanleg | 1.145.954 | 1.201.347 | 634.053 | 479.310 | 978.380 | 1.135.101 | 1.801.488 | 2.295.343 | 1.242.548 | 1.678.928 | 1.453.075 | 1.307.279 | 1.146.138 | 1.024.108 | 575.569 | 82.229 | |||
Saldo 2013 | Intertemporeel | 0 | – 34.724 | 34.724 | a | ||||||||||||||
Regiobijdrage N35 Zwolle-Almelo | desaldering | 7.011 | 7.011 | b | |||||||||||||||
Overboeking HXII – IF artikel 12 | Intens./extens. | 400 | 400 | d | |||||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | – 24.000 | – 24.000 | i | |||||||||||||||
Overboeking binnen artikel 12 | neutraal | – 24.597 | – 24.597 | j | |||||||||||||||
Mutaties Najaarsnota 2013 | – 75.910 | 34.724 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.03 Aanleg | 1.070.044 | 1.236.071 | 634.053 | 479.310 | 978.380 | 1.135.101 | 1.801.488 | 2.295.343 | 1.242.548 | 1.678.928 | 1.453.075 | 1.307.279 | 1.146.138 | 1.024.108 | 575.569 | 82.229 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.04 GIV/PPS | 420.256 | 566.737 | 508.980 | 251.390 | 188.606 | 176.441 | 177.205 | 178.213 | 174.459 | 150.938 | 208.977 | 172.637 | 172.231 | 169.899 | 111.513 | 111.513 | |||
Mutaties voorjaarsnota 2013 | – 82.652 | – 13.671 | – 27.382 | 149.400 | – 5.021 | 8.690 | 8.677 | 8.638 | 6.949 | 10.026 | – 37.474 | 60.919 | – 6.528 | – 6.528 | – 7.634 | – 22.025 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.04 GIV/PPS | 337.604 | 553.066 | 481.598 | 400.790 | 183.585 | 185.131 | 185.882 | 186.851 | 181.408 | 160.964 | 171.503 | 233.556 | 165.703 | 163.371 | 103.879 | 89.488 | |||
Indexering 2013 | Intens./extens. | 64.629 | 5.807 | 9.176 | 7.990 | 6.649 | 3.046 | 3.071 | 3.084 | 3.100 | 3.010 | 2.671 | 2.845 | 4.126 | 3.007 | 3.007 | 2.020 | 2.020 | 2 |
DBFM N33 Assen-Zuidbroek | Intens./extens. | 239.345 | 11.809 | 44.577 | 13.039 | 13.039 | 13.039 | 13.039 | 13.039 | 13.056 | 13.056 | 13.056 | 13.056 | 13.056 | 13.121 | 13.121 | 13.121 | 13.121 | 18 |
DBFM A1/A6 SAA | Intens./extens. | 859.264 | 3.321 | 10.101 | 10.101 | 10.101 | 255.360 | 51.747 | 51.747 | 51.747 | 51.747 | 51.747 | 51.934 | 51.934 | 51.934 | 51.934 | 51.934 | 51.875 | 20 |
Overboeking binnen artikel 12 | neutraal | 0 | 12.882 | – 41.055 | 3.604 | 3.604 | 3.604 | 3.604 | 3.604 | 3.604 | 3.604 | 2.948 | 22 | ||||||
A4 Delft Schiedam en A10 2e Coentunnel | Intens./extens. | 122.444 | 11.229 | 14.525 | 39.969 | 24.669 | 2.183 | 2.283 | 2.283 | 2.183 | 2.283 | 2.283 | – 461 | 1.063 | 1.063 | 1.063 | 1.063 | 14.763 | 23 |
Mutaties Miljoenennota 2014 | 45.048 | 37.324 | 74.703 | 58.062 | 277.232 | 73.744 | 73.757 | 73.690 | 73.700 | 72.705 | 67.374 | 70.179 | 69.125 | 69.125 | 68.138 | 81.779 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.04 GIV/PPS | 382.652 | 590.390 | 556.301 | 458.852 | 460.817 | 258.875 | 259.639 | 260.541 | 255.108 | 233.669 | 238.877 | 303.735 | 234.828 | 232.496 | 172.017 | 171.267 | |||
Saldo 2013 | Intertemporeel | 0 | – 8.293 | 8.293 | a | ||||||||||||||
Overboeking binnen artikel 12 | neutraal | 22.064 | 22.064 | j | |||||||||||||||
Mutaties Najaarsnota 2013 | 13.771 | 8.293 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.04 GIV/PPS | 396.423 | 598.683 | 556.301 | 458.852 | 460.817 | 258.875 | 259.639 | 260.541 | 255.108 | 233.669 | 238.877 | 303.735 | 234.828 | 232.496 | 172.017 | 171.267 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.06 Netwerk HWN | 422.016 | 396.659 | 382.425 | 379.372 | 376.644 | 374.218 | 373.970 | 373.898 | 374.570 | 374.570 | 374.570 | 375.204 | 375.204 | 375.204 | 375.204 | 375.204 | |||
Mutaties voorjaarsnota 2013 | 13.130 | 9.114 | 6.015 | 3.812 | 1.464 | 1.449 | 1.447 | 1.447 | 1.644 | 2.052 | 2.277 | 2.485 | 2.920 | 2.909 | 2.948 | 1.584 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.06 Netwerk HWN | 435.146 | 405.773 | 388.440 | 383.184 | 378.108 | 375.667 | 375.417 | 375.345 | 376.214 | 376.622 | 376.847 | 377.689 | 378.124 | 378.113 | 378.152 | 376.788 | |||
Indexering 2013 | Intens./extens. | 14.189 | 947 | 886 | 876 | 878 | 878 | 878 | 878 | 878 | 880 | 880 | 880 | 890 | 890 | 890 | 890 | 890 | 2 |
Overboeking binnen artikel 12 | neutraal | 1.000 | 500 | 250 | 250 | 3 | |||||||||||||
Overboeking HXII – IF artikel 12 | Intens./extens. | – 568 | – 142 | – 142 | – 142 | – 142 | 6 | ||||||||||||
Loonbijstelling 2013 | Intens./extens. | 5.606 | 393 | 368 | 353 | 350 | 347 | 345 | 345 | 345 | 345 | 345 | 345 | 345 | 345 | 345 | 345 | 345 | 14 |
Mutaties Miljoenennota 2014 | 1.698 | 1.362 | 1.337 | 1.086 | 1.225 | 1.223 | 1.223 | 1.223 | 1.225 | 1.225 | 1.225 | 1.235 | 1.235 | 1.235 | 1.235 | 1.235 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.06 Netwerk HWN | 436.844 | 407.135 | 389.777 | 384.270 | 379.333 | 376.890 | 376.640 | 376.568 | 377.439 | 377.847 | 378.072 | 378.924 | 379.359 | 379.348 | 379.387 | 378.023 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.06 Netwerk HWN | 436.844 | 407.135 | 389.777 | 384.270 | 379.333 | 376.890 | 376.640 | 376.568 | 377.439 | 377.847 | 378.072 | 378.924 | 379.359 | 379.348 | 379.387 | 378.023 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.07 Investeringsruimte | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 846.208 | 1.037.381 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.07 Investeringsruimte | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 846.208 | 1.037.381 | |||
Indexering 2013 | Intens./extens. | – 454.973 | – 37.766 | – 42.732 | – 38.043 | – 41.956 | – 39.817 | – 32.936 | – 31.268 | – 24.883 | – 29.196 | – 31.260 | – 30.113 | – 19.885 | – 15.537 | – 16.360 | – 11.283 | – 11.938 | 2 |
Overboeking binnen Infrastructuurfonds | Intens./extens. | 4.519 | 4.519 | 5 | |||||||||||||||
MJPO | Intens./extens. | 168.004 | 9.904 | 19.772 | 19.766 | 19.763 | 19.761 | 19.755 | 19.756 | 19.755 | 19.772 | 19 | |||||||
Overboeking binnen artikel 12 | neutraal | – 391 | – 391 | 22 | |||||||||||||||
A4 Delft Schiedam en A10 2e Coentunnel | Intens./extens. | – 31.444 | – 22.000 | – 15.000 | – 32.300 | 37.856 | 23 | ||||||||||||
Areaalgroei (artikel 18) | Intens./extens. | – 411.000 | – 411.000 | 25 | |||||||||||||||
Meevallers A2/ZSM | Intens./extens. | 69.300 | 22.000 | 15.000 | 32.300 | 26 | |||||||||||||
Mutaties Miljoenennota 2014 | – 37.766 | – 42.732 | – 38.043 | – 41.956 | – 39.817 | – 32.936 | – 31.268 | – 14.979 | 28.432 | – 11.494 | – 10.350 | – 124 | 4.218 | 3.396 | – 398.009 | 7.443 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.07 Investeringsruimte | – 37.766 | – 42.732 | – 38.043 | – 41.956 | – 39.817 | – 32.936 | – 31.268 | – 14.979 | 28.432 | – 11.494 | – 10.350 | – 124 | 4.218 | 3.396 | 448.199 | 1.044.824 | |||
Saldo 2013 | Intertemporeel | 0 | 37.629 | – 37.629 | a | ||||||||||||||
Overboeking binnen artikel 12 | neutraal | 137 | 137 | j | |||||||||||||||
Mutaties Najaarsnota 2013 | 37.766 | – 37.629 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.07 Investeringsruimte | 0 | – 80.361 | – 38.043 | – 41.956 | – 39.817 | – 32.936 | – 31.268 | – 14.979 | 28.432 | – 11.494 | – 10.350 | – 124 | 4.218 | 3.396 | 448.199 | 1.044.824 | |||
Totaal uitgaven stand ontwerpbegroting 2013 HWN | 2.728.863 | 3.072.135 | 2.157.605 | 2.871.423 | 2.466.135 | 2.266.296 | 2.900.973 | 3.282.342 | 2.200.462 | 2.308.124 | 1.949.571 | 1.768.654 | 1.298.333 | 1.238.570 | 1.177.854 | 1.167.362 | |||
Totaal uitgaven stand eerste suppletoire wet 2013 HWN | 2.574.830 | 2.957.827 | 2.086.006 | 2.201.928 | 2.318.111 | 2.290.347 | 2.879.688 | 3.558.338 | 2.188.211 | 2.569.808 | 2.317.028 | 2.267.036 | 2.069.777 | 2.002.650 | 1.959.587 | 2.065.826 | |||
Totaal uitgaven stand Miljoenennota 2014 HWN | 2.494.262 | 2.800.084 | 2.128.842 | 1.756.603 | 2.291.915 | 2.241.331 | 2.916.274 | 3.427.133 | 2.331.692 | 2.707.003 | 2.487.667 | 2.431.671 | 2.238.103 | 2.112.909 | 2.048.722 | 2.154.677 | |||
Totaal uitgaven stand tweede suppletoire wet 2013 HWN | 2.469.364 | 2.805.472 | 2.128.842 | 1.756.603 | 2.291.915 | 2.241.331 | 2.916.274 | 3.427.133 | 2.331.692 | 2.707.003 | 2.487.667 | 2.431.671 | 2.238.103 | 2.112.909 | 2.048.722 | 2.154.677 | |||
Ontwerpbegroting 2013 artikelonderdeel 12.09 Ontvangsten HWN | 262.105 | 182.021 | 57.577 | 490.329 | 112.698 | 33.050 | 33.050 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | – 134.654 | – 18.901 | 36.034 | – 350.682 | 29.386 | 89.868 | – 1.692 | 286.076 | 0 | 35.000 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 12.09 Ontvangsten HWN | 127.451 | 163.120 | 93.611 | 139.647 | 142.084 | 122.918 | 31.358 | 286.076 | 0 | 35.000 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Bijdrage Stadsgewest Haaglanden | desaldering | 100 | 100 | 1 | |||||||||||||||
Kasritme regiobijdrage | desaldering | 0 | – 29.281 | 209.281 | – 80.000 | – 100.000 | 21 | ||||||||||||
Mutaties Miljoenennota 2014 | 100 | – 29.281 | 209.281 | 0 | – 80.000 | – 100.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 12.09 Ontvangsten | 127.551 | 133.839 | 302.892 | 139.647 | 62.084 | 22.918 | 31.358 | 286.076 | 0 | 35.000 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | 37.982 | – 37.982 | a | ||||||||||||||
Regiobijdrage N35 Zwolle-Almelo | desaldering | 7.011 | 7.011 | b | |||||||||||||||
Overboeking binnen artikel 12 | neutraal | 604 | 604 | j | |||||||||||||||
Mutaties Najaarsnota 2013 | 45.597 | – 37.982 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 12.09 Ontvangsten | 173.148 | 95.857 | 302.892 | 139.647 | 62.084 | 22.918 | 31.358 | 286.076 | 0 | 35.000 | 0 | 0 | 0 | 0 | 0 | 0 |
Artikel 12 Hoofdwegennet
-
1. Dit betreft de verwerking van een Beter Benutten opdracht van het Stadsgewest Haaglanden. Het gaat om de A13 Rijswijk-Ypenburg: verlengen opstelstrook.
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat tot daadwerkelijke inpassing in enig jaar de kans aanwezig is op een kastekort. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
3. Dit betreft de volgende verschuivingen binnen artikel 12 Wegen tussen aanleg en de overige artikelonderdelen:
-
– De jaarlijkse bijdrage van het Directoraat Generaal Bereikbaarheid (DGB) aan RWS in de financiering van de Verkeersonderneming voor de periode 2012–2015;
-
– Een overboeking voor de juiste toedeling van de index 2012 aan overige maatregelen (van 12.02 naar 12.03);
-
– Per 1 juli 2012 is de geluidwetgeving voor rijkswegen gewijzigd en opgenomen in de Wet milieubeheer («SWUNG»). Als gevolg van deze wetswijziging moeten aanvullende beheer- en onderhoudskosten worden gemaakt om te kunnen blijven voldoen aan de vastgestelde geluidsproductieplafonds. Voor de periode 2017–2028 zullen de bedragen nog nader worden «gehard».
-
-
4. In 2009 is heeft het Ministerie van Financiën toestemming verleend om een deel van de vordering van RWS op IenM in een periode van 15 jaar af te betalen. Hiervoor is een 15-jarige kasreeks in de begroting opgenomen. Deze reeks is technisch opgenomen in artikel 12.02 (Beheer en Onderhoud). Deze bijdrage is echter niet voor Beheer en Onderhoud bedoeld. Voorgesteld wordt om de afbetalingsreeks op te nemen in artikel 18.08.02 (Overige netwerkoverstijgende kosten). De voorwaarden waaronder de betaling aan RWS plaatsvindt blijven onveranderd.
-
5. Deze mutatie betreft onderstaande verschuivingen over de diverse aanlegartikelen van het Infrastructuurfonds:
-
– De extra bijdrage voor de Rotterdamse baan voor regionale/lokale infrastructuur (artikel 14) wordt via een kasschuif met het project A4 Delft – Schiedam op artikel 12 (uit het aanbestedingvoordeel) naar voren gehaald. De extra bijdrage wordt gedekt binnen het programmabudget op Regionale/lokale infrastructuur;
-
– Op operationele doelstelling 17.01 Westerscheldetunnel wordt voor de jaren 2013/2014 nog circa € 0,3 mln. aan claims voor nadeelcompensatie verwacht. Dit bedrag is sterk afhankelijk van de uitspraak van de Raad van State. Na 2014 worden geen claims meer verwacht. Het restant kan daarom worden overgeheveld naar de investeringsruimte op 12.07;
-
– Vanwege de verkenning seinoptimalisatie Amersfoort (als maatregel uit het regiopakket) wordt circa € 0,1 mln. overgeboekt vanuit artikel 12 (Beter Benutten) naar artikel 13 Spoorwegen;
-
– In het kader van een teruggave van middelen voor Anders Betalen voor Mobiliteit projecten (ABvM) wordt een overboeking tussen de artikelen 14 en 12 in het fonds aangebracht;
-
– Een overboeking uit artikel 13 Planuitwerking naar artikel 12 voor realisatiekosten die worden voorzien bij het project Zuidas;
-
– Een budgetoverheveling vanuit artikel 12 (project A4 Burgerveen-Leiden) naar artikel 17 HSL voor het schadeschap A4-HSL.
-
-
6. Tussen de Begroting van hoofdstuk XII en dit artikel worden de volgende overboekingen aangebracht:
-
– Subsidieregeling Euro-VI (schone motoren vrachtwagens en bussen): voor 2013 wordt een bedrag van € 5 mln. overgeheveld. De uitvoering van deze regeling wordt verantwoord op artikel 20 in de Begroting van hoofdstuk XII;
-
– Beter Benutten: vanuit artikel 12 Beter benutten vindt een overboeking plaats naar de Begroting van hoofdstuk XII voor programmakosten en externe inhuur door het verlengen van de projectduur (in totaal € 1,2 mln.). Tevens worden vanuit de Begroting van hoofdstuk XII de in 2012 onbesteed gebleven gelden voor Beter Benutten (circa € 0,8 mln.) teruggeboekt naar artikel 12 in het infrastructuurfonds voor het in standhouden van het projecttotaal van Beter Benutten;
-
– Bijdrage van RWS (uit de artikelen 12, 15 en 18) aan de opdracht PDOK aan het Kadaster en Geonovum voor de jaren 2013–2016 (bijna € 0,3 mln. per jaar);
-
– Een overboeking naar het Ministerie van BZK voor de elektronische publicatie van verkeersbesluiten (€ 0,1 mln.) en een overboeking vanuit de Begroting van hoofdstuk XII (€ 0,9 mln.) in dit kader.
-
-
14. Dit is de toevoeging aan het Infrastructuurfonds van het uitgekeerde deel van de loonbijstelling 2013. Het betreft de hogere uitgaven voor de werkgever aan ouderdoms- en nabestaandenpensioen en een stijging van de bijdrage in het kader van de Zorgverzekeringswet.
-
18. Bij het DBFM-contract (Design, Build, Finance & Maintain) voor het project N33 Assen-Zuidbroek heeft de «financial close» plaatsgevonden, dit is budgettair verwerkt. Op verzoek van het Ministerie van Financiën wordt hier een proef uitgevoerd waarbij inflatiegerelateerde vergoedingen wordt uitbetaald. Een consequentie van deze proef is dat de mijlpaalvergoeding binnen het contract gemaximaliseerd is op 5 procent van de investeringssom.
-
19. MJPO: Het programma loopt af na 2018. Het resterende budget is overgeheveld naar de investeringsruimte van wegen (12.07).
-
20. Bij het DBFM-contract voor het project A1/A6 Schiphol Amsterdam Almere heeft de «financial close» plaatsgevonden, dit is budgettair verwerkt.
-
21. Dit betreft een aanpassing van kasritme van de regionale bijdragen aan de projecten A12/A15 Ressen-Oudbroeken en N35 Zwolle-Wijthmen.
-
22. Dit betreft een mutatie op basis van een actualisatie door RWS en beleid, rekening houdend met nieuwe planningsinformatie van RWS.
-
23. Dit betreft de administratieve verwerking van de wijzigingen in de budgetten van A4 Delft Schiedam en A10 2e Coentunnel.
-
24. Met deze schuif worden de kasreeksen voor de wegenprojecten Rotterdamsebaan en Verkeersruit Eindhoven (NOC) op begrotingsartikel 14 aangesloten bij de actuele planning.
-
25. Dit betreft het treffen van een reservering voor consequenties areaalgroei op beheer en onderhoud wegen onder planuitwerking vanuit de Investeringsruimte wegen en vanuit de bestaande reservering op artikel 18.12.
-
26. Bij A2 Holendrecht – Oudenrijn (Leidsche Rijn Tunnel) is in 1e suppletoire begroting 2013 € 56 mln. toegevoegd aan het budget. Omdat slechts een beperkt deel nodig bleek, wordt bij deze begroting € 37 mln. afgeboekt. Binnen de ZSM projecten is sprake van een meevaller (€ 32,3 mln.).
a, b, d, i en j.
Voor een toelichting op deze mutaties wordt verwezen naar het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.
Artikel 13 Spoorwegen
13 Spoorwegen | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Verplichtingen | 1.562.567 | 3.479.875 | – 371.635 | – 286.097 | – 657.732 | 2.822.143 |
Uitgaven | 2.197.753 | 2.367.705 | 12.095 | 11.563 | 23.658 | 2.391.363 |
Waarvan juridisch verplicht | 100% | |||||
13.02 Beheer, onderhoud en vervanging | 1.324.516 | 1.319.905 | – 7.724 | 1.623 | – 6.101 | 1.313.804 |
13.02.01 Beheer, onderhoud en vervanging | 1.324.516 | 1.319.905 | – 7.724 | 1.623 | – 6.101 | 1.313.804 |
13.03 Aanleg | 706.311 | 859.187 | 19.842 | 13.330 | 33.172 | 892.359 |
13.03.01 Real.progr.personenvervoer | 595.685 | 696.928 | 90.411 | 16.829 | 107.240 | 804.168 |
13.03.02 Real.progr.goederenvervoer | 51.061 | 64.992 | – 7.101 | 7.303 | 202 | 65.194 |
13.03.04 Verk. en planuitw.personenvervoer | 56.931 | 95.964 | – 60.373 | – 8.291 | – 68.664 | 27.300 |
13.03.05 Verk. en planuitw.goederenvervoer | 2.634 | 1.303 | – 3.095 | – 2.511 | – 5.606 | – 4.303 |
13.04 Geintegreerde contractvormen/PPS | 148.776 | 140.193 | 0 | – 3.390 | – 3.390 | 136.803 |
13.07 Rente en aflossing | 18.150 | 48.397 | 0 | 0 | 0 | 48.397 |
13.08 Investeringsruimte | 0 | 23 | – 23 | 0 | – 23 | 0 |
13.09 Ontvangsten | 60.000 | 172.581 | 51.742 | – 7.882 | 43.860 | 216.441 |
Operationele doelstelling 13.02
De voorgestelde mutatie op deze operationele doelstelling bestaat uit de volgende twee mutaties:
-
– Ter compensatie van een aanvullende beschikking ten opzichte van het ingediende Beheerplan, wordt € 10 mln. geleend uit operationele doelstelling 13.04 waar sprake is van een tijdelijk overschot vanwege het doorschuiven van de betaling van de zogenoemde «tax adjustments» (aanpassingen van de beschikbaarheidsvergoeding in verband met belastingwijzigingen);
-
– Op deze operationele doelstelling staan de nog resterende middelen voor het Actieplan groei op het spoor gereserveerd. De realisatie daarvan vindt echter plaats ten laste van begrotingsartikel 16 in de begroting van IenM (hoofdstuk XII). De nu over te hevelen circa € 8,4 mln. is ter dekking van de lopende verplichtingen voor dat project op die begroting.
Operationele doelstelling 13.03
Realisatieprogramma Personenvervoer (13.03.01) | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
Projectomschrijving | huidig | vorig | huidig | vorig | huidig | vorig | |
Projecten nationaal | |||||||
Benutten | |||||||
ERTMS-pilot Amsterdam-Utrecht en ERTMS expertisecentrum 1) | 6 | 16 | 39 | 39 | 2012/2013/2014 | 2012/2013/2014 | 1 |
Geluidsanering Spoorwegen | 1 | 1 | 626 | 626 | divers | divers | |
Uitvoeringsprogramma geluid emplacementen (UPGE) | 8 | 8 | 29 | 29 | divers | divers | |
Programma Hoogfrequent Spoorvervoer | |||||||
PHS DSSU (inclusief voorinvestering) | 49 | 33 | 278 | 278 | 2012/2015 | 2012/2015 | 2 |
Vervanging Dieze brug Den Bosch | 0 | 2 | 2 | 2 | 2014 | 2014 | 3 |
Stations en stationsaanpassingen | |||||||
Kleine stations | 6 | 6 | 78 | 78 | divers | divers | |
Overige projecten/programma's /lijndelen etc. | |||||||
AKI-plan en veiligheidsknelpunten | 12 | 13 | 397 | 397 | divers | divers | |
Fietsparkeren bij stations | 15 | 15 | 221 | 221 | divers | divers | |
Nazorg gereedgekomen lijnen/halten | 0 | 0 | 29 | 29 | divers | divers | |
Ontsnippering | 9 | 8 | 84 | 84 | divers | divers | |
Programma Kleine Functiewijzigingen | 49 | 40 | 589 | 589 | divers | divers | 4 |
Punctualiteits-/capaciteitsknelpunten | 77 | 77 | 319 | 319 | divers | divers | |
Reistijdverbetering | 8 | 6 | 12 | 12 | 2013 | 2013 | |
Toegankelijkheid stations | 46 | 44 | 503 | 503 | divers | divers | |
Projecten Noord-Holland, Utrecht en Flevoland | |||||||
Amsterdam-Almere-Lelystad | |||||||
OV SAAL korte termijn | 117 | 121 | 840 | 840 | 2016 | 2016 | |
Stations en stationsaanpassingen | |||||||
Amsterdam CS, Cuypershal | 9 | 5 | 38 | 38 | 2014/2015/2016 | 2014/2015/2016 | 5 |
Amsterdam CS, Fietsenstalling | 0 | 1 | 35 | 35 | 2013/2018 | 2013/2018 | 6 |
Overige projecten/lijndelen etc. | |||||||
Regionet (inclusief verkeersmaatregelen Schiphol) | 24 | 22 | 185 | 185 | divers | divers | |
Projecten Utrecht | |||||||
Vleuten – Geldermalsen 4/6 sporen (incl. RSS) | 57 | 57 | 956 | 956 | 2005 e.v. | 2005 e.v. | |
Stations en stationsaanpassingen | |||||||
OV-terminal stationsgebied Utrecht (VINEX/NSP) | 57 | 65 | 346 | 346 | 2016 | 2016 | 7 |
Overige projecten/lijndelen etc. | |||||||
Spoorwegovergang Soestdijkseweg te Bilthoven | 4 | 2 | 37 | 37 | 2013/2015 | 2013/2015 | 8 |
Projecten Zuidvleugel | |||||||
Stations en stationsaanpassingen | |||||||
Den Haag CS (t.b.v. NSP) | 33 | 23 | 117 | 117 | 2014 | 2014 | 9 |
Rotterdam Centraal (t.b.v. NSP) | 36 | 36 | 275 | 275 | 2013 | 2013 | |
Den Haag CS perronsporen 11 en 12 | 1 | 1 | 38 | 38 | 2018 | 2018 | |
Overige projecten/lijndelen etc. | |||||||
Rijswijk – Schiedam incl. spoorcorridor Delft | 87 | 76 | 538 | 538 | 2015/2017 | 2015/2017 | 10 |
Projecten Brabant | |||||||
Stations en stationsaanpassingen | |||||||
Breda Centraal (t.b.v. NSP) | 9 | 9 | 56 | 56 | 2016/2017 | 2016/2017 | |
Projecten Oost Nederland | |||||||
Utrecht-Arnhem-Zevenaar | |||||||
Arnhem Centraal (t.b.v. NSP) | 2 | 14 | 108 | 108 | 2011/2014 | 2011/2014 | 11 |
Sporen in Arnhem | 11 | 14 | 299 | 299 | 2011 | 2011 | 12 |
Traject Oost uitv. convenant DMB | 8 | 10 | 234 | 234 | 2020 | 2019 | 13 |
Overige projecten/lijndelen etc. | |||||||
Hanzelijn | 54 | 59 | 1.020 | 1.020 | 2012 | 2012 | 14 |
Regionale lijnen Gelderland | 2 | 2 | 14 | 14 | divers | divers | |
Projecten Noord Nederland | |||||||
Partiële spooruitbreiding Groningen-Leeuwarden | 3 | 2 | 5 | 5 | 15 | ||
Sporendriehoek Noord-Nederland | 4 | 6 | 194 | 194 | divers | divers | |
Totaal ProRail projecten | 804 | 795 | 8.540 | 8.540 | |||
Overige (niet ProRail) projecten | |||||||
Afdekking risico's spoorprogramma's | 29 | 29 | n.v.t. | n.v.t. | |||
Intensivering Spoor in steden (I) | 1 | 9 | 246 | 246 | 16 | ||
Spoorzone Ede | 42 | 42 | |||||
Totaal overige (niet ProRail) Projecten | 1 | 9 | 317 | 317 | |||
afronding | – 1 | – 1 | |||||
Programma Realisatie (IF 13.03.01) | 804 | 804 | 8.857 | 8.856 | |||
Budget Realisatie (IF 13.03.01) | 804 | 787 | 8.857 | 8.856 | |||
Overprogrammering (–) | 0 | – 17 |
-
1. De uitgaven voor de Pilot European Rail Traffic Management System (ERTMS) Amsterdam-Utrecht zijn op operationele doelstelling 13.03 in het Infrastructuurfonds geraamd, maar worden op de begroting van Hoofdstuk XII verantwoord. Ten opzichte van het beschikbare budget is een budgetoverheveling vanuit het Infrastructuurfonds naar begrotingsartikel 16 (Spoor) in de begroting van Hoofdstuk XII van € 10 mln. noodzakelijk op basis van de huidige prognose.
-
2. Een aantal voor dit jaar voorziene planningsrisico's, waarmee in de kasprognose rekening was gehouden zijn niet opgetreden waardoor de prognose voor 2013 hoger uitvalt
-
3. Op basis van een herziene raming wordt verwacht dat dit jaar nauwelijk uitgaven ten laste van dit project zullen plaatsvinden.
-
4. In de raming is ten onrechte uitgegaan van een aftrek op programmaniveau in verband met mogelijke planningsrisico's gedurende de uitvoering. Deze aftrek is niet meer nodig omdat planningsrisico's worden meegenomen over het totale aanlegprogramma (deze systematiek dateerde nog uit de tijd dat het project onderdeel was van het programma Beheer, onderhoud en vervanging).
-
5. De middentunnel westijde wordt mede op verzoek van de gemeente en NS versneld opgeleverd (eind 2013 in plaats van het 3e kwartaal 2014). Hierdoor worden de uitgaven in 2013 hoger dan in de begroting geraamd.
-
6. In de uitgavenplanning voor 2013 was rekening gehouden met het nog in 2013 afgeven van een realisatiebeschikking. Er blijkt echter meer tijd nodig om met de stakeholders tot een definitieve scopevaststelling te komen.
-
7. De lagere raming wordt met name verklaard doordat de financiele afwikkeling met de huurders van de commerciele ruimten langer duurt dan vooraf aangenomen
-
8. De in 2015 voorziene uitgaven voor de verwerving van onroerend goed zijn reeds in 2013 gerealiseerd.
-
9. De hogere uitgaven worden veroorzaakt door de versnelde oplevering van de OV-Terminal (van eind 2014 naar medio 2014).
-
10. In de kasraming voor 2013 is onvoldoende rekening gehouden met de financiele consequentes van ingeschatte risico's en afhandeling van geschillen (ondermeer met DSM).
-
11. De lagere raming van de uitgaven in 2013 wordt verklaard doordat er nog geen overeenstemming is tussen de aannemer en ProRail inzake een aantal claims. Daarnaast zijn de door de aannemer op te leveren dossiers nog niet op orde waardoor de financiele afwikkeling doorschuift naar 2014.
-
12. De lagere raming wordt met name veroorzaakt door het goedkoper uitvallen van geluidmaatregelen te Zwolle en de lagere uitgevallen voorlopige eindafrekening met betrekking tot de bouwkosten. Verder heeft de financiële afwikkeling van een aantal claims vertraging opgelopen doordat er geen consensus is over de rechtmatigheid en de hoogte van die claims.
-
13. Door stagnaties in de grondverwerving op het deelproject Bunnik (op een van de drie locaties is een onteigeningsprocedure gestart) ontstaat een kasoverschot van circa € 2 mln. Daarnaast is bij Driebergen-Zeist sprake van een scopewijziging in het project waardoor het bestemmingsplan een jaar later wordt verwacht en gronden later worden aangekocht.
-
14. Een aantal voor dit jaar geprognosticeerde werkzaamheden kan niet in 2013 worden afgewikkeld (door claims van de aannemer, installatiewerkzaamheden en werkzaamheden aan het plafond).
-
15. De hogere raming is noodzakelijk door het versneld uitvoeren van de werkzaamheden.
-
16. Als gevolg van de wetswijziging inzake verplicht schatkistbankieren (FIDO) zal de regelgeving spoorse doorsnijdingen moeten worden aangepast. Dit kan van invloed zijn op de uiteindelijke realisatie in 2013. Daarnaast is IenM voor de uitputting van het budget volledig afhankelijk van de gemeenten die, om voor vergoeding in aanmerking te komen, eerst een startverklaring moeten indienen.
Realisatieprogramma Goederenvervoer (13.03.02) | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
Projectomschrijving | huidig | vorig | huidig | vorig | huidig | vorig | |
ProRail Projecten | |||||||
Uitgaven mbt planuitwerking op IF 13.03.05 | 0 | – 1 | – 33 | – 33 | |||
Projecten nationaal | |||||||
PAGE risico reductie | 0 | 1 | 18 | 18 | divers | divers | 1 |
Optimalisering Goederencorridor Rotterdam-Genua | 16 | 21 | 170 | 170 | 2013e.v. | 2013e.v. | 2 |
Aslasten Cluster III realisatie | 0 | 0 | 1 | 1 | |||
Projecten Oost Nederland | |||||||
Uitv.progr Goederenroute Elst-Deventer-Twente (NaNov) | 4 | 4 | 154 | 154 | divers | divers | |
Projecten Zuidwestelijke delta | |||||||
Geluidmaatregelen Zeeuwselijn | 1 | 1 | 27 | 27 | 2014/2016 | 2014/2016 | |
Spooraansluiting 2e Maasvlakte achterlandverbinding | 44 | 40 | 217 | 217 | 2014 e.v. | 2014 e.v. | 3 |
Overige projecten | |||||||
Nazorg gereedgekomen projecten | 0 | 2 | 4 | 4 | divers | divers | 4 |
Totaal ProRail Projecten | 65 | 67 | 557 | 557 | |||
Overige (niet ProRail) Projecten | |||||||
Programma Realisatie (IF 13.03.02) | 65 | 67 | 557 | 557 | |||
Budget Realisatie (IF 13.03.02) | 65 | 59 | 557 | 557 | |||
Overprogrammering (–) | 0 | – 8 |
-
1. Het opstellen van de overeenkomst met Groningen Seapoorts (onder andere het regelen van het recht van overpas) duurt langer dan verwacht. Deze overeenkomst is een voorwaarde om te kunnen starten met de werkzaamheden. De huidige verwachting is dat de overeenkomst nog wel dit jaar wordt gesloten. De vertraagde start van de uitvoering heeft overigens geen consequenties voor het treinverkeer.
-
2. De neerwaartse bijstelling van de geraamde uitgaven voor 2013 wordt voornamelijk verklaard door een gunstig aanbestedingsresultaat voor ERTMS. Tevens is als gevolg van het nog niet voldoende gespecificeerd zijn van de gewenste activiteiten een deel van de geplande werkzaamheden niet aanbesteed en wordt dit doorgeschoven naar 2014.
-
3. De hogere raming wordt verklaard door een voorspoedige voortgang van de werkzaamheden (het niet optreden van ingeschatte risico's) en een snellere afwikkeling van de financiele termijnen als gevolg van een andere contractvorm dan eerder aangenomen.
-
4. Op basis van een prognose gebaseerd op cijfers over het tweede kwartaal worden dit jaar slechts in beperkte mate uitgaven gerealiseerd.
Planuitwerkingsprogr. Personenvervoer (13.03.04) | Budget | Openstelling | Toelichting | ||
---|---|---|---|---|---|
Projectomschrijving | Huidig | Vorig | Huidig | Vorig | |
Verplicht | |||||
Planuitwerkingskosten op realisatieprogramma IF 13.03.01 | 0 | 0 | nvt | nvt | |
Projecten Nationaal | |||||
Kleine projecten Personenvervoer | 5 | 5 | nvt | nvt | |
Reservering opbouw compensatie NS | 152 | 152 | nvt | nvt | |
Projecten Noord-Holland, Utrecht en Flevoland | |||||
Adam Zuidas station (NSP) | 235 | 235 | 2026 | 2026 | |
Adam Zuidas WTC/4-sp | 119 | 119 | 2026 | 2026 | |
Projecten Oost-Nederland | |||||
Quick scan decentraal spoor Gelderland | 18 | 18 | 2014–2018 | 2014–2018 | |
Traject Oost (Conv.DMB) | gereed | gereed | |||
Lenteakkoordimpuls voor 4 spoorlijnen Oost-Nederland | 25 | 25 | 2014–2017 | 2014–2017 | |
Gebonden | |||||
Projecten Nationaal | |||||
Grensoverschr. Spoorvervoer | 29 | 29 | div. | div. | |
Beter Benutten Decentraal Spoor (Decentraal Spoor, fase 2 (NMCA)) | 92 | 92 | div. | div. | |
Grensoverschr. Spoorvervoer, fase 2 | 43 | 43 | 2014–2018 | 2014–2018 | |
Progr.Hoogfreq.Spoor (PHS) | 1.334 | 1.334 | div. | div. | |
Reservering Businesscase NSP | 12 | 12 | nvt | nvt | |
Programma overwegen | 200 | 200 | div. | div. | |
Projecten Noordwest-Nederland | |||||
OV Schiphol-Amsterdam-Almere-Lelystad | 638 | 638 | 2021 | 2021 | |
Bestemd | 2.174 | 2.174 | |||
Projecten in voorbereding | |||||
Projecten Nationaal | |||||
– ERTMS | |||||
Overige projecten in voorbereiding | |||||
Gesignaleerde risico's | |||||
Totaal planuitwerkingsprogramma | 5.076 | 5.076 | |||
Begroting (IF 13.03.04) | 5.076 | 5.076 |
Planuitwerkingsprogr. Goederenvervoer(13.03.05) | Budget | Openstelling | Toelichting | ||
---|---|---|---|---|---|
Projectomschrijving | Huidig | Vorig | Huidig | Vorig | |
Verplicht | |||||
Planuitwerkingskosten op realisatieprogramma IF 13.03.02 | 17 | 17 | |||
Gebonden | |||||
Projecten Nationaal | |||||
Aslastencluster III | 11 | 11 | nvt | nvt | |
Europese ERTMS verbindingen | 6 | 6 | nvt | nvt | |
Projecten Zuidvleugel | |||||
Kleine project Goed | 5 | 5 | nvt | nvt | |
Calandbrug | 157 | 157 | 2019 | 2019 | |
Bestemd | 6 | 6 | |||
Projecten in voorbereiding | |||||
Overige projecten in voorbereiding | |||||
Gesignaleerde Risico's | |||||
Totaal planuitwerkingsprogramma | 202 | 202 | |||
Begroting (IF 13.03.05) | 202 | 202 |
Operationele doelstelling 13.04
Op deze operationele doelstelling is sprake van een tijdelijk overschot vanwege het doorschuiven van de betaling van de zogenoemde «tax adjustments» (aanpassingen van de beschikbaarheidsvergoeding in verband met belastingwijzigingen). Hierdoor kan € 10 mln. aan artikel 13.02 worden geleend ter compensatie van een aanvullende beschikking op die operationele doelstelling.
Tussen eind 2012 en medio 2013 is de zogenoemde Pilot Geluid Lansinglerland (HSL-Zuid, fase 1) uitgevoerd. De kosten hiervoor bedragen € 6,6 mln. en zijn gebudgetteerd op operationele doelstelling 17.03. De uitvoering is opgedragen aan Infraspeed, waarbij ervoor gekozen is om dit binnen het lopende «performance»-contract te doen. De betalingen op dit contract vinden echter plaats ten laste van operationele doelstelling 13.04. Het beschikbare budget wordt daarom overgeheveld van operationele doelstelling 17.03 naar 13.04.
Verplichtingen
Naar aanleiding van een van de aanbevelingen van de Tijdelijke Commissie Onderhoud en Innovatie Spoor om de aansturing van ProRail minder diffuus te maken zijn, met ingang van de begroting 2013 de geoormerkte projecten van beheer- en instandhouding ondergebracht bij het aanlegprogramma personenvervoer omdat deze projecten naar hun aard meer overeenkomsten vertonen met aanlegprojecten dan met beheer en instandhoudingsprojecten.
Binnen Beheer onderhoud en vervanging werd voor deze programma’s jaarlijks een subsidiebeschikking afgegeven. Na het onderbrengen binnen het aanlegprogramma zou voor deze programma’s in 2013, net als voor de overige aanlegprojecten een meerjarige subsidiebeschikking worden verstrekt. In de verplichtingenraming voor 2013 was hiermee rekening gehouden. Naar aanleiding van de financiële taakstellingen uit het regeerakkoord en de onzekerheid die dit met zich meebracht qua doorvertaling naar de projecten en programma’s, is besloten om voor de programma’s Toegankelijkheid, Fietsparkeren bij stations, Kleine functiewijzigingen en Punctualiteits- en capaciteitsknelpunten vooralsnog voor een kortere periode financiële verplichtingen vast te leggen dan eerder aangenomen. In 2014 zouden dan aanvullende subsidiebeschikkingen worden verstrekt.
Voorts is op een aantal projecten een aanpassing van de raming aangebracht om de verplichtingenreeks aan te laten sluiten bij de uitgavenramingen.
Ontvangsten
Van de geprognosticeerde ontvangsten voor 2013 met betrekking tot afrekeningen en doorbelastingen van MIRT-projecten wordt naar verwachting € 10 mln. doorgeschoven naar 2014.
Anderzijds wordt circa € 2 mln. geraamd in verband met afrekeningen met ProRail van aanlegprojecten (inleveringen op basis van de wijzigingsbeschikking 2013).
Artikel 13 Spoorwegen | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 13.02 Beheer, onderh.& verv. | 1.324.516 | 1.236.385 | 1.236.800 | 1.111.748 | 1.210.582 | 1.221.869 | 1.130.098 | 1.284.238 | 1.167.164 | 1.166.485 | 1.166.549 | 1.185.095 | 1.120.779 | 1.175.779 | 1.175.779 | 1.175.779 | |||
Mutaties voorjaarsnota 2013 | – 4.611 | 13.850 | – 11.348 | 24.486 | 20.717 | 84.117 | 3.611 | – 7.251 | 9.125 | 5.322 | – 6.978 | 29.251 | 86.246 | 41.896 | 43.085 | 2.344 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.02 Beheer, onderh.& verv. | 1.319.905 | 1.250.235 | 1.225.452 | 1.136.234 | 1.231.299 | 1.305.986 | 1.133.709 | 1.276.987 | 1.176.289 | 1.171.807 | 1.159.571 | 1.214.346 | 1.207.025 | 1.217.675 | 1.218.864 | 1.178.123 | |||
Indexering 2013 | Intens./extens. | 294.906 | 20.524 | 20.531 | 18.455 | 20.096 | 20.283 | 18.760 | 21.318 | 19.375 | 19.364 | 19.365 | 19.673 | 18.605 | 19.519 | 19.519 | 19.519 | 2 | |
Loonbijstelling 2013 | Intens./extens. | 11.626 | 927 | 768 | 762 | 608 | 740 | 711 | 711 | 711 | 711 | 711 | 711 | 711 | 711 | 711 | 711 | 711 | 14 |
Desaldering spoorwegen | desaldering | – 76.148 | – 8.651 | – 7.499 | – 7.499 | – 7.499 | – 7.500 | – 7.500 | – 7.500 | – 7.500 | – 7.500 | – 7.500 | 16 | ||||||
Mutaties Miljoenennota 2014 | – 7.724 | 13.793 | 13.794 | 11.564 | 13.336 | 13.494 | 11.971 | 14.529 | 12.586 | 12.575 | 20.076 | 20.384 | 19.316 | 20.230 | 20.230 | 20.230 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 13.02 Beheer, onderh.& verv. | 1.312.181 | 1.264.028 | 1.239.246 | 1.147.798 | 1.244.635 | 1.319.480 | 1.145.680 | 1.291.516 | 1.188.875 | 1.184.382 | 1.179.647 | 1.234.730 | 1.226.341 | 1.237.905 | 1.239.094 | 1.198.353 | |||
Saldo 2013 | Intertemporeel | 0 | 10.000 | – 10.000 | a | ||||||||||||||
Overboeking HXII – IF artikel 13 | Intens./extens. | – 8.377 | – 8.377 | e | |||||||||||||||
Mutaties Najaarsnota 2013 | 1.623 | – 10.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 13.02 Beheer, onderh.& verv. | 1.313.804 | 1.254.028 | 1.239.246 | 1.147.798 | 1.244.635 | 1.319.480 | 1.145.680 | 1.291.516 | 1.188.875 | 1.184.382 | 1.179.647 | 1.234.730 | 1.226.341 | 1.237.905 | 1.239.094 | 1.198.353 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.03 Aanleg | 706.311 | 986.382 | 1.181.055 | 1.172.551 | 1.181.262 | 1.103.173 | 820.467 | 566.848 | 417.524 | 172.254 | 277.088 | 283.293 | 138.877 | 116.739 | 114.339 | 127.934 | |||
Mutaties voorjaarsnota 2013 | 152.876 | – 3.981 | – 46.463 | – 82.113 | – 116.641 | – 145.816 | 2.935 | 20.601 | – 22.614 | 125.638 | 220.841 | 188.542 | 323.288 | 392.716 | 348.322 | 279.318 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.03 Aanleg | 859.187 | 982.401 | 1.134.592 | 1.090.438 | 1.064.621 | 957.357 | 823.402 | 587.449 | 394.910 | 297.892 | 497.929 | 471.835 | 462.165 | 509.455 | 462.661 | 407.252 | |||
Overboeking binnen Infrastructuurfonds | Intens./extens. | – 13.074 | – 38.074 | 7.000 | 18.000 | 5 | |||||||||||||
Overboeking binnen artikel 13 | neutraal | – 66.404 | 6.322 | 5.000 | 15.821 | 70.000 | 62.000 | 240 | 651 | – 226.438 | 8 | ||||||||
Overboeking HXII – IF artikel 13 | Intens./extens. | – 11.400 | – 2.500 | – 2.900 | – 6.000 | 9 | |||||||||||||
Desaldering spoorwegen | desaldering | 62.712 | 54.094 | 612 | 306 | 800 | 800 | 1.070 | 1.070 | 2.140 | 1.820 | 16 | |||||||
Overboeking binnen artikel 13 | neutraal | 6 | 0 | 1 | 0 | 3 | – 1 | 1 | 1 | 7.865 | 1.741 | – 253 | 92 | – 9.444 | 17 | ||||
Mutaties Miljoenennota 2014 | 19.842 | – 2.287 | 6.306 | 33.824 | 70.799 | 62.800 | 1.071 | 1.310 | 2.792 | 1.820 | 0 | 7.865 | 1.741 | – 253 | 92 | – 235.882 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 13.03 Aanleg | 879.029 | 980.114 | 1.140.898 | 1.124.262 | 1.135.420 | 1.020.157 | 824.473 | 588.759 | 397.702 | 299.712 | 497.929 | 479.700 | 463.906 | 509.202 | 462.753 | 171.370 | |||
Saldo 2013 | Intertemporeel | 0 | 17.740 | – 17.740 | a | ||||||||||||||
Projecten Nazorg/Prorail | desaldering | 2.118 | 2.118 | c | |||||||||||||||
Overboeking HXII – IF artikel 13 | Intens./extens. | – 10.000 | – 10.000 | e | |||||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | 3.472 | 3.472 | i | |||||||||||||||
Mutaties Najaarsnota 2013 | 13.330 | – 17.740 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 13.03 Aanleg | 892.359 | 962.374 | 1.140.898 | 1.124.262 | 1.135.420 | 1.020.157 | 824.473 | 588.759 | 397.702 | 299.712 | 497.929 | 479.700 | 463.906 | 509.202 | 462.753 | 171.370 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.04 GIV/PPS | 148.776 | 148.040 | 148.099 | 148.580 | 148.790 | 149.422 | 152.578 | 161.354 | 162.228 | 163.666 | 164.985 | 166.604 | 167.547 | 168.015 | 166.165 | 150.047 | |||
Mutaties voorjaarsnota 2013 | – 8.583 | – 2.452 | 15.497 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2.449 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.04 GIV/PPS | 140.193 | 145.588 | 163.596 | 148.580 | 148.790 | 149.422 | 152.578 | 161.354 | 162.228 | 163.666 | 164.985 | 166.604 | 167.547 | 168.015 | 166.165 | 152.496 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | , | ||
Stand ontwerpbegroting 2014 artikelonderdeel 13.04 GIV/PPS | 140.193 | 145.588 | 163.596 | 148.580 | 148.790 | 149.422 | 152.578 | 161.354 | 162.228 | 163.666 | 164.985 | 166.604 | 167.547 | 168.015 | 166.165 | 152.496 | |||
Saldo 2013 | Intertemporeel | 0 | – 10.000 | 10.000 | a | ||||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | 6.610 | 6.610 | i | |||||||||||||||
Mutaties Najaarsnota 2013 | – 3.390 | 10.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 13.04 GIV/PPS | 136.803 | 155.588 | 163.596 | 148.580 | 148.790 | 149.422 | 152.578 | 161.354 | 162.228 | 163.666 | 164.985 | 166.604 | 167.547 | 168.015 | 166.165 | 152.496 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.07 Rente & afl. | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | 18.150 | |||
Mutaties voorjaarsnota 2013 | 30.247 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | – 1.553 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.07 Rente & afl. | 48.397 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 13.07 Rente & afl. | 48.397 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 13.07 Rente & afl. | 48.397 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | 16.597 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.08 Investeringsruimte | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 23 | 10.000 | 20.000 | 40.000 | 80.000 | 62.000 | 25.000 | 25.241 | 52.655 | 50.500 | 52.000 | 126.552 | 98.528 | 69.035 | 141.127 | 323.515 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.08 Investeringsruimte | 23 | 10.000 | 20.000 | 40.000 | 80.000 | 62.000 | 25.000 | 25.241 | 52.655 | 50.500 | 52.000 | 126.552 | 98.528 | 69.035 | 141.127 | 323.515 | |||
Indexering 2013 | Intens./extens. | – 294.906 | 0 | – 20.524 | – 20.531 | – 18.455 | – 20.096 | – 20.283 | – 18.760 | – 21.318 | – 19.375 | – 19.364 | – 19.365 | – 19.673 | – 18.605 | – 19.519 | – 19.519 | – 19.519 | 2 |
Overboeking binnen artikel 13 | neutraal | 66.408 | – 6.320 | – 4.998 | – 15.821 | – 70.000 | – 62.000 | – 240 | – 651 | 226.438 | 8 | ||||||||
Desaldering spoorwegen | desaldering | 92.266 | 6.299 | 2.137 | 5.983 | 5.983 | 5.568 | 5.894 | 5.847 | 6.063 | 5.203 | 5.637 | 7.567 | 7.585 | 5.625 | 5.625 | 5.625 | 5.625 | 16 |
Overboeking binnen artikel 13 | neutraal | – 6 | – 2 | – 1 | 2 | – 3 | 1 | – 1 | – 1 | – 7.865 | – 1.741 | 253 | – 92 | 9.444 | 17 | ||||
Mutaties Miljoenennota 2014 | – 23 | – 18.388 | – 19.544 | – 28.296 | – 84.527 | – 76.389 | – 12.914 | – 15.495 | – 14.824 | – 13.727 | – 11.798 | – 19.953 | – 14.721 | – 13.641 | – 13.986 | 221.988 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 13.08 Investeringsruimte | 0 | – 8.388 | 456 | 11.704 | – 4.527 | – 14.389 | 12.086 | 9.746 | 37.831 | 36.773 | 40.202 | 106.599 | 83.807 | 55.394 | 127.141 | 545.503 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 13.08 Investeringsruimte | 0 | – 8.388 | 456 | 11.704 | – 4.527 | – 14.389 | 12.086 | 9.746 | 37.831 | 36.773 | 40.202 | 106.599 | 83.807 | 55.394 | 127.141 | 545.503 | |||
Totaal uitgaven stand ontwerpbegroting 2013 Spoorwegen | 2.197.753 | 2.388.957 | 2.584.104 | 2.451.029 | 2.558.784 | 2.492.614 | 2.121.293 | 2.030.590 | 1.765.066 | 1.520.555 | 1.626.772 | 1.653.142 | 1.445.353 | 1.478.683 | 1.474.433 | 1.471.910 | |||
Totaal uitgaven stand eerste suppletoire wet 2013 Spoorwegen | 2.367.705 | 2.404.821 | 2.560.237 | 2.431.849 | 2.541.307 | 2.491.362 | 2.151.286 | 2.067.628 | 1.802.679 | 1.700.462 | 1.891.082 | 1.995.934 | 1.951.862 | 1.980.777 | 2.005.414 | 2.077.982 | |||
Totaal uitgaven stand Miljoenennota 2014 Spoorwegen | 2.379.800 | 2.397.939 | 2.560.793 | 2.448.941 | 2.540.915 | 2.491.267 | 2.151.414 | 2.067.972 | 1.803.233 | 1.701.130 | 1.899.360 | 2.004.230 | 1.958.198 | 1.987.113 | 2.011.750 | 2.084.318 | |||
Totaal uitgaven stand tweede suppletoire wet 2013 Spoorwegen | 2.391.363 | 2.380.199 | 2.560.793 | 2.448.941 | 2.540.915 | 2.491.267 | 2.151.414 | 2.067.972 | 1.803.233 | 1.701.130 | 1.899.360 | 2.004.230 | 1.958.198 | 1.987.113 | 2.011.750 | 2.084.318 | |||
Ontwerpbegroting 2013 artikelonderdeel 13.09 Ontvangsten spoorw. | 60.000 | 59.999 | 237.999 | 181.999 | 194.208 | 195.315 | 199.492 | 203.541 | 207.468 | 209.601 | 211.665 | 211.988 | 175.300 | 175.300 | 175.300 | 175.300 | |||
Mutaties voorjaarsnota 2013 | 112.581 | 10.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 13.09 Ontvangsten spoorw. | 172.581 | 69.999 | 237.999 | 181.999 | 194.208 | 195.315 | 199.492 | 203.541 | 207.468 | 209.601 | 211.665 | 211.988 | 175.300 | 175.300 | 175.300 | 175.300 | |||
Desaldering spoorwegen | desaldering | 78.830 | 51.742 | – 4.750 | – 1.210 | – 1.516 | – 1.132 | – 806 | – 583 | – 367 | – 157 | – 43 | 7.567 | 7.585 | 5.625 | 5.625 | 5.625 | 5.625 | 16 |
Mutaties Miljoenennota 2014 | 51.742 | – 4.750 | – 1.210 | – 1.516 | – 1.132 | – 806 | – 583 | – 367 | – 157 | – 43 | 7.567 | 7.585 | 5.625 | 5.625 | 5.625 | 5.625 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 13.09 Ontvangsten spoorw. | 224.323 | 65.249 | 236.789 | 180.483 | 193.076 | 194.509 | 198.909 | 203.174 | 207.311 | 209.558 | 219.232 | 219.573 | 180.925 | 180.925 | 180.925 | 180.925 | |||
Saldo 2013 | Intertemporeel | 0 | – 10.000 | 10.000 | a | ||||||||||||||
Projecten Nazorg/Prorail | desaldering | 2.118 | 2.118 | c | |||||||||||||||
Mutaties Najaarsnota 2013 | – 7.882 | 10.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 13.09 Ontvangsten spoorw. | 216.441 | 75.249 | 236.789 | 180.483 | 193.076 | 194.509 | 198.909 | 203.174 | 207.311 | 209.558 | 219.232 | 219.573 | 180.925 | 180.925 | 180.925 | 180.925 |
Artikel 13 Spoorwegen
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat het risico wordt geaccepteerd dat een kasoverschrijding van het Infrastructuurfonds optreedt van maximaal het minbedrag in het betreffende jaar. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
5. Deze mutatie betreft onderstaande verschuivingen over de diverse aanlegartikelen van het Infrastructuurfonds:
-
– Vanwege de verkenning seinoptimalisatie Amersfoort (als maatregel uit het regiopakket) wordt circa € 0,1 mln. overgeboekt vanuit artikel 12 (Beter Benutten) naar artikel 13 Spoorwegen;
-
– Een overboeking vanuit artikel 13 (Afdekking risico's spoorprogramma's) naar artikel 17 voor de financiering van de pilot geluidsmaatregelen Lansingerland. Dit in lijn met de voortgangsinformatie die eerder aan de Tweede Kamer is gezonden (Voortgangsrapportage 31 HSL);
-
– Voor de realisatie op het project Utrecht Uithof heeft de regio Utrecht al een aanzienlijk bedrag voorgefinancierd. IenM heeft eerder richting regio Utrecht aangegeven niet eerder dan in 2016 middelen beschikbaar te hebben om deze uitgaven te compenseren maar wel te zullen bezien of er mogelijkheden zijn om eerder tot betaling over te gaan. Die zijn er thans op artikel 13 Spoorwegen waar de AP (Aanvullende Post) gelden voor 2013 dit jaar nog niet tot betalingen leiden;
-
– Een overboeking uit artikel 13 PUV naar artikel 12 voor realisatiekosten die worden voorzien bij het project Zuidas;
-
– Afrekening Hollandse Brug OV SAAL-RRAAM: Met betrekking tot de Hollandse brug variant in relatie tot OV SAAL MT is afgesproken dat van het geraamde budget ad circa € 1,8 mln. OV SAAL 2/3 voor haar rekening neemt (Infrastructuurfonds begrotingsartikel 13) en RRAAM 1/3 (Infrastructuurfonds begrotingsartikel 18). De totale realisatie bedraagt uiteindelijk € 1,7 mln. Volgens de verdeelsleutel vindt een budgettaire compensatie plaats van afgerond € 495.000,– vanuit OV SAAL naar RRAAM.
-
-
8. Deze mutatie betreft onderstaande verschuivingen binnen artikel 13 Spoorwegen tussen aanleg en de overige artikelonderdelen;
-
– In het BO MIRT najaar 2012 is geconstateerd dat de Calandbrug in de Betuweroute/Havenspoorlijn zonder levensverlengende maatregelen rond 2020 aan het einde van haar levensduur is. Op 3 april 2013 hebben het Havenbedrijf Rotterdam en de Staat een overeenkomst ondertekend waarbij de Staat toezegt in mei een startbeslissing te nemen inzake een verkenning problematiek Calandspoorbrug. In deze overeenkomst heeft IenM zich gebonden aan grootschalige renovatie van de Calandspoorbrug voor 2019 ad € 157 mln.;
-
– De verwerking van de scope-uitbreiding PHS: dak 7e perron;
-
– De verwerking van de wijzigingsbeschikking 2013 met betrekking tot gereedgekomen lijnen/halte van lopende projecten;
-
– Een kasschuif tussen de artikelonderdelen 13.03 en 13.08 om de Investeringsruimte in 2013 naar latere jaren te plaatsen. Dit jaar worden daaruit geen uitgaven meer voorzien.
-
-
9. Uit deze operationele doelstelling worden de volgende overboekingen naar de begroting van HXII aangebracht voor:
-
– Gelden voor het onderzoek Roadmap ERTMS (€ 2,5 mln.);
-
– De BDU voor de verlenging Spoorlijn van Roodeschool naar Eemshaven (€ 2,9 mln.).
-
-
14. Dit is de toevoeging aan het Infrastructuurfonds van het uitgekeerde deel van de loonbijstelling 2013. Het betreft de hogere uitgaven voor de werkgever aan ouderdoms- en nabestaandenpensioen en een stijging van de bijdrage in het kader van de Zorgverzekeringswet.
-
16. Deze desaldering (uitgaven/ontvangsten) betreft:
-
– De verwerking van de Boete NS (€ 2,8 mln.);
-
– De reisinformatie is door ProRail overgedragen aan de NS. De reisinformatie wordt verankerd in de Vervoerconcessie en structureel verrekend met de concessievergoeding (€ 7,5 mln. per jaar);
-
– Indexering concessievergoeding naar prijspeil 2013 (circa € 6 mln. per jaar) naar het huidige prijspeilniveau;
-
– Een bijdrage van de provincie Gelderland aan het project Quick scan Decentraal Spoor Gelderland ad € 1,5 mln. voor het project «Vrijleggen treindienst Zutphen – Winterswijk te Zutphen».
-
-
17. Met deze kasschuif wordt zoveel mogelijk aangesloten bij de actuele inzichten in de programmering.
a, c, e en i.
Voor een toelichting op deze mutaties wordt verwezen naar het gestelde onder het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.
Artikel 14 Regionaal, lokale infrastructuur
14 Regionaal/lokale infra. | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Verplichtingen | 231.724 | 334.816 | – 28.181 | 556.463 | 528.282 | 863.098 |
Uitgaven | 135.983 | 131.498 | 25.000 | 89.814 | 114.814 | 246.312 |
Waarvan juridisch verplicht | 45% | |||||
14.01 Grote regionaal/lokale projecten | 60.771 | 61.310 | 24.999 | 866 | 25.865 | 87.175 |
14.01.02 Planuitw.progr.reg./lok | 8.135 | 13.389 | – 13.389 | 0 | – 13.389 | 0 |
14.01.03 Real.progr.reg./lok. | 52.636 | 47.921 | 39.058 | 197 | 39.255 | 87.176 |
14.01.04 Investeringsruimte | 0 | 0 | – 670 | 669 | – 1 | – 1 |
14.02 Regionale Mob. Fondsen | 30.257 | 26.603 | 0 | 19.771 | 19.771 | 46.374 |
14.03 RSP – ZZL: Pakket Bereikbaarheid | 44.955 | 43.585 | 1 | 69.177 | 69.178 | 112.763 |
14.03.01 RSP – ZZL: RB projecten | 29.049 | 26.654 | 0 | – 23.145 | – 23.145 | 3.509 |
14.03.02 RSP – ZZL: RB mob.fondsen | 0 | 253 | 1 | 109.000 | 109.001 | 109.254 |
14.03.03 RSP – ZZL: REP | 15.906 | 16.678 | 0 | – 16.678 | – 16.678 | 0 |
14.09 Ontvangsten | 0 | 600 | 0 | 0 | 0 | 600 |
Operationele doelstelling 14.01
Planuitwerkingsprogr. Reg./lokale infrastructuur (14.01.02) | Projectbudget | Openstelling | Toelichting | ||
---|---|---|---|---|---|
Projectomschrijving | huidig | vorig | huidig | vorig | |
Verplicht | |||||
Projecten Brabant | |||||
Verkeersruit Eindhoven (Noordoostcorridor) | 268 | 268 | 2019–2021 | 2019–2021 | |
Gebonden | |||||
Projecten Noord-Holland, Utrecht en Flevoland | |||||
Ombouw Amstelveenlijn (reservering) | 76 | 76 | 2020 | 2020 | |
Bestemd | 32 | 32 | |||
Projecten in voorbereiding | |||||
Projecten Noord-Holland, Utrecht en Flevoland | |||||
HOV Amstelveen | |||||
Projecten Zuidvleugel | |||||
BTW tramtunnel Den Haag | |||||
Overige projecten in voorbereiding | |||||
Gesignaleerde risico's | |||||
Afronding | |||||
Programma | 376 | 376 | |||
Begroting (IF 14.01.02) | 376 | 376 | |||
Overprogrammering (–) |
Realisatieprogramma | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
Reg.lok.infra (14.01.03) | huidig | vorig | huidig | vorig | huidig | vorig | |
Projecten Zuidvleugel | |||||||
Rotterdamsebaan | 300 | 300 | 2020–2022 | 2020–2022 | |||
A12/A20 Parallelstructuur Gouwe | 9 | 6 | 113 | 113 | 2019–2021 | 2019–2021 | 1 |
HOV netwerk Zuid-Holland Noord (voorheen | |||||||
Rijn-Gouwelijn) | 0 | 10 | 203 | 203 | 2018 | 2018 | 2 |
Randstadrail (incl. voorbereidingskosten | |||||||
en aanlanding RR op Den Haag HSE) | 5 | 2 | 890 | 890 | 2006–2016 | 2006–2016 | 3 |
A12/A20 Parallelstructuur Gouwe | |||||||
Projecten Noord-Holland, Utrecht en Flevoland | |||||||
Utrecht Trams naar De Uithof | 28 | 28 | 110 | 110 | 2018 | 2018 | |
N201 | 14 | 10 | 178 | 178 | 2014 | 2014 | 3 |
Noord/Zuidlijn | 28 | 24 | 1.182 | 1.182 | 2017 | 2017 | 3 |
Projecten Oost-Nederland | |||||||
Nijmegen 2e stadsbrug | 3 | 3 | 71 | 71 | 2013 | 2013 | |
Afronding | |||||||
Programma | 87 | 83 | 3.047 | 3.047 | |||
Begroting (IF 14.01.03) | 87 | 87 | 3.047 | 3.047 | |||
Overprogrammering (–) | 0 | 4 |
-
1. Aan het budget bij dit project wordt circa € 3 mln. toegevoegd om de gedeclareerde eerste 2 mijlpalen te kunnen betalen.
-
2. De aanpassing van de raming van het project HOV-NET Zuid-Holland Noord (vh Rijn-Gouwelijn) wordt met name veroorzaakt door een actuele planning.
-
3. In verband met de snellere voortgang van deze projecten is een aanpassing van het budget bij deze projecten noodzakelijk.
Hoofdproduct 14.01.04
Het opheffen van de minregel op de investeringsruimte door het niet uitkeren van de prijsbijstelling over 2013 kan worden aangebracht door een verschuiving met het jaar 2014 (ten laste van het voordelig saldo) aan te brengen.
Operationele doelstelling 14.02
Het Rijk staat voor een bedrag van € 24 mln. garant voor de Vlaamse bijdrage conform afspraak in Bestuurlijk overleg MIRT voorjaar 2009 (Bijlage bij Kamerstukken II, 2008/2009, 31 700 A, nr. 98). Vanuit de middelen voor gesignaleerde risico’s onder bestemd op operationale doelstelling 12.03 Aanleg wordt € 24 mln. overgeboekt naar operationele doelstelling 14.02 Regionale Mobiliteitsfondsen. Hiermee kan het gehele bedrag nog dit jaar worden overgemaakt aan de provincie Zeeland voor de realisatie van het project.
Verder wordt verwacht dat de provincie Zeeland alleen nog € 1,2 mln. indexering op zal vragen, waardoor circa € 4,2 mln. dit jaar niet zal worden besteed.
Operationele doelstelling 14.03
Projectoverzicht Regiospecifiek | Kasbudget 2013 | Projectbudget | Toelichting | ||
---|---|---|---|---|---|
Pakket Zuiderzeelijn (14.03) | huidig | vorig | huidig | vorig | |
Projecten Noord-Nederland | |||||
14.03.01 Concrete bereikbaarheidsprojecten | 4 | 27 | 542 | 546 | 1 |
14.03.02 Regionaal Mobiliteitsfonds | 109 | 0 | 537 | 537 | 2 |
14.03.03 Ruimtelijk economisch programma | 0 | 17 | 130 | 130 | 3 |
Afronding | |||||
Programma | 113 | 44 | 1.209 | 1.213 | |
Begroting (IF 14.03) | 113 | 48 | 1.209 | 1.213 | |
Overprogrammering (–) | 0 | 4 |
-
1. Uit deze operationele doelstelling wordt circa € 3,5 mln. overgeboekt naar operationele doelstelling 13.03 Aanleg voor de planuitwerkingskosten van het project Groningen-Leeuwarden.
Verder wordt verwacht dat € 20 mln. ten behoeve van concrete bereikbaarheidsprojecten dit jaar niet tot betalen zal komen.
-
2. Eind 2009 is het Regionale Mobiliteitsfonds RSP (RMf) opgericht als uitvloeisel van het RSP Convenant van 23 juni 2008. De belangrijkste afspraak hierbij is dat zodra de regio Noord Nederland stort, het rijk haar deel stort. Nu de regio voornemens is eind 2013 in een keer de tranches voor 2013 en 2104 te storten en de Najaarsnota 2013 het rijk alsnog de mogelijkheid biedt haar deel te storten, kan gesteld worden dat er sprake is van enkele maanden versnelling. Door dit nu in 1 keer te doen geeft dit voor zowel de regio als het rijk een behoorlijke besparing op administratieve lasten.
-
3. De beschikbare middelen voor het ruimtelijk economisch programma zullen dit jaar niet worden besteed en worden vooralsnog via het saldo aan de begroting van 2014 toegevoegd.
Verplichtingen
Enerzijds kan de verplichtingenraming met circa € 28 mln. neerwaarts worden bijgesteld als het gevolg van het corrigeren van de verplichtingenstand (met name voor het Experimenteerfonds) omdat hier geen uitgaven meer tegenover staan.
Anderzijds wordt op de verplichtingenramingen bij de projecten A12/A20 Parallelstructuur Gouwe, HOV-NET Zuid-Holland Noord (vh Rijn-Gouwelijn) en Rotterdamsebaan (vh.Trekvliettracé) een verhoging van de raming aangebracht met in totaal circa € 0,6 mlrd. teneinde de verplichtingenreeks aan te laten sluiten bij de uitgavenramingen.
Artikel 14 Regionaal/lokale infra. | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 14.01 Grote reg./lok.proj. | 60.771 | 104.830 | 99.343 | 44.156 | 235.601 | 218.604 | 116.825 | 39.129 | 143.539 | 143.500 | 143.506 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 539 | – 17.794 | – 26.055 | 102.501 | – 24.429 | – 15.385 | – 10.461 | – 9.280 | – 10.035 | 22.299 | 41.611 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.01 Grote reg./lok.proj. | 61.310 | 87.036 | 73.288 | 146.657 | 211.172 | 203.219 | 106.364 | 29.849 | 133.504 | 165.799 | 185.117 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | |||
Indexering 2013 | Intens./extens. | – 854 | – 1 | – 531 | – 74 | – 67 | – 45 | – 45 | – 70 | – 21 | 2 | ||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | – 3.733 | 25.000 | – 2.439 | – 8.294 | – 18.000 | 63.500 | – 63.500 | 5 | ||||||||||
Overboeking HXII – IF artikel 14 | Intens./extens. | – 7.262 | – 2.500 | – 4.762 | 11 | ||||||||||||||
Leenconstructie wegen-reg/lok. | Intens./extens. | 0 | 5.686 | 173.268 | 32.753 | – 24.581 | – 63.858 | – 49.203 | – 52.828 | – 21.237 | 24 | ||||||||
Mutaties Miljoenennota 2014 | 24.999 | – 5.470 | – 8.368 | – 22.829 | 63.455 | – 45 | 5.616 | 173.247 | – 30.747 | – 24.581 | – 63.858 | – 49.203 | – 52.828 | – 21.237 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 14.01 Grote reg./lok.proj. | 86.309 | 81.566 | 64.920 | 123.828 | 274.627 | 203.174 | 111.980 | 203.096 | 102.757 | 141.218 | 121.259 | 10.365 | 44.199 | 74.780 | 99.443 | 132.427 | |||
Saldo 2013 | Intertemporeel | 0 | – 1.444 | 1.444 | a | ||||||||||||||
Overboeking HXII – IF artikel 14 | Intens./extens. | 2.310 | 2.310 | f | |||||||||||||||
Mutaties Najaarsnota 2013 | 866 | 1.444 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 14.01 Grote reg./lok.proj. | 87.175 | 83.010 | 64.920 | 123.828 | 274.627 | 203.174 | 111.980 | 203.096 | 102.757 | 141.218 | 121.259 | 10.365 | 44.199 | 74.780 | 99.443 | 132.427 | |||
Ontwerpbegroting 2013 artikelonderdeel 14.02 Reg.Mob.fonds. | 30.257 | 12.750 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | – 3.654 | 242 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.02 Reg.Mob.fonds. | 26.603 | 12.992 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 14.02 Reg.Mob.fonds. | 26.603 | 12.992 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | – 4.229 | 4.229 | a | ||||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | 24.000 | 24.000 | i | |||||||||||||||
Mutaties Najaarsnota 2013 | 19.771 | 4.229 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 14.02 Reg.Mob.fonds. | 46.374 | 17.221 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 14.03 RSP/ZZL | 44.955 | 144.149 | 54.009 | 212.450 | 163.286 | 136.631 | 116.631 | 39.693 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | – 1.370 | 2.731 | 1.023 | 4.025 | 3.093 | 2.588 | 2.210 | 752 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.03 RSP/ZZL | 43.585 | 146.880 | 55.032 | 216.475 | 166.379 | 139.219 | 118.841 | 40.445 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Indexering 2013 | Intens./extens. | 854 | 1 | 531 | 74 | 67 | 45 | 45 | 70 | 21 | 2 | ||||||||
Mutaties Miljoenennota 2014 | 1 | 531 | 74 | 67 | 45 | 45 | 70 | 21 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 14.03 RSP/ZZL | 43.586 | 147.411 | 55.106 | 216.542 | 166.424 | 139.264 | 118.911 | 40.466 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | 72.649 | – 72.649 | a | ||||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | – 3.472 | – 3.472 | i | |||||||||||||||
Mutaties Najaarsnota 2013 | 69.177 | – 72.649 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 14.03 RSP/ZZL | 112.763 | 74.762 | 55.106 | 216.542 | 166.424 | 139.264 | 118.911 | 40.466 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Totaal uitgaven stand ontwerpbegroting 2013 Reg./Lok.infra. | 135.983 | 261.729 | 153.352 | 256.606 | 398.887 | 355.235 | 233.456 | 78.822 | 143.539 | 143.500 | 143.506 | 0 | 0 | 0 | 0 | 0 | |||
Totaal uitgaven stand eerste suppletoire wet 2013 Reg./Lok.infra. | 131.498 | 246.908 | 128.320 | 363.132 | 377.551 | 342.438 | 225.205 | 70.294 | 133.504 | 165.799 | 185.117 | 59.568 | 97.027 | 96.017 | 99.443 | 132.427 | |||
Totaal uitgaven stand Miljoenennota 2014 Reg./Lok.infra. | 156.498 | 241.969 | 120.026 | 340.370 | 441.051 | 342.438 | 230.891 | 243.562 | 102.757 | 141.218 | 121.259 | 10.365 | 44.199 | 74.780 | 99.443 | 132.427 | |||
Totaal uitgaven stand tweede suppletoire wet 2013 Reg./Lok.infra. | 246.312 | 174.993 | 120.026 | 340.370 | 441.051 | 342.438 | 230.891 | 243.562 | 102.757 | 141.218 | 121.259 | 10.365 | 44.199 | 74.780 | 99.443 | 132.427 | |||
Ontwerpbegroting 2013 artikelonderdeel 14.09 Ontvangsten | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 600 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 14.09 Ontvangsten Reg./lok.infra | 600 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 14.09 Ontvangsten Reg./lok.infra | 600 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 14.09 Reg./lok.infra | 600 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Artikel 14 Regionaal, lokale infrastructuur
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat het risico wordt geaccepteerd dat een kasoverschrijding van het Infrastructuurfonds optreedt van maximaal het minbedrag in het betreffende jaar. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
5. Deze mutatie betreft onderstaande verschuivingen over de diverse aanlegartikelen van het Infrastructuurfonds:
-
– De extra bijdrage voor de Rotterdamsebaan voor regionale/lokale infrastructuur (artikel 14) wordt via een kasschuif met het project A4 Delft – Schiedam op artikel 12 (uit het aanbestedingvoordeel) naar voren gehaald. De extra bijdrage wordt gedekt binnen het programmabudget op Regionale/lokale infrastructuur;
-
– Voor de realisatie van het project Utrecht Uithof heeft de regio Utrecht al een aanzienlijk bedrag voorgefinancierd. IenM heeft eerder richting regio Utrecht aangegeven niet eerder dan in 2016 middelen beschikbaar te hebben om deze uitgaven te compenseren maar wel te zullen bezien of er mogelijkheden zijn om eerder tot betaling over te gaan. Die zijn er thans op artikel 13 Spoorwegen waar de middelen uit het Begrotingsakkoord (Aanvullende Post OV) voor 2013 dit jaar nog niet tot betalingen leiden;
-
– Door een teruggave van middelen voor Anders Betalen voor Mobiliteit projecten (ABvM) wordt een overboeking tussen de artikelen 14 en 12 in het fonds aangebracht;
-
-
11. De BDU voor het jaar 2013 is in december 2012 vastgesteld. Daarin is overeenkomstig de gebruikelijke werkwijze een forfaitaire index opgenomen. Vanuit artikel 14 Regionaal/lokale infrastructuur wordt dekking geboden voor het niet uitkeren van de prijsindex en overgeboekt naar de begroting van HXII.
-
24. Met deze schuif worden de kasreeksen voor de wegenprojecten Rotterdamsebaan en Verkeersruit Eindhoven (NOC) op begrotingsartikel 14 aangesloten bij de actuele planning.
a, f en i.
Voor een toelichting op deze mutaties wordt verwezen naar het gestelde onder het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.
Artikel 15 Hoofdvaarwegennet
15 Hoofdvaarwegennet | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Verplichtingen | 893.076 | 1.114.418 | – 46.046 | – 217.708 | – 263.754 | 850.664 |
Uitgaven | 844.120 | 899.272 | – 2.752 | – 32.043 | – 34.795 | 864.477 |
Waarvan juridisch verplicht | 100% | |||||
15.01 Verkeersmanagement | 12.770 | 13.498 | 224 | 0 | 224 | 13.722 |
15.01.01 Basispakket verkeersmanagement | 12.770 | 13.498 | 224 | 0 | 224 | 13.722 |
15.02 Beheer, onderhoud en vervanging | 298.884 | 302.912 | 5.025 | – 9.426 | – 4.401 | 298.511 |
15.02.01 Beheer en onderhoud | 180.453 | 157.971 | 3.309 | 25.070 | 28.379 | 186.350 |
15.02.02 Servicepakket B&O hoofdvaarwegen | 0 | 0 | 0 | 0 | 0 | 0 |
15.02.04 Vervanging | 118.431 | 144.941 | 1.716 | – 34.496 | – 32.780 | 112.161 |
15.03 Aanleg | 284.743 | 331.210 | 142 | – 34.465 | – 34.323 | 296.887 |
15.03.01 Realisatie | 267.323 | 319.039 | 8.052 | – 34.215 | – 26.163 | 292.876 |
15.03.02 Verkenningen en planuitwerkingen | 17.420 | 12.171 | – 7.910 | – 250 | – 8.160 | 4.011 |
15.05 Verk. en planuitw. voor tracébesluit | 0 | 0 | 0 | 0 | 0 | 0 |
15.05.01 Verkenningen | 0 | 0 | 0 | 0 | 0 | 0 |
15.05.02 Planuitw.programma voor tracébesluit | 0 | 0 | 0 | 0 | 0 | 0 |
15.06 Netwerkgebonden kosten HVWN | 247.723 | 251.652 | 3.705 | 0 | 3.705 | 255.357 |
15.06.01 Apparaatskosten RWS | 235.672 | 238.759 | 3.632 | 0 | 3.632 | 242.391 |
15.06.02 Overige netwerkgebonden kosten | 12.051 | 12.893 | 73 | 0 | 73 | 12.966 |
15.07 Investeringsruimte | 0 | 0 | – 11.848 | 11.848 | 0 | 0 |
15.09 Ontvangsten | 30.036 | 39.210 | 0 | – 18.268 | – 18.268 | 20.942 |
Operationele doelstelling 15.02
Bij Najaarsnota 2012 is budget aan Vervanging en Renovatie toegevoegd in verband met de herstelkosten van de begin 2012 defect geraakte sluisdeur van sluiscomplex Eefde. Dit herstel is in 2012 gerealiseerd en voorgefinancierd door Beheer en Onderhoud (B&O). De definitieve herstelkosten bedragen bijna € 4,9 mln. Thans wordt voorgesteld om deze voorgefinancierde kosten terug te betalen aan B&O.
Eind 2011 is een convenant gesloten met de provincies Friesland en Groningen waarbij RWS de hoofdvaarweg Lemmer-Delfzijl in beheer en eigendom krijgt en de zijtakken bij de provincies blijven. Voor de afkoop van de zijtakken is aan de provincies destijds € 186 mln. betaald. Met betrekking tot het achterstallig onderhoud van het van Harinxmakanaal is in dit kader destijds afgesproken om hier de RINK/RIO systematiek toe te passen zodat het achterstallig onderhoud conform RWS normen kan worden berekend. RWS en de provincie Friesland hebben op basis van de uit deze systematiek voortkomende inspectieresultaten inmiddels een voorstel uitgewerkt. De totale omvang van het uitgewerkte voorstel ten behoeve van de afkoop van het achterstallig onderhoud bedraagt € 27,75 mln. waarvan reeds € 6 mln. is betaald in 2011 als onderdeel van de afkoop van de zijtakken. Het resterende te betalen deel aan de provincie Friesland bedraagt derhalve € 21,75 mln (exclusief € 3,26 mln. BTW).
De uitgaven voor de projecten Overdracht Brokx-nat en de Fries-Groningse kanalen blijven achter bij de in de begroting geraamde middelen. Hierdoor kan via het saldo circa € 1,6 mln. aan de begroting van 2014 worden toegevoegd.
Verder wordt een kasoverschot verwacht van circa € 16 mln., met name doordat het NoMo-AOV MOBZ project (Modernisering Objectbediening Zeeland) is vertraagd als gevolg van de grote complexiteit van het te implementeren systeem zelf, de vele raakvlakken met onder andere het areaal en beveiligingsaspecten en de kwaliteit van de opdrachtnemer.
Voor het RINK-programma binnen Zuid-Nederland zijn de begrotingsmiddelen voor 2013 te hoog geraamd; niet alle voor 2013 geplande maatregelen zijn uit te voeren in verband met het laagwaterseizoen; tevens is synergie gezocht met landelijke RINK-projecten en -contracten, waardoor de timing van deze projecten is veranderd.
Najaarsnotamutaties (Bedragen x EUR 1 mln.)
Realisatieprogramma Hoofdvaarwegen (15.03.01) | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
huidig | vorig | huidig | vorig | huidig | vorig | ||
Projecten Nationaal | |||||||
Quick Wins Binnenhavens | 1 | 1 | 81 | 81 | 2009–2015 | 2009–2015 | |
Dynamisch verkeersmanagement | 31 | 41 | 91 | 89 | 2014 | 2014 | 1 |
Subsidieprogr. Zeehaveninnovatieproj. voor Duurzaamheid (ZIP) | 2 | 2 | 5 | 5 | 2014 | 2014 | |
Walradarsystemen | 1 | 2 | 24 | 24 | divers | divers | |
Beter Benutten | 1 | 2 | 12 | 12 | |||
Projecten Noord-Holland, Utrecht en Flevoland | |||||||
Amsterdam – Rijnkanaal, verwijderen keersluis Zeeburg | 2 | 5 | 14 | 14 | 2015 | 2015 | 2 |
De Zaan (Wilhelminasluis) | 13 | 13 | 2015 | 2015 | |||
Walradar Noordzeekanaal | 3 | 4 | 26 | 26 | 2014 | 2014 | |
Lekkanaal, verbreding kanaalzijde en uitbreiding ligplaatsen | 17 | 17 | 2016 | 2016 | |||
Projecten Zuidvleugel | |||||||
Verbreding Maasgeul | 0 | 2 | 2 | – | – | ||
Projecten Brabant | |||||||
Wilhelminakanaal Tilburg | 6 | 6 | 79 | 79 | 2016 | 2016 | |
Zuid-Willemsvaart; Maas-Veghel | 131 | 131 | 452 | 452 | 2015 | 2015 | |
Zuid-Willemsvaart; vervanging sluizen 4, 5 en 6 | 54 | 54 | – | – | |||
Projecten Limburg | |||||||
Bouw 4e sluiskolk Ternaaien | 10 | 10 | 2015 | 2015 | |||
Maasroute, modernisering fase 2 | 80 | 74 | 648 | 648 | 2018 | 2018 | 3 |
Projecten Oost Nederland | |||||||
Vaarweg Meppel-Ramspol (keersluis Zwartsluis) Vaarweg Meppel-Ramspol (keersluis Zwartsluis) | 2 | 11 | 53 | 53 | 2016 | 2016 | 4 |
Projecten Noord-Nederland | |||||||
Vaarweg Lemmer – Delfzijl fase 1; verbetering tot klasse Va | 26 | 23 | 282 | 282 | 2017 | 2017 | 5 |
Verdieping vaarweg Harlingen-Kornwerderzand (Boontjes) | 2 | 1 | 4 | 4 | 2013 | 2013 | 6 |
Overige projecten | |||||||
Amendement ligplaatsen | 2 | 5 | 6 | 6 | divers | divers | 7 |
Kleine projecten | 92 | 92 | nvt | nvt | |||
Realisatieuitgaven op IF 15.03.01 mbt planuitwerkingsprojecten | 2 | 3 | |||||
Afronding | 1 | 2 | |||||
Programma | 293 | 313 | 1.965 | 1.963 | |||
Begroting (IF 15.03.01) | 293 | 327 | |||||
Overprogrammering (–) | 0 | 14 |
-
1. Een aantal projectonderdelen van het Dynamisch Verkeersmanagement is vertraagd omdat de besluitvorming meer tijd vergt dan voorzien. Anderzijds wordt in 2013 € 1,5 mln. overgeboekt vanuit de Douane naar RWS. Dit ten behoeve van de samenwerking tussen de Douane en RWS waarbij wordt gewerkt aan de bouw van een Maritiem Single Window ter implementatie van de Richtlijn 2010/65/EU. In deze samenwerking zal RWS voor de implementatie een trekkende rol hebben op het gebied van projectmanagement, globaal ontwerp en gewenste functionaliteit en zal de Douane het functioneel en technisch ontwerp en de ICT systeemrealisatie van het Maritiem Single Window (MSW) voor haar rekening nemen. Omdat het budget dit jaar niet tot betaling komt wordt voorgesteld dit budget door te schuiven naar 2014.
-
2. Binnen dit project is sprake van een aanbestedingsmeevaller; voor de geplande uitgaven in dit uitvoeringsjaar leidt dit tot een budgetverlaging van € 3 mln. Omdat het project nog in uitvoering is blijft de aanbestedingsmeevaller binnen het project beschikbaar en wordt via het saldo doorgeboekt naar 2014.
-
3. Om te komen tot een zo volledig mogelijke besteding van de ter beschikking zijnde middelen binnen het realisatieprogramma vaarwegen, is een aantal Maasroute-werken versneld in uitvoering genomen. Hiermee is een bedrag van € 6 mln. gemoeid.
-
4. De daadwerkelijke start van de uitvoering van dit project is uitgesteld omdat de voorbereiding van de uitvoering meer tijd vergt dan voorzien. Dit leidt tot een verlaging van de geplande uitgaven met circa € 9,4 mln. in dit uitvoeringsjaar met doorwerking naar later.
-
5. Doordat de realisatie van in uitvoering zijnde deelprojecten bij de provincie achterloopt bij de planning, is bezien in welke mate het voor 2013 beschikbare budget kan worden beschikt. In overleg met de provincie heeft dit geleid tot versnelling van de uitvoering van een aantal deelprojecten, waardoor circa € 3,7 mln. aan het budget moet worden toegevoegd.
-
6. Er is overgegaan tot uitvoering van fase2 met betrekking tot het baggeren en verleggen van kabels en leidingen; deze werkzaamheden komen naar verwachting nog dit jaar gereed. Voor de financiering hiervan wordt € 1 mln. aan het budget toegevoegd.
-
7. De start van de uitbreiding van de ligplaatsen voor schepen met gevaarlijke stoffen op het Amsterdam-Rijnkanaal bij de plofsluis is vertraagd van september 2013 naar begin 2014. Daarnaast is nog niet het volledige programma opgedragen. Een en ander heeft tot gevolg dat circa € 3,9 mln. dit jaar niet zal worden besteed.
Verkenningen en planuitwerkingen (15.03.02) | Budget | Openstelling | Toelichting | ||
---|---|---|---|---|---|
Projectomschrijving | Huidig | Vorig | Huidig | Vorig | |
Verplicht | |||||
Realisatieuitgaven op IF 15.03.01 mbt planuitwerkingsprojecten | – 21 | – 21 | nvt | nvt | |
Projecten Noord-Holland, Utrecht en Flevoland | |||||
Zeetoegang IJmond | 594 | 594 | 2019 | 2019 | |
Lekkanaal/3e kolk Beatrixsluis | 216 | 216 | 2020 | 2020 | |
Projecten Zuidwestelijke Delta | |||||
Grote zeesluis in het kanaal Gent-Terneuzen | 174 | 174 | nnb | nnb | |
Max. bijdrage aan Vlaanderen kanaalaanpassingen t.b.v. Zeesluis | 155 | 155 | nvt | nvt | |
Projecten Limburg | |||||
Maasroute, moderinisering fase 2, verbreding Julianakanaal | 32 | 32 | 2018 | 2018 | |
Projecten Noord-Nederland | |||||
Vaarweg Lemmer-Delfzijl fase 2 | 102 | 102 | 2023 | 2023 | |
Verruiming vaarweg Eemshaven-Noordzee | 42 | 42 | 2017 | 2017 | |
Gebonden | |||||
Projecten Noord-Holland, Utrecht en Flevoland | |||||
Capaciteitsuitbreiding ligplaatsen Amsterdam-Lemmer | 6 | 6 | 2025–2027 | 2025–2027 | |
Lichteren buitenhaven IJmuiden | 65 | 65 | 2017 | 2017 | |
Vaarweg IJsselmeer-Meppel | 36 | 36 | 2023 | 2023 | |
Projecten Zuidvleugel | |||||
Capaciteitsuitbreiding ligplaatsen Beneden-Lek | 3 | 3 | 2016 | 2016 | |
Capaciteitsuitbreiding overnachtingplaatsen Merwedes | 29 | 29 | 2017 | 2017 | |
Verkeerssituatie splitsing Hollandsch Diep-Dordtsche Kil | 10 | 10 | 2025–2027 | 2025–2027 | |
Projecten Zuidwestelijke Delta | |||||
Capaciteit Volkeraksluizen | 157 | 157 | 2024–2026 | 2024–2026 | |
Projecten Oost-Nederland | |||||
Bovenloop IJssel (IJsselkop tot Zutphen) | 36 | 36 | 2026–2028 | 2026–2028 | |
Capaciteitsuitbreiding ligplaatsen IJssel | 28 | 28 | 2018–2020 | 2018–2020 | |
Toekomstvisie Waal | 131 | 131 | 2019=2021 | 2019=2021 | |
Verruiming Twentekanalen fase 2 | 27 | 27 | 2018–2020 | 2018–2020 | |
Capaciteitsuitbreiding sluis Eefde | 72 | 72 | 2018–2020 | 2018–2020 | |
Projecten Nationaal | |||||
Bijdrage aan agentschap tbv planuitwerkingen | 67 | 67 | nvt | nvt | |
Bestemd | 343 | 343 | |||
Projecten in voorbereiding | |||||
Projecten Zuidwestelijke Delta | |||||
– Kreekraksluizen | 2026–2028 | 2026–2028 | |||
– Capaciteitsuitbreiding ligplaatsen Rijn-Scheldeverbinding | 2015 | 2015 | |||
Projecten Noord-Nederland | |||||
– Capaciteitsuitbreiding ligplaatsen Lemmer-Delfzijl | 2025–2027 | 2025–2027 | |||
Projecten Oost-Nederland | |||||
– IJssel, fase 2 | 2028 | 2028 | |||
Overige projecten | |||||
– Beheer, Onderhoud en Vervanging nieuwe aanleg (LCC) | |||||
Gesignaleerde risico's | |||||
Afrondingsverschillen | – 1 | – 1 | |||
Programma | 2.303 | 2.303 | |||
Begroting (IF 15.03.02) | 2.303 | 2.303 |
Operationele doelstelling 15.07
Het opheffen van de minregel op de investeringsruimte door het niet uitkeren van de prijsbijstelling over 2013 kan worden aangebracht door de diverse kasvertragingen op de overige artikelonderdelen onder dit artikel.
Verplichtingen
De neerwaartse bijstelling van de verplichtingenraming staat voor een deel in relatie tot de hierboven genoemde mutaties op de uitgavenramingen.
Daarnaast worden nog enkele verschuivingen in de projectramingen uit/naar 2013 aangebracht voornamelijk door bijstellingen van de uitvoeringsplanning. Dit doet zich voornamelijk voor op de projecten:
-
– Fries-Groningse kanalen, Zuid-Willemsvaart, omleggen en opwaarderen (Maas-Veghel), Beter Benutten, Vaarweg Lemmer-Delfzijl fase 1: verbetering tot klasse Va en Dynamische verkeersmanagement vaarwegen. Wat betreft het laatst genoemde project is een aantal projectonderdelen vertraagd omdat de besluitvorming meer tijd vergt dan voorzien.
Verder is de raming van het project – Maasroute fase 2, realisatie aangepast wat met name het gevolg is van een lagere gunning met betrekking tot de verruiming van het Julianakanaal en het doorschuiven van verplichtingenbudget ten behoeve van de sluis Limmel.
Voorts is op de projecten Lekkanaal/3e kolk Beatrixsluis, Vaarweg Lemmer-Delfzijl (fase 2) en Lichteren buitenhaven IJmuiden de verplichtingenramingen aangesloten bij de uitgavenramingen.
Tot slot is de zogenoemde Min-regel begrotingsakoord afgeboekt waardoor tevens de verplichtingenstand is gecorrigeerd omdat hier geen uitgaven tegenover staan.
Ontvangsten
De verwachting is dat circa € 18,2 mln. van de ontvangstenraming dit jaar niet zal worden gerealiseerd.
Dit bedrag, wat een saldering is van hogere en lagere ontvangsten, doet zich voor op de volgende projecten:
-
– Zuid WIllemsvaart, Maas-Berlicum: een deel (€ 3,2 mln.) van de geraamde ontvangsten van de gemeente Den Bosch met betrekking tot dit project schuift via het voordelig saldo door naar 2014;
-
– Maasroute fase 2, realisatie: in 2012 is een audit uitgevoerd door het ECA (European Court of Auditors). Naar aanleiding hiervan heeft het TEN-agentschap kort geleden om aanvullende informatie gevraagd en in afwachting van de ontvangst van die informatie de TEN subsidie aangehouden. De subsidie van circa € 2,1 mln. zal derhalve niet meer in dit jaar worden gerealiseerd;
-
– Walradar Noordzeekanaal: Een deel van de geplande werkzaamheden verschuift naar 2014; analoog daaraan schuift ook een deel (€ 0,7 mln.) van de geraamde ontvangsten van de Haven Amsterdam door naar 2014;
-
– Impuls Dynamisch Verkeersmanagement (IDVV): Wat betreft de ontvangsten op dit project is er sprake van een TEN-subsidie van € 3,8 mln. De huidige verwachting is dat dit jaar € 1,8 mln. zal worden ontvangen, waardoor het verschil doorschuift naar 2014;
-
– Overige aanleg ontvangsten: De in de begroting geraamde ontvangsten op het project Zuid Willemvaart-Maas/Veghel ad € 14 mln. zullen dit jaar naar huidige verwachting niet worden gerealiseerd. Daarom wordt voorgesteld deze raming door te schuiven naar 2014.
Artikel 15 Hoofdvaarwegennet | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 15.01 Verkeersmgmt. | 12.770 | 13.336 | 11.803 | 12.652 | 12.651 | 12.651 | 12.651 | 12.651 | 12.651 | 12.651 | 12.651 | 12.672 | 12.672 | 12.672 | 12.672 | 12.672 | |||
Mutaties voorjaarsnota 2013 | 728 | 257 | 260 | 256 | 257 | 257 | 257 | 257 | 268 | 268 | 268 | 247 | 247 | 247 | 247 | 247 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.01 Verkeersmgmt. | 13.498 | 13.593 | 12.063 | 12.908 | 12.908 | 12.908 | 12.908 | 12.908 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | 12.919 | |||
Indexering 2013 | Intens./extens. | 3.432 | 224 | 226 | 200 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 2 |
Mutaties Miljoenennota 2014 | 224 | 226 | 200 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | 214 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.01 Verkeersmgmt. | 13.722 | 13.819 | 12.263 | 13.122 | 13.122 | 13.122 | 13.122 | 13.122 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.01 Verkeersmgmt. | 13.722 | 13.819 | 12.263 | 13.122 | 13.122 | 13.122 | 13.122 | 13.122 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | 13.133 | |||
Ontwerpbegroting 2013 artikelonderdeel 15.02 Beheer, onderh.& verv. | 298.884 | 284.762 | 260.627 | 275.898 | 190.100 | 217.125 | 173.580 | 215.854 | 218.056 | 253.356 | 277.795 | 271.826 | 271.826 | 274.326 | 277.011 | 266.085 | |||
Mutaties voorjaarsnota 2013 | 4.028 | 72.772 | 108.264 | 42.457 | 63.207 | – 2.034 | 39.272 | 5.164 | 20.614 | – 9.971 | – 34.653 | – 8.684 | – 37.684 | – 40.184 | – 44.774 | – 39.555 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.02 Beheer, onderh.& verv. | 302.912 | 357.534 | 368.891 | 318.355 | 253.307 | 215.091 | 212.852 | 221.018 | 238.670 | 243.385 | 243.142 | 263.142 | 234.142 | 234.142 | 232.237 | 226.530 | |||
Indexering 2013 | Intens./extens. | 68.659 | 5.025 | 5.931 | 6.121 | 5.862 | 3.622 | 3.568 | 3.532 | 3.667 | 3.948 | 3.971 | 4.013 | 4.002 | 3.943 | 3.928 | 3.727 | 3.799 | 2 |
Baltic Ace | Intens./extens. | 77.000 | 39.000 | 38.000 | 26 | ||||||||||||||
Mutaties Miljoenennota 2014 | 5.025 | 44.931 | 44.121 | 5.862 | 3.622 | 3.568 | 3.532 | 3.667 | 3.948 | 3.971 | 4.013 | 4.002 | 3.943 | 3.928 | 3.727 | 3.799 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.02 Beheer, onderh.& verv. | 307.937 | 402.465 | 413.012 | 324.217 | 256.929 | 218.659 | 216.384 | 224.685 | 242.618 | 247.356 | 247.155 | 267.144 | 238.085 | 238.070 | 235.964 | 230.329 | |||
Saldo 2013 | Intertemporeel | 0 | – 6.163 | 6.163 | a | ||||||||||||||
Overboeking HXII – IF artikel 15 | Intens./extens. | – 3.263 | – 3.263 | g | |||||||||||||||
Mutaties Najaarsnota 2013 | – 9.426 | 6.163 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.02 Beheer, onderh.& verv. | 298.511 | 408.628 | 413.012 | 324.217 | 256.929 | 218.659 | 216.384 | 224.685 | 242.618 | 247.356 | 247.155 | 267.144 | 238.085 | 238.070 | 235.964 | 230.329 | |||
Ontwerpbegroting 2013 artikelonderdeel 15.03 Aanleg | 284.743 | 339.668 | 289.951 | 218.654 | 242.753 | 197.684 | 224.570 | 61.754 | 229.774 | 159.343 | 126.548 | 85.074 | 198.074 | 238.074 | 253.568 | 10.142 | |||
Mutaties voorjaarsnota 2013 | 46.467 | – 53.656 | – 120.411 | – 36.055 | – 65.648 | – 6.458 | – 41.166 | – 5.757 | – 24.647 | 37.042 | 80.216 | 5.623 | 97.313 | 119.109 | 39.070 | 36.276 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.03 Aanleg | 331.210 | 286.012 | 169.540 | 182.599 | 177.105 | 191.226 | 183.404 | 55.997 | 205.127 | 196.385 | 206.764 | 90.697 | 295.387 | 357.183 | 292.638 | 46.418 | |||
Indexering 2013 | Intens./extens. | 32.742 | 5.142 | 4.525 | 2.670 | 2.218 | 1.586 | 820 | 1.152 | 472 | 3.846 | 88 | 88 | 88 | 3.131 | 3.131 | 3.697 | 88 | 2 |
Overboeking binnen artikel 15 | neutraal | 23.345 | 24.000 | – 655 | 12 | ||||||||||||||
Overboeking HXII – IF artikel 15 | Intens./extens. | – 5.000 | – 5.000 | 15 | |||||||||||||||
Baltic Ace | Intens./extens. | 0 | – 39.000 | – 38.000 | 77.000 | 26 | |||||||||||||
Mutaties Miljoenennota 2014 | 142 | – 34.475 | – 35.330 | 2.218 | 1.586 | 820 | 1.152 | 472 | 80.846 | 88 | 88 | 88 | 3.131 | 3.131 | 27.697 | – 567 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.03 Aanleg | 331.352 | 251.537 | 134.210 | 184.817 | 178.691 | 192.046 | 184.556 | 56.469 | 285.973 | 196.473 | 206.852 | 90.785 | 298.518 | 360.314 | 320.335 | 45.851 | |||
Saldo 2013 | Intertemporeel | 0 | – 35.965 | 35.965 | a | ||||||||||||||
Overboeking HXII – IF artikel 15 | Intens./extens. | 1.500 | 1.500 | g | |||||||||||||||
Mutaties Najaarsnota 2013 | – 34.465 | 35.965 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.03 Aanleg | 296.887 | 287.502 | 134.210 | 184.817 | 178.691 | 192.046 | 184.556 | 56.469 | 285.973 | 196.473 | 206.852 | 90.785 | 298.518 | 360.314 | 320.335 | 45.851 | |||
Ontwerpbegroting 2013 artikelonderdeel 15.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.05 Verk.& Planuitw. voor tracebesl. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 15.06 Netwerk HVWN | 247.723 | 234.036 | 224.847 | 222.822 | 220.998 | 219.440 | 219.284 | 219.240 | 221.402 | 221.402 | 221.402 | 221.777 | 221.777 | 221.777 | 221.777 | 221.777 | |||
Mutaties voorjaarsnota 2013 | 3.929 | 1.994 | 1.937 | 1.923 | 1.912 | 1.901 | 1.900 | 1.899 | 1.995 | 2.237 | 2.370 | 2.493 | 2.751 | 2.744 | 2.768 | 1.960 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.06 Netwerk HVWN | 251.652 | 236.030 | 226.784 | 224.745 | 222.910 | 221.341 | 221.184 | 221.139 | 223.397 | 223.639 | 223.772 | 224.270 | 224.528 | 224.521 | 224.545 | 223.737 | |||
Indexering 2013 | Intens./extens. | 3.530 | 215 | 229 | 217 | 218 | 218 | 218 | 218 | 218 | 218 | 218 | 218 | 225 | 225 | 225 | 225 | 225 | 2 |
Loonbijstelling 2013 | Intens./extens. | 3.594 | 252 | 236 | 227 | 225 | 223 | 221 | 221 | 221 | 221 | 221 | 221 | 221 | 221 | 221 | 221 | 221 | 14 |
Overboeking HXII – IF artikel 15 | Intens./extens. | 5.457 | 3.238 | 2.298 | – 37 | – 42 | 15 | ||||||||||||
Mutaties Miljoenennota 2014 | 3.705 | 2.763 | 407 | 401 | 441 | 439 | 439 | 439 | 439 | 439 | 439 | 446 | 446 | 446 | 446 | 446 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.06 Netwerk HVWN | 255.357 | 238.793 | 227.191 | 225.146 | 223.351 | 221.780 | 221.623 | 221.578 | 223.836 | 224.078 | 224.211 | 224.716 | 224.974 | 224.967 | 224.991 | 224.183 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.06 Netwerk HVWN | 255.357 | 238.793 | 227.191 | 225.146 | 223.351 | 221.780 | 221.623 | 221.578 | 223.836 | 224.078 | 224.211 | 224.716 | 224.974 | 224.967 | 224.991 | 224.183 | |||
Ontwerpbegroting 2013 artikelonderdeel 15.07 Investeringsruimte HVWN | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 65.839 | 39.018 | 18.755 | 100.082 | 137.186 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.07 Investeringsruimte HVWN | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 65.839 | 39.018 | 18.755 | 100.082 | 137.186 | |||
Indexering 2013 | Intens./extens. | – 113.752 | – 11.848 | – 11.451 | – 9.724 | – 8.784 | – 5.888 | – 5.062 | – 5.297 | – 4.853 | – 8.611 | – 4.743 | – 4.735 | – 4.734 | – 7.718 | – 7.703 | – 8.017 | – 4.584 | 2 |
Overboeking binnen artikel 15 | neutraal | – 23.345 | – 24.000 | 655 | 12 | ||||||||||||||
Mutaties Miljoenennota 2014 | – 11.848 | – 11.451 | – 9.724 | – 8.784 | – 5.888 | – 5.062 | – 5.297 | – 4.853 | – 8.611 | – 4.743 | – 4.735 | – 4.734 | – 7.718 | – 7.703 | – 32.017 | – 3.929 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.07 Investeringsruimte HVWN | – 11.848 | – 11.451 | – 9.724 | – 8.784 | – 5.888 | – 5.062 | – 5.297 | – 4.853 | – 8.611 | – 4.743 | – 4.735 | 61.105 | 31.300 | 11.052 | 68.065 | 133.257 | |||
Saldo 2013 | Intertemporeel | 0 | 11.848 | – 11.848 | a | ||||||||||||||
Mutaties Najaarsnota 2013 | 11.848 | – 11.848 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.07 Investeringsruimte HVWN | 0 | – 23.299 | – 9.724 | – 8.784 | – 5.888 | – 5.062 | – 5.297 | – 4.853 | – 8.611 | – 4.743 | – 4.735 | 61.105 | 31.300 | 11.052 | 68.065 | 133.257 | |||
Totaal uitgaven stand ontwerpbegroting 2013 HVWN | 844.120 | 871.802 | 787.228 | 730.026 | 666.502 | 646.900 | 630.085 | 509.499 | 681.883 | 646.752 | 638.396 | 591.349 | 704.349 | 746.849 | 765.028 | 510.676 | |||
Totaal uitgaven stand eerste suppletoire wet 2013 HVWN | 899.272 | 893.169 | 777.278 | 738.607 | 666.230 | 640.566 | 630.348 | 511.062 | 680.113 | 676.328 | 686.597 | 656.867 | 805.994 | 847.520 | 862.421 | 646.790 | |||
Totaal uitgaven stand Miljoenennota 2014 HVWN | 896.520 | 895.163 | 776.952 | 738.518 | 666.205 | 640.545 | 630.388 | 511.001 | 756.949 | 676.297 | 686.616 | 656.883 | 806.010 | 847.536 | 862.488 | 646.753 | |||
Totaal uitgaven stand tweede suppletoire wet 2013 HVWN | 864.477 | 925.443 | 776.952 | 738.518 | 666.205 | 640.545 | 630.388 | 511.001 | 756.949 | 676.297 | 686.616 | 656.883 | 806.010 | 847.536 | 862.488 | 646.753 | |||
Ontwerpbegroting 2013 artikelonderdeel 15.09 Ontvangsten HVWN | 30.036 | 22.155 | 4.444 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 9.174 | 9.958 | 2.232 | 7.530 | 14.510 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 15.09 Ontvangsten HVWN | 39.210 | 32.113 | 6.676 | 7.530 | 14.510 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 15.09 Ontvangsten HVWN | 39.210 | 32.113 | 6.676 | 7.530 | 14.510 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | – 18.268 | 18.268 | a | ||||||||||||||
Mutaties Najaarsnota 2013 | – 18.268 | 18.268 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 15.09 HVWN | 20.942 | 50.381 | 6.676 | 7.530 | 14.510 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Artikel 15 Hoofdvaarwegennet
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat het risico wordt geaccepteerd dat een kasoverschrijding van het Infrastructuurfonds optreedt van maximaal het minbedrag in het betreffende jaar. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
12. Dit betreft de volgende verschuivingen binnen artikel 15 Vaarwegen tussen aanleg en de overige artikelonderdelen:
-
– Risicoreservering BTW Zeetoegang IJmond: In het recente verleden konden regionale partijen bij cofinanciering ten behoeve van bedrijfsmatige activiteiten in sommige gevallen BTW-vrijstelling via Financiën krijgen. Indien dit niet doorgaat bedraagt het rijksdeel in dit risico € 24 mln.;
-
– Enkele relatief kleine bijstellingen/afrondingen.
-
-
14. Dit is de toevoeging aan het Infrastructuurfonds van het uitgekeerde deel van de loonbijstelling 2013. Het betreft de hogere uitgaven voor de werkgever aan ouderdoms- en nabestaandenpensioen en een stijging van de bijdrage in het kader van de Zorgverzekeringswet.
-
15. Via de decentralisatie-uitkering Binnenhavens ontvangt de gemeente Waalwijk € 4,6 mln. Deze gemeente kan de eventueel betaalde BTW terugvorderen via het BTW-compensatiefonds. De genoemde gemeente heeft een plan ingediend waarmee het landelijke netwerk van overslagvoorzieningen voor containervervoer over water wordt versterkt. De aanvraag voldoet hiermee aan de gestelde randvoorwaardelijke criteria. Via de begroting van HXII wordt daarom in totaal € 5 mln. overgeboekt naar het Gemeente- en BTW Compensatiefonds.
Voorts wordt een bijdrage van RWS (uit de artikelen 12, 15 en 18) aan de opdracht PDOK aan het Kadaster en Geonovum voor de jaren 2013–2016 (bijna € 0,3 mln. per jaar) alsmede een bijdrage voor Caribisch Nederland/BES voor investeringen in een Maritieme incidentenorganisatie (totaal € 6 mln.) naar de begroting van HXII overgeboekt.
-
26. Op 5 december 2012 is de Baltic Ace na een aanvaring met de Corvus J gezonken in de vaarroute naar Rotterdam, 65 km ten westen van Goeree. Het scheepswrak bedreigt het mariene milieu en een vlot en veilig scheepvaartverkeer. Op dit gedeelte van de Noordzee is dit een verantwoordelijkheid van IenM/RWS. Dekking van de bergingskosten komt uit Vervanging en Renovaties in 2021.
a en g.
Voor een toelichting op deze mutaties wordt verwezen naar het gestelde onder het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.
Artikel 17 Megaprojecten verkeer en Vervoer
17 Megaprojecten Verkeer en Vervoer | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Verplichtingen | 35.060 | 40.139 | 12.446 | 7.998 | 20.444 | 60.583 |
Uitgaven | 54.157 | 50.435 | 8.229 | – 38.212 | – 29.983 | 20.452 |
Waarvan juridisch verplicht | 100% | |||||
17.01 Westerscheldetunnel | 0 | 4.804 | – 4.519 | 0 | – 4.519 | 285 |
17.02 Betuweroute | 4.699 | 9.545 | 0 | – 3.000 | – 3.000 | 6.545 |
17.03 Hoge snelheidslijn | 0 | 8.294 | 11.742 | – 13.610 | – 1.868 | 6.426 |
17.03.01 Realisatie HSL-zuid | 0 | 8.294 | 11.742 | – 13.610 | – 1.868 | 6.426 |
17.04 Anders betalen voor mobiliteit | 0 | 0 | 0 | 0 | 0 | 0 |
17.06 Project Mainportontwikkeling R'dam | 49.458 | 27.792 | 1.006 | – 21.602 | – 20.596 | 7.196 |
17.09 Ontvangsten | 3.000 | 1.099 | 0 | – 1.000 | – 1.000 | 99 |
Operationele doelstelling 17.02
Van de geraamde kosten voor nazorg van het aanlegproject Betuweroute zal naar verwachting € 3 mln. dit jaar niet worden gerealiseerd en kan dit bedrag via het saldo worden doorgeschoven naar het jaar 2014.
Operationele doelstelling 17.03
Tussen eind 2012 en medio 2013 is de pilot «Geluid Lansingerland» (HSL-Zuid, fase 1) uitgevoerd. De kosten hiervoor bedragen circa € 6,6 mln. en zijn geraamd op de operationele doelstelling 17.03 (Hoge snelheidslijn). De betalingen op dit contract vinden echter plaats ten laste van de operationele doelstelling 13.04 (Geïntegreerde contractvormen/PPS), reden waarom een overboeking wordt aangebracht.
Verder wordt van de geraamde kosten voor nazorg van dit aanlegproject dit jaar naar verwachting € 7 mln. niet gerealiseerd en kan dit via het voordelig saldo doorschuiven naar het jaar 2014.
Project Mainportontwikkeling Rotterdam (17.06) | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
huidig | vorig | huidig | vorig | huidig | vorig | ||
Project Mainportontwikkeling Rotterdam | |||||||
Uitvoeringsorganisatie | 1 | 1 | 24 | 24 | pm | pm | |
750 ha | 30 | 30 | pm | pm | |||
Groene verbinding | 31 | 31 | 2011 | 2011 | |||
Bestaand Rotterdams Gebied (BRG) | 2021 | 2021 | |||||
Landaanwinning | |||||||
Voorfinanciering FES monitoringsprogramma | 2 | 2 | 2007 | 2007 | |||
Voorfinanciering FES natuurcompensatie | 6 | 6 | 113 | 113 | pm | pm | |
Landaanwinning | 742 | 742 | 2013 | 2013 | |||
BTW Buitencontour | 138 | 138 | 2013 | 2013 | |||
Onvoorzien | 0 | 22 | 72 | 72 | pm | pm | 1 |
Afrondingsverschillen | |||||||
Programma | 7 | 29 | 1.152 | 1.152 | |||
Begroting (IF 17.06) | 7 | 29 |
-
1. Voor het jaar 2013 worden geen onvoorziene uitgaven meer verwacht en wordt het budget van € 22 mln. via het voordelig saldo doorgeboekt naar 2014.
Verplichtingen
De bijstelling van de verplichtingenraming betreft een saldo van een verhoging ten behoeve van de HSL-Zuid (realisatie) als gevolg van een scopewijziging waarbij budget overgeheveld is vanuit A4 Burgerveen – Leiden in verband met het gezamenlijk afwikkelen van het schadeschap en een correctie van de verplichtingenruimte op het project PMR die in de Miljoenennota ten onrechte is afgeboekt.
Ontvangsten
Volgens afspraak zou het Havenbedrijf Rotterdam maximaal € 1 mln. aan de kosten voor planschade/nadeelcompensatie bijdragen. Er zijn tot nu toe echter nauwelijks uitkeringen geweest en in 2013 zullen er naar verwachting ook geen vergoedingen volgens deze regeling plaatsvinden. Deze geraamde inkomsten zullen derhalve in 2013 niet worden gerealiseerd en schuiven via het voordelig saldo door naar 2014.
Artikel 17 Megaprojecten Verkeer en Vervoer | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 17.01 W'scheldetunnel | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 4.804 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.01 W'scheldetunnel | 4.804 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Overboeking binnen Infrastructuurfonds | Intens./extens. | – 4.519 | – 4.519 | 5 | |||||||||||||||
Mutaties Miljoenennota 2014 | – 4.519 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 17.01 W'scheldetunnel | 285 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 17.01 W'scheldetunnel | 285 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 17.02 Betuweroute | 4.699 | 6.000 | 6.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 4.846 | 114 | 114 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.02 Betuweroute | 9.545 | 6.114 | 6.114 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 17.02 Betuweroute | 9.545 | 6.114 | 6.114 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | – 3.000 | 3.000 | a | ||||||||||||||
Mutaties Najaarsnota 2013 | – 3.000 | 3.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 17.02 Betuweroute | 6.545 | 9.114 | 6.114 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 17.03 HSL | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 8.294 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.03 HSL | 8.294 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Overboeking binnen Infrastructuurfonds | Intens./extens. | 12.060 | 11.742 | 159 | 159 | 5 | |||||||||||||
Mutaties Miljoenennota 2014 | 11.742 | 159 | 159 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 17.03 HSL | 20.036 | 159 | 159 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | – 7.000 | 7.000 | a | ||||||||||||||
Overboeking binnen Infrastructuurfonds | Intens./extens. | – 6.610 | – 6.610 | i | |||||||||||||||
Mutaties Najaarsnota 2013 | – 13.610 | 7.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 17.03 HSL | 6.426 | 7.159 | 159 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 17.04 ABvM | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.04 ABvM | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 17.04 ABvM | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 17.04 ABvM | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 17.06 PMR | 49.458 | 17.407 | 5.139 | 3.953 | 3.019 | 2.573 | 1.936 | 1.846 | 11.518 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | – 21.666 | 352 | 12.103 | 12.079 | 12.060 | 51 | 39 | 37 | 386 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.06 PMR | 27.792 | 17.759 | 17.242 | 16.032 | 15.079 | 2.624 | 1.975 | 1.883 | 11.904 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Indexering 2013 | Intens./extens. | 2.117 | 1.006 | 336 | 320 | 72 | 47 | 41 | 31 | 31 | 233 | 2 | |||||||
Mutaties Miljoenennota 2014 | 1.006 | 336 | 320 | 72 | 47 | 41 | 31 | 31 | 233 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 17.06 PMR | 28.798 | 18.095 | 17.562 | 16.104 | 15.126 | 2.665 | 2.006 | 1.914 | 12.137 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Saldo 2013 | Intertemporeel | 0 | – 21.602 | 21.602 | a | ||||||||||||||
Mutaties Najaarsnota 2013 | – 21.602 | 21.602 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 17.06 PMR | 7.196 | 39.697 | 17.562 | 16.104 | 15.126 | 2.665 | 2.006 | 1.914 | 12.137 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Totaal uitgaven stand ontwerpbegroting 2013 Mega VenV | 54.157 | 23.407 | 11.139 | 3.953 | 3.019 | 2.573 | 1.936 | 1.846 | 11.518 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Totaal uitgaven stand eerste suppletoire wet 2013 Mega VenV | 50.435 | 23.873 | 23.356 | 16.032 | 15.079 | 2.624 | 1.975 | 1.883 | 11.904 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Totaal uitgaven stand Miljoenennota 2014 Mega VenV | 58.664 | 24.368 | 23.835 | 16.104 | 15.126 | 2.665 | 2.006 | 1.914 | 12.137 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Totaal uitgaven stand tweede suppletoire wet 2013 Mega VenV | 20.452 | 55.970 | 23.835 | 16.104 | 15.126 | 2.665 | 2.006 | 1.914 | 12.137 | 61 | 78 | 68 | 100 | 99 | 102 | 2 | |||
Ontwerpbegroting 2013 artikelonderdeel 17.09 Ontvangsten Mega VenV | 3.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | – 1.901 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 17.09 Ontvangsten Mega VenV | 1.099 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 17.09 Ontvangsten Mega VenV | 1.099 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | – 1.000 | 1.000 | a | ||||||||||||||
Mutaties Najaarsnota 2013 | – 1.000 | 1.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 17.09 Mega VenV | 99 | 1.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Artikel 17 Megaprojecten Verkeer en Vervoer
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling 2013 uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat het risico wordt geaccepteerd dat een kasoverschrijding van het Infrastructuurfonds optreedt van maximaal het minbedrag in het betreffende jaar. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
5. Deze mutatie betreft onderstaande verschuivingen over de diverse aanlegartikelen van het Infrastructuurfonds:
-
– Op operationele doelstelling 17.01 Westerscheldetunnel wordt voor de jaren 2013/2014 nog circa € 0,3 mln. aan claims voor nadeelcompensatie verwacht. Dit bedrag is sterk afhankelijk van de uitspraak van de Raad van State. Na 2014 worden geen claims meer verwacht. Het restant kan daarom worden overgeheveld naar de investeringsruimte op 12.07;
-
– Een overboeking vanuit artikel 13 (Afdekking risico's spoorprogramma's) naar artikel 17 voor de financiering van de pilot «Geluidsmaatregelen Lansingerland». Dit in lijn met de voortgangsinformatie die eerder aan de Tweede Kamer is gezonden (Voortgangsrapportage 31 HSL);
-
– Een budgetoverheveling vanuit artikel 12 (project A4 Burgerveen-Leiden) naar artikel 17 HSL voor het schadeschap A4-HSL.
-
a en i.
Voor een toelichting op deze mutaties wordt verwezen naar het gestelde onder het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.
Artikel 18 Overige uitgaven en ontvangsten
18 Overige uitgaven en ontvangsten | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Verplichtingen | 270.419 | 268.760 | 12.348 | 1.434 | 13.782 | 282.542 |
Uitgaven | 273.614 | 276.738 | 12.530 | 1.334 | 13.864 | 290.602 |
Waarvan juridisch verplicht | 97% | |||||
18.01 Saldo van de afgesloten rekeningen | 0 | 0 | 0 | 0 | 0 | 0 |
18.02 Beter Benutten | 0 | 0 | 0 | 0 | 0 | 0 |
18.03 Intermodaal vervoer | 3.196 | 2.314 | 0 | 0 | 0 | 2.314 |
18.04 Gebiedsgerichte aanpak (UPR) | 0 | 2.374 | 495 | 0 | 495 | 2.869 |
18.05 Railinfrabeheer | 0 | 1 | 0 | 0 | 0 | 1 |
18.06 Externe veiligheid | 0 | 1.013 | 0 | – 900 | – 900 | 113 |
18.07 Mobiliteitsonafhankelijke kennis en expert. | 42 | 264 | 0 | 0 | 0 | 264 |
18.07.01 Natl.basisinfo.voorziening en ov.uitgaven | 42 | 126 | 0 | 0 | 0 | 126 |
18.07.02 Subsidies algemeen | 0 | 138 | 0 | 0 | 0 | 138 |
18.08 Netwerkoverstijgende kosten | 270.376 | 270.772 | 12.035 | 2.234 | 14.269 | 285.041 |
18.08.01 Apparaatskosten RWS | 216.693 | 215.220 | 1.285 | 1.054 | 2.339 | 217.559 |
18.08.02 Overige netwerkoverstijgende kosten | 53.683 | 55.552 | 10.750 | 1.180 | 11.930 | 67.482 |
18.11 Investeringsruimte | 0 | 0 | 0 | 0 | 0 | 0 |
18.11.01 Programmaruimte | 0 | 0 | 0 | 0 | 0 | 0 |
18.11.02 Beleidsruimte | 0 | 0 | 0 | 0 | 0 | 0 |
18.12 Nader toe te wijzen BenO en Vervanging | 0 | 0 | 0 | 0 | 0 | 0 |
18.12.01 Beheer en onderhoud | 0 | 0 | 0 | 0 | 0 | 0 |
18.12.02 Vervanging | 0 | 0 | 0 | 0 | 0 | 0 |
18.13 Tol gefinancierde uitgaven | 0 | 0 | 0 | 0 | 0 | 0 |
18.09 Ontvangsten | 0 | 0 | 0 | 0 | 0 | 0 |
18.09.01 Ontvangsten | 0 | 0 | 0 | 0 | 0 | 0 |
18.09.02 Tolopgave | 0 | 0 | 0 | 0 | 0 | 0 |
18.10 Saldo van de afgesloten rekeningen | 0 | 147.317 | 0 | 0 | 0 | 147.317 |
Operationele doelstelling 18.03
Projectoverzicht Intermodaal Vervoer (18.03) | Kasbudget 2013 | Projectbudget | Oplevering | Toelichting | |||
---|---|---|---|---|---|---|---|
huidig | vorig | huidig | vorig | huidig | vorig | ||
Multi- en modaalvervoer | |||||||
Container Transferium Alblasserdam | 0 | 0 | 5 | 5 | 2014 | 2014 | |
RSC Maasvlakte | 2 | 2 | 8 | 8 | |||
Programma | 2 | 2 | 13 | 13 | |||
Begroting (IF 18.03) | 2 | 2 | |||||
Overprogrammering (–) | 0 | 0 |
Operationele doelstelling 18.06
Dit budget betreft het saneren van alle kwetsbare objecten in de veiligheidszone (basisnet weg en spoor), waarvoor in 2012 een bedrag van in totaal € 13,5 mln. voor de periode tot en met 2020 beschikbaar is gesteld. Naar verwachting wordt in 2013 € 0,9 mln. van de geraamde uitgaven (en € 0,8 mln. van de verplichtingen) niet besteed. De reden hiervan is dat mogelijke verkopers de gunstigere regeling na de invoering van het Basisnet afwachten. De onderuitputting wordt via het voordelig saldo van het Infrastructuurfonds overgeboekt naar 2014.
Verplichtingen
De mutatie op de verplichtingenbegroting staat geheel in relatie met de mutaties in de kasuitgaven en betreft voor het grootste deel de vordering van Rijkswaterstaat op IenM.
Artikel 18 Overige uitgaven en ontvangsten | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 18.01 Saldo afgesl.rekg. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.01 Saldo afgesl.rekg. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.01 Saldo afgesl.rekg. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | – 4.307 | – 4.307 | a | |||||||||||||||
Mutaties Najaarsnota 2013 | 0 | – 4.307 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.01 Saldo afgesl.rekg. | 0 | – 4.307 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.02 Beter Benutten | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 50.000 | 125.000 | 125.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.02 Beter Benutten | 0 | 0 | 50.000 | 125.000 | 125.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.02 Beter Benutten | 0 | 0 | 50.000 | 125.000 | 125.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.02 Beter Benutten | 0 | 0 | 50.000 | 125.000 | 125.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.03 Intermod.verv. | 3.196 | 2.000 | 3.000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | – 882 | 3.965 | 57 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.03 Intermod.verv. | 2.314 | 5.965 | 3.057 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.03 Intermod.verv. | 2.314 | 5.965 | 3.057 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.03 Intermod.verv. | 2.314 | 5.965 | 3.057 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.04 Geb. aanpak | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 2.374 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.04 Geb. aanpak | 2.374 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Overboeking binnen Infrastructuurfonds | Intens./extens. | 495 | 495 | 5 | |||||||||||||||
Mutaties Miljoenennota 2014 | 495 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.04 Geb. aanpak | 2.869 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.04 Geb. aanpak | 2.869 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.05 Railinfrabeh. | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.05 Railinfrabeh. | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.05 Railinfrabeh. | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.05 Railinfrabeh. | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.06 Ext.veiligheid | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 1.013 | 2.526 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.06 Ext.veiligheid | 1.013 | 2.526 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.06 Ext.veiligheid | 1.013 | 2.526 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Saldo 2013 | Intertemporeel | 0 | – 900 | 900 | a | ||||||||||||||
Mutaties Najaarsnota 2013 | – 900 | 900 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.06 Ext.veiligheid | 113 | 3.426 | 2.000 | 2.009 | 2.000 | 1.000 | 1.000 | 898 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.07 Mob.onafh. Kennis/Exp. | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 222 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.07 Mob.onafh. Kennis/Exp. | 264 | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.07 Mob.onafh. Kennis/Exp. | 264 | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.07 Mob.onafh. Kennis/Exp. | 264 | 42 | 42 | 42 | 42 | 42 | 42 | 42 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.08 Netwerkoverst.kosten | 270.376 | 252.459 | 244.487 | 237.001 | 238.024 | 237.355 | 232.502 | 232.380 | 232.766 | 232.766 | 232.766 | 233.794 | 233.794 | 233.794 | 233.794 | 233.794 | |||
Mutaties voorjaarsnota 2013 | 396 | – 719 | – 760 | – 19.104 | – 38.492 | – 53.625 | – 53.656 | – 53.658 | – 53.403 | – 52.747 | – 52.386 | – 52.051 | – 51.352 | – 51.371 | – 51.307 | – 53.498 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.08 Netwerkoverst.kosten | 270.772 | 251.740 | 243.727 | 217.897 | 199.532 | 183.730 | 178.846 | 178.722 | 179.363 | 180.019 | 180.380 | 181.743 | 182.442 | 182.423 | 182.487 | 180.296 | |||
Indexering 2013 | Intens./extens. | 13.081 | 947 | 815 | 782 | 797 | 804 | 803 | 804 | 803 | 805 | 805 | 805 | 822 | 822 | 822 | 822 | 823 | 2 |
Netwerkoverstijgende kosten | Intens./extens. | 105.607 | 9.482 | 8.796 | 7.345 | 16.065 | 14.415 | 6.011 | 8.701 | 8.707 | 8.763 | 8.661 | 8.661 | 4 | |||||
Overboeking HXII – IF artikel 18 | Intens./extens. | 7.659 | 1.374 | 629 | 629 | 629 | 629 | 629 | 314 | 314 | 314 | 314 | 314 | 314 | 314 | 314 | 314 | 314 | 10 |
Loonbijstelling 2013 | Intens./extens. | 3.316 | 232 | 219 | 213 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 204 | 14 |
Overboeking HXII – IF artikel 18 | Intens./extens. | – 535.500 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | 27 | |
Mutaties Miljoenennota 2014 | 12.035 | – 25.241 | – 26.731 | – 18.005 | – 19.648 | – 28.053 | – 25.677 | – 25.672 | – 25.614 | – 25.716 | – 25.716 | – 34.360 | – 34.360 | – 34.360 | – 34.360 | – 34.359 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.08 Netwerkoverst.kosten | 282.807 | 226.499 | 216.996 | 199.892 | 179.884 | 155.677 | 153.169 | 153.050 | 153.749 | 154.303 | 154.664 | 147.383 | 148.082 | 148.063 | 148.127 | 145.937 | |||
Overboeking HXII – IF artikel 18 | Intens./extens. | 2.234 | 2.234 | h | |||||||||||||||
Mutaties Najaarsnota 2013 | 2.234 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.08 Netwerkoverst.kosten | 285.041 | 226.499 | 216.996 | 199.892 | 179.884 | 155.677 | 153.169 | 153.050 | 153.749 | 154.303 | 154.664 | 147.383 | 148.082 | 148.063 | 148.127 | 145.937 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.11 Investeringsruimte | 0 | 0 | 0 | 0 | 15.418 | 33.376 | 150.161 | 173.203 | 144.987 | 579.234 | 842.725 | 1.087.730 | 1.598.826 | 1.585.044 | 1.631.799 | 1.893.035 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | – 11.693 | – 25.311 | – 113.878 | – 131.353 | – 133.994 | – 579.234 | – 842.725 | – 1.087.731 | – 1.598.827 | – 1.585.044 | – 1.631.799 | – 1.893.036 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.11 Investeringruimte | 0 | 0 | 0 | 0 | 3.725 | 8.065 | 36.283 | 41.850 | 10.993 | 0 | 0 | – 1 | – 1 | 0 | 0 | – 1 | |||
Overbioeking HXII – IF KRW | Intens./extens. | – 100.917 | – 3.725 | – 8.065 | – 36.283 | – 41.850 | – 10.994 | 13 | |||||||||||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | – 3.725 | – 8.065 | – 36.283 | – 41.850 | – 10.994 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.11 Invest.ruimte | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | – 1 | 0 | 0 | – 1 | – 1 | 0 | 0 | – 1 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.11 Invest.ruimte | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | – 1 | 0 | 0 | – 1 | – 1 | 0 | 0 | – 1 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.12 Nader toe te wijzen B&O&V | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | 494.593 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | 9.371 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.12 Nader toe te wijzen B&O&V | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | 503.964 | |||
DBFM A1/A6 SAA | Intens./extens. | – 67.140 | – 12.990 | – 12.990 | – 6.860 | – 6.860 | – 6.860 | – 6.860 | – 6.860 | – 6.860 | 20 | ||||||||
Areaalgroei (artikel 12) | Intens./extens. | – 386.534 | – 58.245 | – 58.245 | – 58.245 | – 58.245 | – 58.245 | – 31.770 | – 31.770 | – 31.770 | 25 | ||||||||
Baltic Ace | Intens./extens. | – 77.000 | – 77.000 | 26 | |||||||||||||||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | – 148.235 | – 71.235 | – 65.105 | – 65.105 | – 65.105 | – 38.630 | – 38.630 | – 38.630 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.12 Nader toe te wijzen B&O&V | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 355.729 | 432.729 | 438.859 | 438.859 | 438.859 | 465.334 | 465.334 | 465.334 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.12 Nader toe te wijzen B&O&V | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 355.729 | 432.729 | 438.859 | 438.859 | 438.859 | 465.334 | 465.334 | 465.334 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.13 Tol gefinanc.uitgaven | 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.13 Tol gefinanc.uitgaven | 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |||
Aanpassing tolreeksen naar prijspeil 2013 en verhoging NWO. | Desaldering | 69.862 | 649 | 649 | 1.093 | 1.093 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | 28 | ||||||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 649 | 649 | 1.093 | 1.093 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.13 Tol gefinanc.uitgaven | 0 | 0 | 0 | 0 | 0 | 0 | 18.732 | 18.732 | 31.555 | 31.555 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.13 Tol gefinanc.uitgaven | 0 | 0 | 0 | 0 | 0 | 0 | 18.732 | 18.732 | 31.555 | 31.555 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | |||
Totaal uitgaven stand ontwerpbegroting 2013 Overige uitg.en ontv. | 273.614 | 254.501 | 247.529 | 237.043 | 253.484 | 270.773 | 400.788 | 423.708 | 902.808 | 1.337.055 | 1.610.467 | 1.856.500 | 2.367.596 | 2.353.814 | 2.400.569 | 2.661.805 | |||
Totaal uitgaven stand eerste suppletoire wet 2013 Overige uitg.en ontv. | 276.738 | 260.273 | 298.826 | 344.948 | 330.299 | 192.837 | 234.254 | 239.595 | 724.782 | 714.445 | 724.727 | 726.089 | 726.788 | 726.770 | 726.834 | 724.642 | |||
Totaal uitgaven stand Miljoenennota 2014 Overige uitg.en ontv. | 289.268 | 235.032 | 272.095 | 326.943 | 306.926 | 156.719 | 172.943 | 172.722 | 541.032 | 618.587 | 644.969 | 637.687 | 638.386 | 664.843 | 664.907 | 662.716 | |||
Totaal uitgaven stand tweede suppletoire wet 2013 Overige uitg.en ontv. | 290.602 | 231.625 | 272.095 | 326.943 | 306.926 | 156.719 | 172.943 | 172.722 | 541.032 | 618.587 | 644.969 | 637.687 | 638.386 | 664.843 | 664.907 | 662.716 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.09 Ontvangsten | 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |||
Mutaties voorjaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.09 Ontvangsten Overige uitg.en ontv. | 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |||
Aanpassing tolreeksen naar prijspeil 2013 en verhoging NWO. | Desaldering | 69.862 | 649 | 649 | 1.093 | 1.093 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | 28 | ||||||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 649 | 649 | 1.093 | 1.093 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | 11.063 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.09 Ontvangsten Overige uitg.en ontv. | 0 | 0 | 0 | 0 | 0 | 0 | 18.732 | 18.732 | 31.555 | 31.555 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.09 Ontvangsten Overige uitg.en ontv. | 0 | 0 | 0 | 0 | 0 | 0 | 18.732 | 18.732 | 31.555 | 31.555 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | |||
Ontwerpbegroting 2013 artikelonderdeel 18.10 Voordelig saldo | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties voorjaarsnota 2013 | 147.317 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 18.10 Voordelig saldo | 147.317 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Miljoenennota 2014 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 18.10 Voordelig saldo | 147.317 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Mutaties Najaarsnota 2013 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 18.10 Voordelig saldo | 147.317 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Totaal ontvangsten stand ontwerpbegroting 2013 Overige uitg.en ontv. | 0 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |||
Totaal ontvangsten stand eerste suppletoire wet 2013 Overige uitg.en ontv. | 147.317 | 0 | 0 | 0 | 0 | 0 | 18.083 | 18.083 | 30.462 | 30.462 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | 40.383 | |||
Totaal ontvangsten stand Miljoenennota 2014 Overige uitg.en ontv. | 147.317 | 0 | 0 | 0 | 0 | 0 | 18.732 | 18.732 | 31.555 | 31.555 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | |||
Totaal ontvangsten stand tweede suppletoire wet 2013 Overige uitg.en ontv. | 147.317 | 0 | 0 | 0 | 0 | 0 | 18.732 | 18.732 | 31.555 | 31.555 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 | 51.446 |
Artikel 18 Overige uitgaven en ontvangsten
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat het risico wordt geaccepteerd dat een kasoverschrijding van het Infrastructuurfonds optreedt van maximaal het minbedrag in het betreffende jaar. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
4. In 2009 is heeft het Ministerie van Financiën toestemming verleend om een deel van de vordering van RWS op IenM in een periode van 15 jaar af te betalen. Hiervoor is een 15-jarige kasreeks in de begroting opgenomen. Deze reeks is technisch opgenomen in artikel 12.02 (Beheer en Onderhoud). Deze bijdrage is echter niet voor Beheer en Onderhoud bedoeld. Voorgesteld wordt om de afbetalingsreeks op te nemen in artikel 18.08.02 (Overige netwerkoverstijgende kosten).
-
5. Deze mutatie houdt verband met een afrekening Hollandse Brug OV SAAL-RRAAM: Met betrekking tot de Hollandse brug variant in relatie tot OV SAAL MT is afgesproken dat van het geraamde budget ad circa € 1,8 mln. OV SAAL 2/3 voor haar rekening neemt (Infrastructuurfonds begrotingsartikel 13) en RRAAM 1/3 (Infrastructuurfonds begrotingsartikel 18). De totale realisatie bedraagt uiteindelijk € 1,7 mln. Volgens de verdeelsleutel vindt een budgettaire compensatie plaats van afgerond € 495.000 vanuit OV SAAL naar RRAAM.
-
10. Tussen de begroting van HXII en dit artikel worden de volgende overboekingen aangebracht:
-
– De overdracht van 3,9 fte’s van de Hoofddirectie Bestuurlijke en Juridische Zaken (HBJZ) naar RWS (€ 0,3 mln.);
-
– Een vergoeding aan RWS voor de 1 procent regeling voor mensen met afstand tot arbeidsmarkt (€ 0,3 mln.);
-
– Een overboeking van 0,5 fte naar RWS/PPS/DBFM (€ 0,1 mln.);
-
– Een overboeking van € 0,1 mln. voor depotruimte Nationaal Archief;
-
– Opdrachtverstrekking aan Deltares voor verschillende Rijkscoördinatieregelingprojecten (RCR) (€ 0,1 mln.);
-
– De overdracht van het personeel belast met de ARBO-taken van SSO/HRM naar RWS (€ 0,5 mln. structureel);
-
– Overboeking van Ministerie van EZ voor aanvullende opdracht aan SPA Deltares wegens verschillende RCR projecten (€ 0,3 mln.);
-
– Een overboeking van DCO naar RWS voor de campagne van A naar Beter (€ 0,1 mln.);
-
– Een bijdrage van RWS van in totaal bijna 0,3 mln. per jaar (uit de artikelen 12, 15 en 18) aan de opdracht PDOK aan het Kadaster en Geonovum voor de jaren 2013–2016.
-
-
13. De resterende programmaruimte op dit artikel (€ 100 mln.) wordt overgeboekt naar de begroting van HXII en betrokken bij het oplossen van de KRW-problemen (Kaderrichtlijn Water). Een daarvoor benodigde kasschuif wordt aangebracht via het Deltafonds.
-
14. Dit is de toevoeging aan het Infrastructuurfonds van het uitgekeerde deel van de loonbijstelling 2013. Het betreft de hogere uitgaven voor de werkgever aan ouderdoms- en nabestaandenpensioen en een stijging van de bijdrage in het kader van de Zorgverzekeringswet.
-
20. Bij het DBFM-contract voor het project A1/A6 Schiphol Amsterdam Almere heeft de «financial close» plaatsgevonden, dit is budgettair verwerkt.
-
25. Dit betreft het treffen van een reservering voor consequenties areaalgroei op beheer en onderhoud wegen onder planuitwerking vanuit de Investeringsruimte wegen en vanuit de bestaande reservering op artikel 18.12. Voor een nadere toelichting wordt verwezen naar «Bijlage 5 Beheer en Onderhoud».
-
26. Op 5 december 2012 is de Baltic Ace na een aanvaring met de Corvus J gezonken in de vaarroute naar Rotterdam, 65 km ten westen van Goeree. Het scheepswrak bedreigt het mariene milieu en een vlot en veilig scheepvaartverkeer. Op dit gedeelte van de Noordzee is dit een verantwoordelijkheid van IenM/RWS. Dekking van de bergingskosten komt uit Vervanging en Renovaties in 2021.
-
27. De inkomsten die in de begroting stonden voor Het Rijksvastgoed- en ontwikkelingsbedrijf (RVOB) worden overgebracht naar IenM. Het gaat hierbij om inkomsten uit areaal waarop RWS het materieel respectievelijk feitelijk beheer uitvoert. Extra opbrengsten die IenM (RWS) realiseert bovenop dit bedrag kunnen door IenM (RWS) ingezet worden. De middelenoverboeking van RVOB naar IenM (RWS) betreft in totaal € 35,7 mln. per jaar. Deze overboeking wordt zichtbaar bij de opbrengst derden in de staat van baten en lasten en is als volgt opgebouwd: € 19,5 mln. structurele ontvangsten uit de pacht van «benzinestations, € 11,5 mln. structurele ontvangsten uit de ingebruikgeving van RWS areaal (huur, pacht) en € 4,7 mln. structurele ontvangsten uit incidentele verkoop van RWS areaal. De bijdrage van de begroting van Hoofdstuk XII aan het Infrastructuurfonds alsmede de Overige netwerkoverstijgende kosten op het Infrastructuurfonds (artikel 18.08 «Apparaatskosten Rijkswaterstaat») worden overeenkomstig verlaagd met € 35,7 mln.
-
28. De tolreeksen zijn geïndexeerd naar prijspeil 2013. Daarnaast is de tolopgave van de NWO verhoogd naar € 300 mln. De gehanteerde IBOI cijfers zijn 1,895% voor 2012 en 1,659% voor 2013.
a en h.
Voor een toelichting op deze mutaties wordt verwezen naar het gestelde onder het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.
Artikel 19 Bijdragen andere begrotingen Rijk
19 Bijdragen andere begrotingen Rijk | Stand ontwerp begroting | Stand 1e suppletoire begroting | Mutaties 2e suppletoire begroting | Mutaties 2e suppletoire begroting | Stand 2e suppletoire begroting | |
---|---|---|---|---|---|---|
Milj.nota | Najaarsnota | |||||
(1) | (2) | (3) | (4) | (5)=(3)+(4) | (6)=(2)+(5) | |
Ontvangsten | 5.879.349 | 5.812.220 | – 77.308 | – 15.196 | – 92.504 | 5.719.716 |
19.09 Ten laste van begroting IenM | 5.879.349 | 5.812.220 | – 77.308 | – 15.196 | – 92.504 | 5.719.716 |
Artikel 19 Bijdragen andere begrotingen Rijk | Categorie | Totaal mutatie | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Toelichting |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ontwerpbegroting 2013 artikelonderdeel 19.09 | 5.879.349 | 6.608.356 | 5.640.937 | 5.877.752 | 6.039.905 | 5.806.026 | 6.037.906 | 6.105.183 | 5.467.346 | 5.715.923 | 5.716.664 | 5.617.274 | 5.599.948 | 5.602.233 | 5.602.201 | 5.596.070 | |||
Mutaties voorjaarsnota 2013 | – 67.129 | – 86.717 | – 105.200 | – 110.432 | – 142.130 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | – 164.083 | |||
Stand eerste suppletoire wet 2013 artikelonderdeel 19.09 | 5.812.220 | 6.521.639 | 5.535.737 | 5.767.320 | 5.897.775 | 5.641.943 | 5.873.823 | 5.941.100 | 5.303.263 | 5.551.840 | 5.552.581 | 5.453.191 | 5.435.865 | 5.438.150 | 5.438.118 | 5.431.987 | |||
Indexering 2013 | Intens./extens. | 2.616 | 189 | 163 | 156 | 159 | 161 | 161 | 322 | 0 | 322 | 0 | 161 | 165 | 165 | 164 | 328 | 2 | |
Overboeking HXII – IF artikel 12 | Intens./extens. | – 13.325 | – 3.470 | – 174 | – 374 | – 3.443 | – 5.512 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | – 32 | 6 |
Overboeking HXII – IF artikel 13 | Intens./extens. | – 11.400 | – 2.500 | – 2.900 | – 6.000 | 9 | |||||||||||||
Overboeking HXII – IF artikel 18 | Intens./extens. | 10.659 | 1.374 | 829 | 829 | 829 | 829 | 829 | 514 | 514 | 514 | 514 | 514 | 514 | 514 | 514 | 514 | 514 | 10 |
Overboeking HXII – IF artikel 14 | Intens./extens. | – 7.262 | – 2.500 | – 4.762 | 11 | ||||||||||||||
Overbioeking HXII – IF KRW | Intens./extens. | – 100.917 | – 3.725 | – 8.065 | – 36.283 | – 41.850 | – 10.994 | 13 | |||||||||||
Loonbijstelling 2013 | Intens./extens. | 24.142 | 1.804 | 1.591 | 1.555 | 1.387 | 1.514 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 1.481 | 14 |
Overboeking HXII – IF artikel 15 | Intens./extens. | 457 | – 1.762 | 2.298 | – 37 | – 42 | 15 | ||||||||||||
DBFM N33 Assen-Zuidbroek | Intens./extens. | 8.161 | – 60.156 | – 75.946 | 10.275 | 10.275 | 10.275 | 10.275 | 10.275 | 10.292 | 10.292 | 10.292 | 10.292 | 10.292 | 10.357 | 10.357 | 10.357 | 10.357 | 18 |
DBFM A1/A6 SAA | Intens./extens. | – 88.303 | – 12.787 | – 45.746 | – 170.058 | – 436.003 | 127.051 | 46.847 | 40.717 | 40.717 | 39.987 | 39.987 | 40.174 | 40.174 | 40.174 | 40.174 | 40.174 | 40.115 | 20 |
Overboeking HXII – IF artikel 18 | Intens./extens. | – 535.500 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | – 35.700 | 27 | |
Mutaties Miljoenennota 2014 | – 77.308 | – 158.085 | – 199.354 | – 467.300 | 94.893 | 15.796 | – 18.706 | – 24.578 | 5.870 | 16.542 | 16.890 | 16.894 | 16.959 | 16.958 | 17.122 | 16.735 | |||
Stand ontwerpbegroting 2014 artikelonderdeel 19.09 | 5.734.912 | 6.363.554 | 5.336.383 | 5.300.020 | 5.992.668 | 5.657.739 | 5.855.117 | 5.916.522 | 5.309.133 | 5.568.382 | 5.569.471 | 5.470.085 | 5.452.824 | 5.455.108 | 5.455.240 | 5.448.722 | |||
Overboeking HXII – IF artikel 12 | Intens./extens. | 400 | 400 | d | |||||||||||||||
Overboeking HXII – IF artikel 13 | Intens./extens. | – 18.377 | – 18.377 | e | |||||||||||||||
Overboeking HXII – IF artikel 14 | Intens./extens. | 2.310 | 2.310 | f | |||||||||||||||
Overboeking HXII – IF artikel 15 | Intens./extens. | – 1.763 | – 1.763 | g | |||||||||||||||
Overboeking HXII – IF artikel 18 | Intens./extens. | 2.234 | 2.234 | h | |||||||||||||||
Mutaties Najaarsnota 2013 | – 15.196 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Stand tweede suppletoire wet 2013 artikelonderdeel 19.09 | 5.719.716 | 6.363.554 | 5.336.383 | 5.300.020 | 5.992.668 | 5.657.739 | 5.855.117 | 5.916.522 | 5.309.133 | 5.568.382 | 5.569.471 | 5.470.085 | 5.452.824 | 5.455.108 | 5.455.240 | 5.448.722 | |||
Totaal uitgaven stand ontwerpbegroting 2013 HWN | 5.879.349 | 6.608.356 | 5.640.937 | 5.877.752 | 6.039.905 | 5.806.026 | 6.037.906 | 6.105.183 | 5.467.346 | 5.715.923 | 5.716.664 | 5.617.274 | 5.599.948 | 5.602.233 | 5.602.201 | 5.596.070 | |||
Totaal ontvangsten stand eerste suppletoire wet 2013 | 5.812.220 | 6.521.639 | 5.535.737 | 5.767.320 | 5.897.775 | 5.641.943 | 5.873.823 | 5.941.100 | 5.303.263 | 5.551.840 | 5.552.581 | 5.453.191 | 5.435.865 | 5.438.150 | 5.438.118 | 5.431.987 | |||
Totaal ontvangsten stand Miljoenennota 2014 | 5.734.912 | 6.363.554 | 5.336.383 | 5.300.020 | 5.992.668 | 5.657.739 | 5.855.117 | 5.916.522 | 5.309.133 | 5.568.382 | 5.569.471 | 5.470.085 | 5.452.824 | 5.455.108 | 5.455.240 | 5.448.722 | |||
Totaal ontvangsten stand tweede suppletoire wet 2013 | 5.719.716 | 6.363.554 | 5.336.383 | 5.300.020 | 5.992.668 | 5.657.739 | 5.855.117 | 5.916.522 | 5.309.133 | 5.568.382 | 5.569.471 | 5.470.085 | 5.452.824 | 5.455.108 | 5.455.240 | 5.448.722 |
Artikel 19 Bijdragen andere begrotingen Rijk
-
2. IenM dekt in de ontwerpbegroting over 2014 het budgettaire probleem dat is ontstaan door het niet uitkeren van de prijsbijstelling uit de resterende Investeringsruimte per investeringsdomein. Er resteert dan een kasritmeprobleem. IenM lost dit uiterlijk bij ontwerpbegroting 2017 op, maar zo mogelijk eerder bij een eerstvolgende herijking van het Investeringsprogramma. Dit impliceert dat het risico wordt geaccepteerd dat een kasoverschrijding van het Infrastructuurfonds optreedt van maximaal het minbedrag in het betreffende jaar. IenM zal er desalniettemin op sturen om binnen de aangepaste kasranden te blijven.
-
6. Tussen de begroting van HXII en artikel 12 worden de volgende overboekingen aangebracht:
-
– Subsidieregeling Euro-VI (schone motoren vrachtwagens en bussen): voor 2013 wordt een bedrag van € 5 mln. overgeheveld. De uitvoering van deze regeling wordt verantwoord op artikel 20 in de begroting van HXII;
-
– Beter Benutten: vanuit artikel 12 Beter benutten vindt een overboeking plaats naar de Begroting van HXII voor programmakosten en externe inhuur door het verlengen van de projectduur (in totaal € 1,2 mln.). Tevens worden vanuit de Begroting van hoofdstuk XII de in 2012 onbesteed gebleven gelden voor Beter Benutten (circa € 0,8 mln.) teruggeboekt naar artikel 12 in het fonds voor het in standhouden van het projecttotaal van Beter Benutten.
-
– Bijdrage van RWS (uit de artikelen 12, 15 en 18) aan de opdracht PDOK aan het Kadaster en Geonovum voor de jaren 2013–2016 (bijna € 0,3 mln. per jaar);
-
– Een overboeking naar het Ministerie van BZK voor de elektronische publicatie van verkeersbesluiten (€ 0,1 mln.) en een overboeking vanuit de Begroting van HXII (€ 0,9 mln.) in dit kader.
-
-
9. Uit artikel 13 worden de volgende overboekingen naar de Begroting van hoofdstuk XII aangebracht voor:
-
– Gelden voor het onderzoek Roadmap ERTMS (€ 2,5 mln.);
-
– De BDU voor de verlenging Spoorlijn van Roodeschool naar Eemshaven (€ 2,9 mln.).
-
-
10. Tussen de begroting van HXII en artikel 18 worden de volgende overboekingen aangebracht:
-
– De overdracht van 3,9 fte’s van de Hoofddirectie Bestuurlijke en Juridische Zaken (HBJZ) naar RWS (€ 0,3 mln.);
-
– Een vergoeding aan RWS voor de 1 procent regeling voor mensen met afstand tot arbeidsmarkt (€ 0,3 mln.);
-
– Een overboeking van 0,5 fte naar RWS/PPS/DBFM (€ 0,1 mln.);
-
– Een overboeking van € 0,1 mln. voor depotruimte Nationaal Archief en
-
– Opdrachtverstrekking aan Deltares voor verschillende Rijkscoördinatieregelingprojecten (RCR) (€ 0,1 mln.)
-
– De overdracht van het personeel belast met de ARBO-taken van SSO/HRM naar RWS (€ 0,5 mln. structureel);
-
– Overboeking van het Ministerie van EZ voor een aanvullende opdracht aan SPA Deltares wegens verschillende RCR projecten (€ 0,3 mln.);
-
– Een overboeking van DCO naar RWS voor de campagne van A naar Beter (€ 0,1 mln.);
-
– Een bijdrage van RWS (uit de artikelen 12, 15 en 18) aan de opdracht PDOK aan het Kadaster en Geonovum voor de jaren 2013–2016 (bijna € 0,3 mln. per jaar).
-
-
11. De BDU voor het jaar 2013 is in december 2012 vastgesteld. Daarin is overeenkomstig de gebruikelijke werkwijze een forfaitaire index opgenomen. Vanuit artikel 14 Regionaal/lokale infrastructuur wordt dekking geboden voor het niet uitkeren van de prijsindex en overgeboekt naar de begroting van HXII.
-
13. De resterende programmaruimte op dit artikel (€ 100 mln.) wordt overgeboekt naar de begroting van HXII en betrokken bij het oplossen van de KRW-problemen (Kaderrichtlijn Water). Een daarvoor benodigde kasschuif wordt aangebracht via het Deltafonds.
-
14. Dit is de toevoeging aan het Infrastructuurfonds van het uitgekeerde deel van de loonbijstelling 2013. Het betreft de hogere uitgaven voor de werkgever aan ouderdoms- en nabestaandenpensioen en een stijging van de bijdrage in het kader van de Zorgverzekeringswet.
-
15. Via de decentralisatie-uitkering Binnenhavens ontvangt de gemeente Waalwijk € 4,6 mln. Deze gemeente kan de eventueel betaalde BTW terugvorderen via het BTW-compensatiefonds. De genoemde gemeente heeft een plan ingediend waarmee het landelijke netwerk van overslagvoorzieningen voor containervervoer over water wordt versterkt. De aanvraag voldoet hiermee aan de gestelde randvoorwaardelijke criteria. Uit artikel 15 wordt via de Begroting van hoofdstuk XII daarom in totaal € 5 mln. overgeboekt naar het Gemeente- en BTW Compensatiefonds.
Voorts wordt een bijdrage van RWS (uit de artikelen 12, 15 en 18) aan de opdracht PDOK aan het Kadaster en Geonovum voor de jaren 2013–2016 (bijna € 0,3 mln. per jaar) alsmede een bijdrage voor Caribisch Nederland/BES voor investeringen in een Maritieme incidentenorganisatie (totaal € 6 mln.) naar de begroting van HXII overgeboekt.
-
18. Bij het DBFM-contract (Design, Build, Finance & Maintain) voor het project N33 Assen-Zuidbroek heeft de «financial close» plaatsgevonden. Op verzoek van het Ministerie van Financiën wordt hier een proef uitgevoerd waarbij inflatiegerelateerde vergoedingen wordt uitbetaald. Een consequentie van deze proef is dat de mijlpaalvergoeding binnen het contract gemaximaliseerd is op 5 procent van de investeringssom.
-
20. Bij het DBFM-contract voor het project A1/A6 Schiphol Amsterdam Almere heeft de «financial close» plaatsgevonden, dit is budgettair verwerkt.
-
27. De inkomsten die in de begroting stonden voor Het Rijksvastgoed- en ontwikkelingsbedrijf (RVOB) worden overgebracht naar IenM. Het gaat hierbij om inkomsten uit areaal waarop RWS het materieel respectievelijk feitelijk beheer uitvoert. Extra opbrengsten die IenM (RWS) realiseert bovenop dit bedrag kunnen door IenM (RWS) ingezet worden. De middelenoverboeking van RVOB naar IenM (RWS) betreft in totaal € 35,7 mln. per jaar. Deze overboeking wordt zichtbaar bij de opbrengst derden in de staat van baten en lasten en is als volgt opgebouwd: € 19,5 mln. structurele ontvangsten uit de pacht van «benzinestations, € 11,5 mln. structurele ontvangsten uit de ingebruikgeving van RWS areaal (huur, pacht) en € 4,7 mln. structurele ontvangsten uit incidentele verkoop van RWS areaal. De bijdrage van de begroting van Hoofdstuk XII aan het Infrastructuurfonds alsmede de Overige netwerkoverstijgende kosten op het Infrastructuurfonds (artikel 18.08 «Apparaatskosten Rijkswaterstaat») worden overeenkomstig verlaagd met € 35,7 mln.
d t/m h.
Voor een toelichting op deze mutaties wordt verwezen naar het gestelde onder het Overzicht belangrijkste uitgaven- en ontvangsten mutaties (par. 2.1) onder de Begrotingstoelichting.